Australian Gold Conference Presentation
Released
Released
Announcement PDF
Development + Discovery in NSW’s Premier Mineral Belts
Thomas Wall – Director and Exploration Manager
Australian Gold Conference – 14 Oct 2025
47
Ag
79
Au
29
Cu
• Unlocking the 1.2Moz AuEq
Mt Carrington Project1
• Leveraged upside from
JV-funded exploration
A dual-track pathway to near-term value-creation
ASX: LGM
This presentation may contain certain statements and projections provided by or on behalf of Legacy Minerals Holdings Limited (ASX: LGM, Legacy Minerals, or the Company) with respect to the
anticipated future undertakings. These forward-looking statements reflect various assumptions by or on behalf of Legacy Minerals. Accordingly, these statements are subject to significant business,
economic and competitive uncertainties and contingencies associated with the mining industry which may be beyond the control of Legacy Minerals which could cause actual results or trends to
differ materially, including but not limited to price and currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve estimates,
legislative, fiscal and regulatory developments, economic and financial markets conditions in various countries, approvals and cost estimates, environmental risks, ability to meet funding
requirements, share price volatility. Accordingly, there can be no assurance that such statements and projections will be realised. Legacy Minerals makes no representations as to the accuracy or
completeness of any such statement of projections or that any forecasts will be achieved.
Additionally, Legacy Minerals makes no representation or warranty, express or implied, in relation to, and no responsibility or liability (whether for negligence, under statute or otherwise) is or will be
accepted by Legacy Minerals or by any of their respective officers, directors, shareholders, partners, employees, or advisers as to or in relation to the accuracy or completeness of the information,
statements, opinions or matters (express or implied) arising out of, contained in or derived from this presentation or any omission from this presentation or of any other written or oral information or
opinions provided now or in the future to any interested party or its advisers. In furnishing this presentation, Legacy Minerals undertakes no obligation to provide any additional or updated
information whether as a result of new information, future events or results or otherwise. Nothing in this material should be construed as either an offer to sell or a solicitation of an offer to buy or
sell securities. It does not include all available information and should not be used in isolation as a basis to invest in Legacy Minerals.
This presentation contains exploration results and historic exploration results as originally reported the Company’s Prospectus dated 28 July 2021 and released 9 September and subsequent ASX
market announcements. The Company confirms that it is not aware of any new information that materially affects the information included in the original market announcements and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form
and context in which the Competent Persons’ findings are presented have not been materially modified from the original market announcements.
The information in this presentation that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Thomas Wall, a Competent
Person who is a Member of the Australian Institute of Geoscientists. Mr Wall is the Technical Director is a full-time employee of Legacy Minerals Limited and a shareholder, who has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition
of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Wall consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
The release of these presentation materials has been authorised by the Board.
Disclaimer 2
ASX: LGM
Investment Highlights 3
Mt Carrington – Core Value-Driver
• 100% owned, 1.2Moz AuEq1 Resource
(gold-dominant, silver-rich)
• Near-term development pathway
(scoping studies, permitting)
• Significant upside from deeper drilling
and untested targets within a 160km2
mineralised system
Leveraged Discovery Exposure
• Multiple discovery opportunities as the
explorer with the largest land position in
NSW
• JVs provide sustained discovery opportunity
• Balanced partnership approach minimises
dilution and financing risk while retaining
exposure to significant value-creation
Tight Structure, Key Growth Catalysts
• Low shares on issue and $7M in cash
• Recent capital raise provides strong
platform for drilling, discovery and mine
studies
• Strong upcoming news-flow
• Multiple investment catalysts
Development
Asset
Discovery
Potential
Investment
Leverage
ASX: LGM
Legacy Minerals – Location, Location, Location
Map of NSW showing Flagship Legacy Minerals projects and geographical location of major mining
and Legacy Minerals exploration projects
4
Note: references on this slide are in the Appendix – Endnotes on Slides 22
A dynamic and innovative explorer-developer, with an extensive and high-quality 9,000km2 portfolio spanning the
premier Lachlan Fold Belt and New England Fold Belt, the premier exploration and mining belts in NSW.
