Amendment - Robust Economics Confirms Drake Project’s Potential (11/04/2025)
Legacy Minerals Holdings Limited (ASX: LGM, “LGM”, “the Company”, or “Legacy Minerals”) released
an announcement titled “Outstanding Economics Confirms Drake Project’s Potential” on 11 April 2025
(Release).
The Company has made the following amendments to the Release, to address non-compliance with
the JORC Code and Listing Rules that involved the inclusion of a stockpile.
Investors should not make any investment decisions based on the earlier Release.
The Company also amended the Cautionary Statement and removed references to historical PreFeasibility Studies on the Project. Investors should not make any investment decisions based on the
historical studies.
Page 1 heading: Stage 1 Scoping Study Results
•
To clarify the scope of the Stage 1 Scoping Study (Study), the total Mineral Resource Estimate has
been provided and the Mineral Resources evaluated in the Stage 1 Study have been clarified.
Page 1 heading: Highlights
•
The Study included a reference to a non-compliant stockpile (Stockpile). The Stockpile has been
removed from the updated 2025 Scoping Study, and all subsequent financial results have been
updated.
Page 1 heading: Key Parameters
•
Updates to financial results due to the exclusion of the Stockpile.
Page 1 heading: Significant Improvement from 2020 Pre-feasibility Study
•
Updates to the comparison figures due to the exclusion of the Stockpile.
Page 2 heading: Cautionary Statement
•
The Cautionary Statement has been amended for availability of funding and timeframe for
development.
Page 2 heading: Study Overview and Key Outcomes
•
Removal of the Stockpile from the Total Mining Inventory Results (Table 1) and update to the
financial results.
•
Replacement of Annual Cash Flows Updates 2025 – mine inventory and mining costs.
•
Removal of the reference to 2020 Pre-Feasibility Study assumptions.
Page 6 heading: Key Study Outcomes and Assumptions
•
A new sub-heading titled “Funding and Timeframe Assumptions” has been inserted to highlight
the funding and timeframe assumptions of the Study made in the Cautionary Statement.
Page 11 heading: Appendix D Scoping Study Appendix
•
Amended for removal of the Stockpile, an updated Study is attached with all figures and tables
updated.
The Company’s amended Release is attached.
Approved by the Board of Legacy Minerals Holdings Limited.
Page 1 of 8 | ABN 43 650 398 897
3/202 Russell Street Bathurst, 2795
www.legacyminerals.com.au
ASX: LGM
ASX Announcement
14 April 2025
Updated - Robust Economics Confirms Drake Project’s Potential
Results highlight compelling resource and exploration growth opportunities
Stage 1 Scoping Study Results
•
Mining Plus, a global mining services provider, was engaged to review and update the 2020 PreFeasibility Study (2020 PFS i,1) following the recently updated 2025 Mineral Resource Estimate (MRE)ii.
0F
•
Due to the outstanding results of this review and with a goal of a more extensive study, Legacy Minerals
elected to complete a Stage 1 Scoping Study (Study) as an alternative to updating the 2020 PFS.
•
A potential Stage 2 Study will assess the total 650koz Au and 24.3Moz Ag defined in the recently
updated 2025 MRE ii, which was not evaluated in the Stage 1 Scoping Study.
1F
o
•
The Stage 1 Scoping Study has only evaluated 209.5koz from the Mt Carrington Group
This Study demonstrates robust economics and provides valuable information to help drive potential
resource growth through infill, expansion, and exploration drilling.
Highlights (refer to the Cautionary Statement on page 2)
Base Case $4,250/oz Gold Price is approximately: (pre-tax)
NPV at 8%
A$290.4 million
IRR
112%
Free cash flow
A$314.1M
Total Gold Production
172,600oz Au
Mine Life of Stage 1 Study
5.5 Years
All-in-sustaining cost
A$1,726/oz
A$5,000/oz Gold Price is approximately: (pre-tax)
NPV at 8%
A$388 million
IRR
141%
Free cash flow
A$405M
Key Parameters and approximate estimates
•
Payback period of ~16 months from pre-tax cash flows.
•
Average gold production of ~31,400oz pa with 83% gold recovery.
•
Mine design is based on open-pit mining methods, with a 1MT processing plant.
•
Value of already built haul roads, water supply, and tailings dam demonstrated by ~A$47M CAPEX.
•
Planned processing of ~5.06Mt of material at an average grade of ~1.29g/t Au for ~172,600oz Au.
Significant Improvement from 2020 Pre-feasibility Study 1)
•
The NPV (Net Present Value) increased by ~120% (from $132M at A$2,300/oz in 2020i).
