CSIRO Commences On-Site Work at Mt Carrington
Released
Released
Announcement PDF
Page 1 of 7 | ABN 43 650 398 897
12/217 Howick St, Bathurst, 2795
www.legacyminerals.com.au
1
Refer Endnotes on page 7 for cross references.
CSIRO Commences On-Site Work at Mt Carrington
Field campaign underway under CSIRO Kick-Start grant collaboration
Legacy Minerals Holdings Limited (ASX: LGM, “LGM”, “the Company” or “Legacy Minerals”) is pleased
to advise that the CSIRO is on site at the Company’s flagship Mt Carrington Project (EL6273, EL9616,
EL9727, ALA75) progressing field activities under the collaborative research Projecti
.
Highlights
• The CSIRO team is on site at Mt Carrington undertaking a multi-week field campaign as part of the
collaborative research project supported by the CSIRO Kick-Start Programi
.
• On-site activities currently underway include structural logging of oriented drill core and the
selection and collection of drill core and RC chip samples for subsequent SEM-TIMAii
and LIBSii
analysis.
• Work is focused on the Strauss, Kylo, Guy Bell and White Rock North deposits, with additional
prospect-scale logging and sampling extending to other prospects within the Mt Carrington field.
• Deliverables will be received progressively over approximately the next nine months and are
designed to refine targeting, vectoring and extensional drilling priorities at Mt Carrington, which
hosts an existing 115Moz AgEq Mineral Resourceiii
.
Figure 1. CSIRO and Legacy Minerals personnel on site at Mt Carrington completing structural logging and sample selection
on White Rock drill core.
Management Comment CEO & Managing Director, Christopher Byrne said:
"It is excellent to have the CSIRO team on site at Mt Carrington progressing the field component of the
collaboration we announced in April. The structural logging and sample selection being completed now
sets up the SEM-TIMA, LIBS and MAIA mapper laboratory work to follow, and working alongside CSIRO
researchers gives our technical team direct access to analytical techniques that are not typically
accessible to junior explorers.
Pervious drilling and results indicate that this system has the potential for a Tier-1 gold-silver and
copper deposit, and the program is designed to improve our understanding of alteration and structural
controls on mineralisation. This will sharpen targeting confidence for the next phase of extensional and
discovery drilling at Mt Carrington, with results flowing progressively over the coming months."
ASX Announcement
20 May 2026 ASX: LGM
Page 2 of 7
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
On-Site Activities
The current on-site campaign represents the first field phase of the CSIRO collaboration announced
on 23 April 2026i
. The CSIRO team is working alongside Legacy Minerals’ technical personnel to:
• complete structural logging of oriented drill core across the priority deposits, capturing fault,
vein and fabric data to support the development of 2D and pseudo-3D structural models; and
• identify and collect representative drill core and chip samples for subsequent SEM-TIMA and
LIBS analysis at CSIRO laboratories, including selection of high-grade ore samples for MAIA
mapperii
scanning.
The activity-set, analytical workflow and program budget remain as described in the Company’s 23
April 2026 announcement, with the Kick-Start collaboration retaining a total value of $196k, inclusive
of a $50,000 matched contribution from the CSIRO Kick-Start Programi
.
Figure 2. CSIRO and Legacy Minerals personnel on site at Mt Carrington completing structural logging and sample selection.
Kylo-Straus Drill Core0F
i
Interpreted porphyry D vein lode comprising
quartz-pyrite-chalcopyrite – KYDD001 at
62.5m, 11.9% Cu, 2% Zn.
Quartz-sulphide lode in andesite porphyry -
KYDD011 at 140.5m, 99.7g/t Au, 3.17% Cu
& 231g/t Ag.
Page 3 of 7
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Red Rock1F
ii
White Rockii
Next Steps
Samples collected during the on-site campaign will be transferred to the CSIRO facilities for SEM-TIMA,
LIBS, p-XRF integration and MAIA mapper analysis. Results, structural interpretation and the 2D /
pseudo-3D alteration and structural models are expected to be delivered progressively over
approximately the next nine months. The Company will report material outcomes from the program
as they become available.
The work continues to support Legacy Minerals’ strategic focus on Mt Carrington, complementing the
recently released Mt Carrington Scoping Studyiv
by strengthening the targeting framework for the next
phase of exploration and extensional drilling.
Sulphide fill breccia - RRDD19 at 62.5m,
4.11g/t Au & 6.3g/t Ag.
Enlargement of core parallel sigmoidal vein in
showing white sphalerite – RRDD005 at
52.5m, 6.6g/t Au & 12.2g/t Ag.
Marcasite overprints red sphalerite WRDD26
at 78.3m, 632g/t Ag.