ASX: LGM
Corporate Overview
Options
32M ($0.21 exp Jan 26)
21M ($0.30 exp Jan 27)
Our Team
5
1 At 13 Oct 2025
Dr David Carland
Non-Executive Chairman
Douglas Menzies
Non-Executive Director
Matthew Wall
Non-Executive Chairman
Christopher Byrne
CEO and
Managing Director
Dr John Greenfield
Chief Technical Advisor
Thomas Wall
Exploration Manager
and Executive Director
Corporate Snapshot1
Shares issued
168M
Shares Price
$0.26
Market Cap
$46m
Enterprise Value
$40m
Cash2
$6m
Debt
Nil
Note: references on this slide are in the Appendix – Endnotes on Slides 22
47
Ag
79
Au
29
Cu
Mt Carrington
1.2Moz Gold Equivalent Resource
An advanced gold-silver project in the New England Fold Belt with near-
term development optionality and district-scale discovery upside.
ASX: LGM
Mt Carrington – New Vision, New Approach
Development-ready asset with district-scale discovery upside
7
• 12.82m at 48g/t Au and 2,589g/t Ag from 16m (ALA75)
• 118m at 1.71g/t Au, 6.9g/t Ag, and 1.12% Zn from 2m (ALA75)
• 18.9m at 5.8% Cu from 58m and 10.1m at 7.26% Cu from 88m (ALA75)
Note: references on this slide are in the Appendix – Endnotes on Slides 22
• Opportunity: Large, under-explored 160km2 mineralised caldera with proven
high-grade mineralisation (gold + silver + copper)
• Resource: 1.2Moz AuEq1 MRE (gold-dominant, silver-rich) underpins value
and supports development case
• Infrastructure advantage: ~$100m of sunk capital from previous miners
• Development progress: Mt Carrington Area ALA75 currently an Assessment
Lease Application – bridge between Exploration Licence and Mining Lease
• Near-term catalysts: Phase 2 Scoping Study, planned drilling at Mascotte,
Battery and regional targets.
• Long-term prize: potential Kainantu-style gold-copper system (>18Moz AuEq
analogy)2 – one of largest mineral systems in NSW with multiple targets and
potential for large deposit, with historic highlight drill intercepts including:
Multiple value-creation
opportunities through resource
growth, development and discovery.
ASX: LGM
Current 2025 1.2Moz Gold-Equivalent Resource1
One of NSW’s largest undeveloped deposits
8
34.4Mt at 1.1g/t gold-equivalent (AuEq) – 0.65Moz Au, 24.3Moz Ag, 147kt Zn, 33kt Pb, 20kt Cu
Substantial platform for growth
• New MRE provides company exceptional base to start
adding ounces through drilling and discovery
• Gold-dominant open pit resources highlight potential
for lower initial OPEX production
• Potential for low CAPEX due to site infrastructure
• High-grade underground resource potential yet to be
targeted with drilling and incorporated into resource
Mt Carrington
White Rock
Red Rock
Note: references on this slide are in the Appendix – Endnotes on Slides 22
ASX: LGM
83% of the MRE is outside of 2025 SS
2025 Phase 1 Scoping Study1 9
Significant sunk capital – infrastructure in place
• Open pits pre-stripped, haul roads completed, tailings dam built, 750ML freshwater dam,
power grid easement constructed, minor site infrastructure in place
Robust financials base case – based on just 17% of MRE
Potential Future Work
• Larger Stage 2 Scoping Study – assessing the entire Resource, not just 0.2Moz AuEq
• Ausenco engaged – metallurgical bridging study complete, progressing towards Scoping Study
Financials A$5,000
NPV8 $388M
IRR 141%
Free Cash Flow $405M
Mining Metrics
ASIC A$1,726, open-pit, 34koz Au
pa, A$47M CAPEX
17%
83%
Note: references on this slide are in the Appendix – Endnotes on Slides 22
2025
Scoping Study
ASX: LGM
New technology unpacking a large mineral system 10
RTP magnetics with drill collars (black)1
~17km
Major Deposits2
New Geophysical Data2
Note: references on this slide are in the Appendix – Endnotes on Slides 22
ASX: LGM
11
New technology unlocking new targets
Potential depth and continuity that is untested
• Detailed Airborne Mobile-MT data review has identified significant conductivity trends1
• Experts engaged who are familiar with the MT survey data used by K92 Mining Inc. at the Kainantu Mine
• Compelling discovery target opportunities confirmed both near-mine and regionally
Mobile MT Resistivity 2D Inversion Section for Line 2000 with interpretation of MT features
Note: references on this slide are in the Appendix – Endnotes on Slides 22
ASX: LGM
12
Drilling underway
New conceptual targets being tested
• Battery Prospect the first regional target to be tested in 30 years
• Potential for breccia-hosted and epithermal-porphyry related mineralisation
• Up to 4,500m of drilling approved – six initial drill holes planned
Mobile MT Resistivity 2D Inversion Section for Line 2290 and new areas of interest (yellow
marker) with interpretation of MT features1
Note: references on this slide are in the Appendix – Endnotes on Slides 22
Battery geological interpretation and schematic showing interpreted
target areas for drill testing (hatched areas) based on historic drill
logging and surface mapping (after Houston, 1992 ).