Next Steps and 2025 Drake Mineral Resource Estimate
•
The Company will also continue to focus on the Project's compelling exploration discovery potential
and resource growth opportunities stemming from the recently updated 2025 MREii, which included:
1) 0.8Moz Gold-Equivalent (AuEq)1 from two gold-rich deposits (23.1Mt at 1.1g/t AuEq), and
2) 35Moz Silver-Equivalent (AgEq)1 from two silver-rich deposits (11.3Mt at 99g/t AgEq).
1 See Section ‘Endnotes’ page 10; 2 See Section ‘Appendix A’ page 9 for JORC MRE details and Au/AgEq calculations.
Page 1 of 10 | ABN 43 650 398 897
3/202 Russell Street Bathurst, 2795
www.legacyminerals.com.au
ASX: LGM
Page 2 of 10
Legacy Minerals Holdings Limited (ASX: LGM, “LGM”, “the Company” or “Legacy Minerals”) is pleased to
provide an update on the Stage 1 Scoping Study at the Drake Epithermal Gold-Silver Project (“Project”) in
NSW (EL6273, EL9616, EL9727, ALA75).
Management Comment – Legacy Minerals CEO & Managing Director Christopher Byrne said:
“This is a significant outcome for shareholders and a pleasing return on our ongoing exploration efforts at
the Drake Project. This Scoping Study confirms the outstanding and compelling opportunity of the Drake
Project. With the new 2025 Mineral Resource Estimate now completed and considering the established
infrastructure at Drake, this Stage 1 Scoping Study demonstrates the clear value of the Project and its
potential upside through future resource growth and discovery.
In this Stage 1 Study, the Drake Project has the potential to deliver an average of approximately ~31,400oz
of gold per annum at an "all-in sustaining cost" ("AISC") of ~A$1,726/oz over an initial five-and-a-half-year
production period. At an assumed base case gold price of A$4,250/oz - well below current spot prices - the
Project is expected to deliver robust margins and generate strong free cashflows averaging ~A$52.8 million
pre-tax per annum during its first five years of operation and a robust NPV of ~A$290.4 million.
This base case has a significant upside, with a potential Stage 2 Study to assess the full 650koz Au and
24.3Moz Ag defined in the recently updated 2025 MRE . Impressively, the pre-tax NPV increases to ~A$388
million and the IRR to ~141% at a gold price of A$5,000/oz.
1F
The airborne mobile-magnetotelluric geophysical survey is also now complete at Drake. The results will
provide the first systematic look at the broader region in 30 years, and we’re excited by the potential insights
it will deliver both near the mine and regionally. The Company is also awaiting drilling assay results from
six holes at Mt Carrington.
With this Stage 1 Study complete and multiple exploration activities underway at the Drake and Thomson
Projects, we look forward to updating our shareholders of our progress.”
Cautionary Statement
The Scoping Study is a preliminary technical and economic assessment of the Drake Project. It considers the potential
viability of the Project based on low-level technical and economic assessments. These assessments are insufficient to
support the estimation of Ore Reserves or an investment decision. Further evaluation work and studies are required
before Legacy Minerals can provide assurance of an economic development case or certainty that the conclusions of
the study will be realised.
Mineral Resources considered in the Study include both Indicated and Inferred category resources as described under
the JORC Code (2012 Edition). Investors are cautioned that there is a low level of geological confidence in Inferred
Mineral Resources, and there is no certainty that further exploration work will result in the determination of Indicated
Mineral Resources or that the production targets themselves will be realised. This Study is based on high-level technical
and economic assessments (+/- 35% accuracy) that are not sufficient to support the estimation of Ore Reserves for the
Project for an investment decision to be made. Further exploration and evaluation work and appropriate studies are
required before Legacy Minerals will be in a position to estimate any Ore Reserves or to provide any assurance of an
economic development case.
The Scoping Study is based on the material assumptions outlined below. These include assumptions about the
availability of funding, access agreements, the timing for development, and future granting of leases required for
mining. While Legacy Minerals considers all of the material assumptions to be based on reasonable grounds, there is
no certainty that they will prove correct or that the range of outcomes indicated by the Scoping Study will be achieved.
To achieve the range of outcomes indicated in the Scoping Study, funding in the order of $46 million will likely be
required and Investors should note that there is no certainty that the Company will be able to raise that amount of
funding when needed. It is also possible that such funding may only be available on terms that may be dilutive to or
otherwise affect the value of the Company’s existing shares.
It is also possible that Legacy Minerals could pursue other ‘value realisation’ strategies such as a sale, partial sale or
joint venture of the project. If it does, this could materially reduce Legacy Mineral’ proportionate ownership of the
project.