Quartz-pyrite breccia – WRDD22 at 42.2m,
529g/t Ag.
Page 4 of 7
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
About Mt Carrington
The Mt Carrington Project is a district-scale, epithermal gold-silver project located in northern New
South Wales, approximately 100km south-south-west of Brisbane, within 393km2 of granted
exploration tenements and an assessment lease application. The project is centred on the Drake
Volcanics, where much of the mineralisation occurs within a large circular caldera complex
characterised by a low magnetic signature across 150km2
.
Gold- and silver-dominant deposits at Mt Carrington are interpreted as low-to-intermediate-
sulphidation epithermal vein-style mineralisation. Mineralisation occurs as stockwork fissure veins,
vein breccias, disseminated zones, lithological controls and bedding-parallel vein structures associated
with extensive phyllic to silicic alteration. Veining is also localised along the margins of andesite to
rhyolite domes, plugs and lava flows within a sequence dominated by andesitic volcaniclastics.
Regionally, the project sits within the New England Fold Belt, with host rocks comprising a Permian
bimodal volcano-sedimentary sequence dominated by andesite and associated volcaniclastics.
Basaltic through rhyolitic facies are variably present, together with numerous contemporaneous
andesite to rhyolite sub-volcanic intrusions. Mt Carrington hosts a substantial Mineral Resource and
continues to offer both resource growth potential around known deposits and discovery upside across
the broader district.
About Legacy Minerals
Legacy Minerals Holdings Limited (ASX: LGM) is an Australian mineral exploration and development
company focused on the advancement of its Mt Carrington gold-silver project in New South Wales.
The project hosts an existing 115Moz AgEq Mineral Resource and significant exploration upside across
a broader district-scale epithermal system. Legacy Minerals’ strategy is to grow value through
disciplined technical work, targeted drilling and active portfolio management.
Page 5 of 7
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Approved by the Managing Director.
For more information:
Investors:
Chris Byrne
CEO & Managing Director
chris.byrne@legacyminerals.com.au
+61 (0) 499 527 547
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
+61 (0) 419 929 046
DISCLAIMER AND PREVIOUSLY REPORTED INFORMATION
Information in this announcement is extracted from reports lodged as market announcements referred to above and
available on the Company’s website https://legacyminerals.com.au/. The Company confirms that it is not aware of any new
information that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed.
This announcement contains certain forward-looking statements. Forward-looking statements are only predictions and are
subject to risks, uncertainties and assumptions which are outside of the control of Legacy Minerals Holdings Limited (LGM).
These risks, uncertainties and assumptions include commodity prices, currency fluctuations, economic and financial market
conditions, environmental risks and legislative, fiscal or regulatory developments, political risks, project delay, approvals and
cost estimates. Actual values, results or events may be materially different to those contained in this announcement. Given
these uncertainties, readers are cautioned not to place reliance on forward-looking statements. Any forward-looking
statements in this announcement reflect the views of LGM only at the date of this announcement. Subject to any continuing
obligations under applicable laws and ASX Listing Rules, LGM does not undertake any obligation to update or revise any
information or any of the forward-looking statements in this announcement to reflect changes in events, conditions or
circumstances on which any forward-looking statements is based.
COMPETENT PERSON’S STATEMENT
The information in this Report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is
based on information compiled by Thomas Wall, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Wall is the Technical Director and a full-time employee of Legacy Minerals Pty Limited, the Company’s
wholly-owned subsidiary, and a shareholder of the Company. Mr Wall has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Wall consents to the inclusion of the matters based on this information in the form and context in which
it appears in this announcement.
The information in this announcement that relates to the Mineral Resource Estimate and classification of the Mt Carrington
Project is based on information compiled by Kate Kitchen, who is a Member of the Australasian Institute of Mining and
Metallurgy and a Member of the Australian Institute of Geoscientists. Kate Kitchen is an independent consultant employed
full time by Mining Plus Pty Ltd. Kate Kitchen has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (‘the
JORC code’). Kate Kitchen consents to the inclusion in the report of the matters based on the information in the form and
context in which it appears.