ASX: LGM
13
Mascotte drilling approved
Mascotte drilling planned
• The last drilling focused on the main Mascotte line of workings was
completed in 1969-1970
• The drilling was shallow - less than 70m deep, was never followed up and
did not assay for gold.
• Significant results included:
• 18.3m at 237g/t Ag from 3m, including:
• 9.1m at 394g/t Ag (PDMS005A)
• 9.1m @ 112g/t Ag from surface (PDMS005)
• 24.4m @ 45g/t Ag from surface including:
• 3m @ 245g/t Ag from 21.3m (PDMS001)
Note: references on this slide are in the Appendix – Endnotes on Slides 22
Mascotte prospect plan view showing recent rock chip gold assay
results, planned drilling and known historical workings.
• Rock chip samples at Mascotte confirm gold-silver with results including:
• 11.2g/t Au, 42.6g/t Ag and 1.2% Zn (11233b)
• 7.2g/t Au and 26.2g/t Ag (11227b)
• 2.1g/t Au, 222g/t Ag and 0.8% Cu (11242b)
ASX: LGM
Size of the Prize Potential: Kainantu – Exceptional AuEq Growth1
Epithermal-porphyry systems potential to extend at depth
14
2017
2025
2021
Kainantu 2.2Moz AuEq
Kainantu, 18 Moz
AuEq
2024
Kainantu acquisition
from Barrick
0.8Moz AuEq
2015
Note: references on this slide are in the Appendix – Endnotes on Slides 22
• Across the Mt Carrington Projects, there are 3,319 drill holes with an average depth ~50m
• Less than 5% of the drilling is deeper than 150m down-hole length
ASX: LGM
Large Undrilled Targets
3D modelled IP highlighting undrilled chargeability extensions1
Oblique view looking north of 3D merged model of existing IP over Mt Carrington, showing isosurfaces (Chg3D 12) and historical
drill traces. Note that WCDD003 drillhole in the western end of the survey area appears to miss the main chargeability high at the
porphyry target area.
1,500m
Note: references on this slide are in the Appendix – Endnotes on Slides 22
Porphyry Target
All Nations
Gladstone
North
Kylo
Guy Bell
Silver
King
Mt Carrington
South
WCD003
15
Joint Venture Projects
Partnerships ensure sustained discovery opportunities
The right partnerships on the right projects minimises dilution and
financing risk while retaining exposure to significant value-creation.
47
Ag
79
Au
29
Cu
ASX: LGM
The upside in a JV – non-dilutive potential for value-creation
Like 100%-owned projects, partnerships can deliver significant returns for shareholders
17
SP: $28
MC: $1.04b
SP: $0.42
MC: $3.24m
SP: $28.50
MC: $355m
SP: $0.36
MC: $3.13m
SP: $6.51
MC: $257m
SP: $0.56
MC: $5.1m
SP: £0.371
MC: £1.48b
SP: £0.018
MC: £58.6m
SP: £0.99
MC: £134m
SP: £0.014
MC: £12m
Mariana Resources
30/70 JV with Lidya
AuEx Ventures
49/51 JV with Frontier
Greatland Gold
25/75 JV with Newcrest
Abitibi Royalties
30/70 JV Osisko Mining
Aber Resources
30/70 JV with Rio Tinto
Note: references on this slide are in the Appendix – Endnotes on Slides 22
Thomson Project -
Intrusion Related Copper and Gold
Option to enter JV $25 million for 80%1
An exciting new joint venture with leading global miner Rio Tinto,
targeting major copper-gold discoveries in a new frontier location.