Given the uncertainties involved, investors should not make any investment decisions based solely on the results of the
Scoping Study.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 3 of 10
The Drake Project
The Drake Project is a low-sulphidation epithermal system containing three granted exploration
licenses covering 390km2 and an Assessment Lease Application (ALA75) covering 0.46km2 over the
Mt Carrington Area. An assessment lease authority exists as a ‘bridge’ between exploration and
mining, where progression to mining status is reasonably foreseeable.
The Project encompasses substantial infrastructure on the granted exploration licenses, including a
tailings dam, grid easements, a 750ML water source, a site office, accommodation, a core shed, and
core processing facilities. This Study covers resources and infrastructure contained across ALA75 and
Exploration License EL6273.
Figure 1. Drake Project Location, NSW, Australia; key towns and infrastructure.
Study Overview and Key Outcomes
Mining Plus was requested by the Company to report the mining inventory from the 2025 Mineral
Resource Estimateii within the White Rock Minerals 2020 Pre-Feasibility (PFS)i. The 2020 PFS scope
only included a portion of the gold component of the Mt. Carrington Group Resource.
The outcome of the Study is a mining inventory, as summarised below in Table 1.
Table 1: Total Mining Inventory Estimates
Mt Carrington Group
Tonnes (Mt)
Grade (g/t Au)
Contained Gold (koz)
Indicated
3.82
1.32
162
Inferred
1.24
1.18
47
Notes: 1. All figures are rounded to reflect appropriate levels of confidence. Apparent differences may occur
due to rounding
2. Tonnage and grade include dilution and loss
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 4 of 10
Mining Plus has escalated the Project's operating and capital costs; however, since the release of the
2020 PFS, there have been no additional metallurgical, geotechnical, hydrological, or tailings
management studies. Therefore, these parameters are unchanged in this update.
The 2025 Scoping Study project life results in a pre-tax free cash flow of ~$314.1 million. The Scoping
Study has resulted in a project life to over five years, producing ~172,600 ounces of gold with an NPV
of ~A$290.4 million. This includes the total mining inventory. The key metrics for the Scoping Study
are summarised in Table 2, and the cash flows are shown in Figure 2.
Table 2: Key Scoping Study Project Metrics and Estimates
Description
Unit
Total
Mining Tonnage
Mt
19.84
Mt
5.06
g/t Au
1.29
koz Au
209.5
Mill Recovery
%
83
Gold Produced
koz Au
172.6
Mine Life
Yr
5.5
Capital Cost
A$M
46.8
Operating Cost
A$M
298
Gross Revenue
A$M
734
Pre-Tax Cash Flow
A$M
314.1
NPV8
A$M
290.4
IRR
%
112
Payback Period
months
16
Milled
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 5 of 10
Figure 2. Annual Cash Flows Updates 2025 – mine inventory and mining costs
Key Study Outcomes, Assumptions and Estimates
Table 3: Key Metrics – 2017 Pre-feasibility Studyiii, 2020 Pre-feasibility Studyi, and 2025 Scoping Study
Description
Unit
2017 PFS 2020 PFS
2025 SS
IRR
%
34
82
112
NPV8
A$M
23.9
93.6
290.4
Pre-Tax Cash Flow
A$M
37.6
126.3
314.1
Payback Period
months 22
14
16
Pre-Production CAPEX (inc. Contingency)
A$M
35.6
39
46.8
Total Tonnage Milled
Mt
3.9
4.8
5.06
Gold Produced
oz
147,300
165,700
172,600
Throughput Rate
MTPA
1.0
1.0
1.0
Initial Life of Mine
yrs
4.6
5.0
5.5
Average Annual Production Gold
oz/yr
36,000
35,500
31,400
C1 Cash Cost
A$/oz
1,078
1,056
1,329
All-In Sustaining Cost (ASIC) (OPEX +Sustaining CAPEX)
A$/oz
1,236
1,327
1,726
Australian Gold Price Assumed
A$/oz
1,700
2,300
4,250
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 6 of 10
Funding and Timeframe Assumptions
To achieve the range of outcomes indicated in the Study, funding in the order of $46 million will likely
be required. The capital expenditure is currently anticipated to be able to be funded through debt or
equity funding. The Company believes there are reasonable grounds to expect all approvals and
permits to be received within reasonable timeframes following lodgement of requisite applications.
The Company is also assessing a Stage 2 Scoping Study, which may expand the scope of the Study and
change the timeframes for development and funding required.