Page 6 of 7
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Appendix A: Mt Carrington AgEq Mineral Resource (See ASX LGM Release dated 13 March 2025 for additional information)9F9F4F5F5F3F2F
iii
Prospect Classification
Resource Tonnes and Grade Contained Metal
Tonnes
(Kt)
Au (g/t) Ag (g/t) Cu% Pb% Zn%
AgEq
(g/t)
Au
(Koz)
Ag (Koz) Cu (kt) Pb (kt) Zn (kt) AgEq (Koz)
Strauss
Indicated 2,818 1.1 3.1 0.09 0.07 0.6 149 98 281 3 2 16 13,500
Inferred 2,026 1 2 0.08 0.04 0.4 130 63 129 2 1 9 8,468
Kylo
Indicated 2,842 1.1 2.1 0.07 0.05 0.4 138 103 191 2 1 11 12,609
Inferred 2,081 0.6 3.8 0.11 0.06 0.6 101 40 251 2 1 13 6,757
Guy Bell Inferred 2,512 0.7 2.3 0.16 0.08 0.6 117 58 188 4 2 15 9,449
Carrington Inferred 2,236 0.5 5.6 0.14 0.08 0.2 83 33 403 3 2 4 5,967
Red Rock Inferred 8,605 0.5 7.4 0.04 0.12 0.49 84 144 2046 3 10 43 23,239
Lady
Hampden
Indicated 2,136 0.71 62 0.01 0.03 0.07 124 49 4251 0 1 2 8,516
Inferred 2,125 0.74 35 0.01 0.04 0.08 100 51 2388 0 1 2 6,832
Silver King
Indicated 469 0.12 80 0.01 0.03 0.07 93 2 1200 0 0 0 1,402
Inferred 106 0.05 53 0.01 0.02 0.05 60 0 180 0 0 0 204
Lead
Block
Inferred 215 0.21 44 0.01 0.03 0.08 66 2 307 0 0 0 456
White
Rock
Indicated 3,135 0.05 66 0.02 0.22 0.73 104 5 6629 1 7 23 10,482
Inferred 1,051 0.08 37 0.02 0.16 0.62 72 3 1258 0 2 7 2,433
White
Rock
North
Inferred 2,039 0.05 70 0.01 0.14 0.11 83 4 4592 0 3 2 5,441
Total 34,396 104.7 653 24,294 20 33 146 115,756
The preceding statements of Mineral Resources conform to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages
reported are dry metric tonnes. Minor differences may occur due to rounding to appropriate significant figures. For White Rock & White Rock North. AgEq calculated using the formula: AgEq =
Ag + 84.0712xAu + 93.2167xCu + 36.0156xZn + 27.0117xPb and Recoveries applied are 72% (Au), 71.7% (Ag), 66% (Cu), 85% (Zn) and 85% (Pb). For Kylo, Strauss, & Red Rock AgEq calculated using
the formula: AgEq = Ag + 101.417xAu + 125.477xCu + 35.4288xZn + 28.23323xPb and Recoveries applied are 83.1% (Au), 68.6% (Ag), 85% (Cu), 80% (Zn) and 85% (Pb).For Lady Hampden, Silver
King, and Lead Block, AgEq calculated using the formula: AgEq = Ag + 82.4186xAu + 63.0108xCu + 27.0046xZn + 21.5193xPb and Recoveries applied are 88.6% (Au), 90% (Ag), 56% (Cu), 80% (Zn)
and 85% (Pb). AgEq formula calculated using silver price of $43/oz, gold price of $3600/oz, copper price of $14000/t, zinc price of $4200/t and the lead price of $3150/t (all AUD). In the opinion
of the Company, all elements included in the metal equivalent calculation have a reasonable potential to be sold and recovered based on current market conditions and metallurgical test work
up to 2017.
Page 7 of 7
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Endnotes
i
ASX Release LGM 29 October 2024 3,050gt Silver and 79gt Gold in Historical Drake Drilling, ASX Release LGM 2
May 2025 Amendments - Release 1 May 2025, Mount Carrington Mines Limited, 17 April 1970, DIGS R00018103,
Sixth Annual Report for Period Ending September 15 1992, EL2662 (Drake) CRA Exploration, Prospectus is issued
by White Rock Minerals Ltd (“White Rock”) dated 20 August 2010, ASX TMZ Release: 24 October 2022, High
Grade Copper Target at Mt Carrington
ii
LGM ASX Release, 29 October 2024, 3,050gt Silver and 79gt Gold in Historical Drake Drilling
iii
LGM ASX Release, 23 April 2026, CSIRO Grant Awarded and Collaboration with Legacy Minerals to Commence
on Mt Carrington.
ii
SEM-TIMA (Scanning Electron Microscopy – TESCAN Integrated Mineral Analyser); LIBS (Laser-Induced
Breakdown Spectroscopy); MAIA mapper (high-definition X-ray fluorescence microscopy).
iii
LGM ASX Release, 12 December 2025, New Silver Targets and Drill Approvals at Mt Carrington; ASX Release,
13 March 2025, New Drake Resource of 0.8Moz Gold-Eq and 35Moz Silver-Eq.
iv
LGM ASX Release, 4 May 2026, Study Confirms Compelling Potential of Mt Carrington Project (Scoping Study).
Share your feedback
Discover