ASX: LGM
Thomson Project – Tier-1 Cu-Au Potential
Frontier exploration across 5,500km2
One of the most under-explored orogens in Australia
• Concept confirmed through recent drilling
• Target-rich environment
• Numerous bullseye magnetic and gravity anomalies
Big targets – Intrusion Related Cu-Au Potential
Project overview showing EL9190, EL9194, EL9278 and examples of “bullseye” magnetic targets
• Early mover advantage and big discovery exposure
• Belt scale exploration opportunity (5,500km2)
• Successful discovery opens multitude of walk-up drill
targets
19
Note: references on this slide are in the Appendix – Endnotes on Slides 22
• Leverage Rio Tinto’s global expertise in discovery,
development of IRCG systems
• Cover sequence geophysically transparent
• Shallow cover means cost-effective drilling
Pathway to Discovery
ASX: LGM
Key Investment Takeaways
Delivering growth and discovery success in Tier-1 NSW locations
20
2025 - Q4
Thomson (JV) Q4
Target Generation
Fontenoy
Drilling Underway
Harden (JV) Q4
Drilling Underway
Mt Carrington – Battery
Drilling Underway
Mt Carrington
Battery Results
• 1.2Moz AuEq1 Resource underpins company valuation
• Drilling underway at significant Au-Ag-Cu targets
• Tight capital structure and $7M in cash
• Near-term development optionality
• Portfolio of strategic joint ventures
Mt Carrington -
Emu, Mascotte, Battery
Surface Sampling
2026 – Q1
Rockley
IP survey
Mt Carrington - Mascotte
Drilling Underway
Mt Carrington
Scoping Study
• Highly leveraged to discovery success
ASX: LGM
Thomas Wall Director and Exploration Manager
thomas.wall@legacyminerals.com.au
ASX: LGM
Appendices – Endnotes
Intro Slide 1: 1 LGM ASX Release, 18 September 2025, Metallurgical Study Commences at Mt Carrington Project. Intro Slide 3: 1 LGM ASX Release, 18 September 2025, Metallurgical
Study Commences at Mt Carrington Project; 2 LGM ASX Release, 16 May 2025, $7.75M Secured in Institutional Backed Raise; LGM ASX Release, 30 September 2025, 2025 Annual
Report. Intro Slide 5: 1 LGM ASX Release, 30 September 2025, 2025 Annual Report
MTC Slide 7: 1 LGM ASX Release, 18 September 2025, Metallurgical Study Commences at Mt Carrington Project; 2 K92 Mining Inc. Growing Production & Transformative Discoveries
Site visit presentation, October 23-24, 2024; 3 ASX LGM Release 26 August 2025, Drilling Approval and New Geophysical Targets - Mt Carrington Project. MTC Slide 8: 1 LGM ASX
Release, 18 September 2025, Metallurgical Study Commences at Mt Carrington Project. MTC Slide 9: 1 ASX Release LGM, 15 April 2025, Amendment - Release 11 April 2025 ; 2 LGM
ASX Release, 18 September 2025, Metallurgical Study Commences at Mt Carrington Project. MTC Slide 10: 1, MinView | Regional NSW | Mining, Exploration and Geoscience ; 2 LGM
ASX Release, 25 August 2025, Drilling Approval and New Geophysical Targets - Mt Carrington Project. MTC Slide 11: ASX LGM Release, 25 August 2025, Drilling Approval and New
Geophysical Targets - Mt Carrington Project. MTC Slide 12: ASX LGM Release, 30 September 2025, New Silver Drill Targets Approved and Drilling Commencing. MTC Slide 13: ASX LGM
Release, 30 September 2025, New Silver Drill Targets Approved and Drilling Commencing. MTC Slide 14: 1, Otterburn Announces K92 Completes Purchase of Kainantu Mine From
Barrick Gold Corp. and Files Initial Independent Technical Report and Resource Estimate, March 11, 2015 (Otterburn Resources Corp); Growing Production & Transformative
Discoveries, Site Visit Presentation, October 23-24, 2024; K92 Mining Inc.; Independent Technical Report Mineral Resource Estimate Blue Lake Porphyry Deposit, Kainantu, Papua New
Guinea, K92 Mining Inc., 01 August 2022; 3. Independent Technical Report, Kainantu Gold Mine, Updated Integrated Development Plan, Kainantu Project, Papua New Guinea, Definitive
Feasibility Study and Preliminary Economic Analysis, National Instrument 43-101 Technical Report, January 1, 2024.