Comparison with the 2020 Pre-Feasibility Study Update
Table 4: Comparison of the 2020 PFS and 2025 Scoping Study Financial Model Estimates
2020 PFS Updatei
2025 Financial Model Update - SS
$2,300
A$3,000 $3,500 $4,000 $4,250 $4,500 $5,000
Key Metric at
Different Gold
Prices A$/oz
Free cash flow - Pretax
117
163
224
284
314
344
405
NPV, A$M
94
128
193
258
290
323
388
IRR, %
82%
60%
882%
102%
112%
122%
141%
Payback Period,
months
14
23
19
17
16
15
14
Upcoming Work
Airborne mobile-MT Complete
The airborne mobile magnetotellurics (MT) survey was completed after substantial delays due to wet
weather associated with tropical ex-cyclone Alfred, which impacted northern NSW. Results and
interpretations are expected within six weeks.
MT has been successfully used by companies, including K92 Mining Inc., to define targets in a gold-copper
epithermal setting interpreted to be similar to Drake. This geophysical methodology supported K92’s
Kainantu growth from 0.88Moz AuEq in 2015 iv to 18Moz AuEq in 2024 v.
3F
4F
Diamond Drill Core Assays
Six previously unsampled historical diamond drill-core holes are progressing through the laboratory, with
assays expected to be returned by the end of the month.
Potential Resource Upside Drivers
The Drake Mineral Resource Estimate has a strong potential for converting resources to higherconfidence resources with further metallurgical work and increased drill density. Potential extensions
to known mineralisation along strike and at depth also provide opportunity to grow the mineral
resource estimate. Significantly, the drilling across the Drake Project is relatively shallow and highly
concentrated around the Mt Carrington Area, leaving many areas of interest untested or poorly
tested.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 7 of 10
For more information:
Investors:
Chris Byrne
CEO & Managing Director
chris.byrne@legacyminerals.com.au
+61 (0) 499 527 547
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
+61 (0) 419 929 046
DISCLAIMER AND PREVIOUSLY REPORTED INFORMATION
Information in this announcement is extracted from reports lodged as market announcements referred to above and
available on the Company’s website https://legacyminerals.com.au/. The Company confirms that it is not aware of any new
information that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed.
This announcement contains certain forward-looking statements. Forward looking statements are only predictions and are
subject to risks, uncertainties and assumptions which are outside of the control of Legacy Minerals Holdings Limited (LGM).
These risks, uncertainties and assumptions include commodity prices, currency fluctuations, economic and financial market
conditions, environmental risks and legislative, fiscal or regulatory developments, political risks, project delay, approvals and
cost estimates. Actual values, results or events may be materially different to those contained in this announcement. Given
these uncertainties, readers are cautioned not to place reliance on forward-looking statements. Any forward-looking
statements in this announcement reflect the views of LGM only at the date of this announcement. Subject to any continuing
obligations under applicable laws and ASX Listing Rules, LGM does not undertake any obligation to update or revise any
information or any of the forward-looking statements in this announcement to reflect changes in events, conditions or
circumstances on which any forward-looking statements is based.
COMPETENT PERSON’S STATEMENT
The information in this Report that relates to Exploration Targets and Exploration Results is based on information compiled
by Thomas Wall, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Wall is the Technical
Director and a full-time employee of Legacy Minerals Pty Limited, the Company’s wholly-owned subsidiary, and a shareholder
of the Company. Mr Wall has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Wall consents to the
inclusion of the matters based on this information in the form and context in which it appears in this announcement.
The information in this announcement that relates to production targets, assumptions on Modifying Factors and evaluation
of other relevant factors is based on, and fairly represents information and supporting documentation that has been
compiled under the supervision of Mr David Billington (Mining), a Competent Person who is a Member of the Australasian
Institute of Mining and Metallurgy (AusIMM). Mr Billington is an employee and security holder of Mining Plus Pty Ltd. Mr.
Billington has reviewed and approved the technical content of this announcement. Mr Billington has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources
and Ore Reserves’ (the JORC Code). Mr Billington consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this announcement that relates to the Mineral Resource Estimate and classification of the Drake Project
is based on information compiled by Kate Kitchen, who is a Member of the Australasian Institute of Mining and Metallurgy
and a Member of the Australian Institute of Geoscientists. Kate Kitchen is an independent consultant employed full time by
Mining Plus Pty Ltd. Kate Kitchen has sufficient experience that is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (‘the JORC code’).
Kate Kitchen consents to the inclusion in the report of the matters based on the information in the form and context in which
it appears.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 8 of 10
About Legacy Minerals
Legacy Minerals is an ASX-listed public company exploring gold, copper, and base-metal projects in NSW since
2017. The Company has nine projects that present significant discovery opportunities for shareholders.
0B0B0BAu-Ag Black Range (EL9464, EL9589)
1B1B1BCu-Au Drake (EL6273, EL9616, EL9727, ALA75)
Extensive low-sulphidation, epithermal system with
limited historical exploration. Epithermal occurrences
across 30km of strike.