Joint Ventures Slide 17: GoldDiscovery Group, https://www.linkedin.com/posts/golddiscovery-media-b-v_why-buy-a-junior-miner-with-a-minority-stake-activity-
7173060437201129472-UGoE?utm_source=share&utm_medium=member_desktop . Thomson Slide 18: ASX Release LGM, 13 October 2025, Rio Tinto deal signed on Thomson Project
Thomson Slide 19: ASX Release LGM, 14 August 2025, Thomson Drilling Assays and Further Drilling Planned Slide 20: 1 De Grey Mining Consolidated Annual Financial Report, 2020,
Slide 21: 1 LGM ASX Release, 18 September 2025, Metallurgical Study Commences at Mt Carrington Project; 2 LGM ASX Release, 16 May 2025, $7.75M Secured in Institutional Backed
Raise; LGM ASX Release, 30 September 2025, 2025 Annual Report.
22
ASX: LGM
Appendix A: Mt Carrington Mineral Resources
Prospect Classification
Resource Tonnes and Grade Contained Metal
Tonnes (Kt) Au (g/t) Ag (g/t) Cu% Pb% Zn% AuEq (g/t) Au (Koz) Ag (Koz) Cu (kt) Pb (kt) Zn (kt)
AuEq
(Koz)
Strauss
Indicated 2,818 1.1 3.1 0.09 0.07 0.6 1.5 98 281 2.5 2.0 16 136
Inferred 2,026 1.0 2.0 0.08 0.04 0.4 1.3 63 129 1.7 0.8 9 85
Kylo
Indicated 2,842 1.1 2.1 0.07 0.05 0.4 1.4 103 191 2.0 1.4 11 128
Inferred 2,081 0.6 3.8 0.11 0.06 0.6 1.0 40 251 2.2 1.2 13 67
Guy Bell Inferred 2,512 0.7 2.3 0.16 0.08 0.6 1.2 58 188 4.0 2.1 15 97
Carrington Inferred 2,236 0.5 5.6 0.14 0.08 0.2 0.8 33 403 3.1 1.7 4 58
Lady Hampden
Indicated 2,136 0.7 61.9 0.01 0.03 0.07 1.49 49 4,251 0.2 0.7 1.6 102
Inferred 2,125 0.7 35 0.01 0.04 0.08 1.17 50 2,388 0.2 0.8 1.7 80
Silver King
Indicated 469 0.12 80 0.01 0.03 0.07 1.13 1.8 1,200 0.05 0.14 0.3 17
Inferred 106 0.05 53 0.01 0.02 0.05 0.72 0.2 0.2 0.01 0.02 0.1 2
Lead Block Inferred 215 0.21 44 0.01 0.03 0.08 0.79 1.5 307 0.02 0.07 0.2 5
Mt Carrington Group Total 19,566 1.1 15.2 0.08% 0.06% 0.37% 1.2 497.5 9589.2 15.98 10.93 71.9 777
White Rock North Inferred 2,039 0.05 70 0.01 0.14 0.11 0.99 3.5 4,592 0.3 2.8 2.3 65
White Rock
Indicated 3,135 0.05 66 0.02 0.22 0.7 1.23 5.4 6,629 0.6 7 22.8 124
Inferred 1,051 0.08 37 0.02 0.16 0.6 0.85 2.6 1,258 0.2 1.7 6.5 29
White Rock Group Total 6,225 0.1 62.4 0.02% 0.18% 0.51% 1.1 12 12,479 1 12 32 218
Red Rock Inferred 8,605 0.5 7.4 0.04 0.12 0.49 0.8 144 2046 3.2 10.3 43 232
Total Resource
Indicated 11,400 0.7 34.2 0.05% 0.10% 0.45% 1.4 257 12,552 5 11 52 507
Inferred 22,996 0.5 15.9 0.06% 0.09% 0.41% 1.0 396 11,742 15 22 95 720
Total 34,396 0.6 22.0 0.06% 0.10% 0.43% 1.1 653 24,294 20 33 147 1,227
All tonnages reported are dry metric tonnes. Minor differences may occur due to rounding to appropriate significant figures. AuEq calculated using the formula: AuEq = Au + 0.00986xAg + 1.237237xCu + 0.3493xZn + 0.2784xPb.
Formulas calculated using silver price of A$43/oz, gold price of A$3,600/oz, copper price of A$14,000/t, zinc price of A$4,200/t and lead price of A$3,150/t. In the opinion of the Company, all elements included in the metal equivalent
calculation have a reasonable potential to be sold and recovered based on current market conditions and metallurgical test work up to 2017.
23
Share your feedback
Discover