Large caldera (~150km2) with similar geological
characteristics to other major pacific rim low-sulphidation
deposits.
2B2BCu-Au Rockley (EL8926)
3B3B3B Au-Cu (Pb-Zn) Cobar (EL9511) Helix JV
Prospective for porphyry Cu-Au and situated in the
Macquarie Arc Ordovician host rocks with historic highgrade copper mines that graded up to 23% Cu.
Undrilled targets next door to the Peak Gold Mines.
Several priority geophysical anomalies and gold in lag up
to 1.55g/t Au.
Au-Ag Bauloora (EL8994, EL9464) Newmont JV
One of NSW’s largest low-sulphidation, epithermal
systems with a 27km2 epithermal vein field.
6B Au Harden (EL9657)
Extensive historical high-grade quartz-vein gold
mineralisation. Drilling includes 3.6m at 21.7g/t Au 116m
and 2m at 17.17g/t Au from 111m.
Au-Cu Fontenoy (EL8995) Earth AI JV
Cu-Au Glenlogan (EL9614) S2 Resources JV
Large, undrilled magnetic anomaly underneath Silurian
cover located 55kms from Cadia Valley.
Significant PGE, Au and Cu anomalism defined in soil
sampling and drilling. Significant drill intercepts include
120m @ 0.3g/t PGE from 298, and 79m at 0.27% Cu from
1.5m.
4B4B4CCCu-Au Thomson (EL9190, EL9194, EL9728)
Prospective for intrusion-related gold and copper systems the project contains numerous ‘bullseye’ magnetic and
gravity anomalies that remain untested.
Figure 3. Location of Legacy Minerals’ Projects in NSW, Australia, and major mines and deposits
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 9 of 10
Appendix A: Resources
Table 5: Mineral Resource Estimates for the Gold-Rich Resources at the Drake Project1)
Indicated
Resource
Estimates
Inferred
Total Resource
Tonnes
(Mt)
Grade
AuEq
(g/t)
Metal
AuEq
(koz)
Tonnes
(Mt)
Grade
AuEq
(g/t)
Metal
AuEq
(koz)
Tonnes
(Mt)
Grade
AuEq
(g/t)
Metal
AuEq
(koz)
Red Rock
-
-
-
8.6
0.8
232
8.6
0.8
232
Mt Carrington
Group – Gold
Rich
Resources
5.7
1.4
257
8.9
1.1
315
14.5
1.2
560
Total
5.7
1.4
257
17.5
1.0
547
23.1
1.1
792
Table 6: Mineral Resource Estimates for the Silver-Rich Resources at the Drake Project
Indicated
Resource
Estimates
Inferred
Total Resource
Tonnes
(Mt)
Grade
AgEq
(g/t)
Metal
AgEq
(Moz)
Tonnes
(Mt)
Grade
AgEq
(g/t)
Metal
AgEq
(Moz)
Tonnes
(Mt)
Grade
AgEq
(g/t)
Metal
AgEq
(Moz)
White Rock
Group
3.1
104
10
3.1
79
8
6.2
92
18
Mt Carrington
Group – Silver
Rich
Resources
2.6
118
10
2.5
95
8
5.1
106
17
Total
5.7
111
20
5.6
86
16
11.3
99
35
Table 5 and Table 6 Notes:
1. The preceding statements of Mineral Resources conform to the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages
reported are dry metric tonnes. Minor discrepancies may occur due to rounding to appropriate
significant figures reflecting the confidence level in the Mineral Resources.
2. All Mineral Resources are constrained within optimised pit shells determined using a gold price of
A$3,600/oz and a silver price of A$43/oz (as well as a Cu price of A$14,000/t; Zn price of A$4,200/t
and a Pb price of A$3,150/t).
3. The Mineral Resources for gold-rich deposits at Red Rock, Strauss, Kylo, Guy Bell and Carrington are
reported at a 0.35g/t AuEq cutoff. The Mineral Resources for silver-rich deposits at Silver King, Lady
Hampden, Lead Block, White Rock and White Rock North are reported at a 35g/t AgEq cut-off.
4. Estimates are rounded to reflect the level of confidence in the Mineral Resources at the time of
reporting.
5. Refer to the following sections of this release and Appendix B, ‘JORC Table 1’, for further details on
the Mineral Resource Estimate. Please refer to the compliance statements for details on parameters
used to calculate metal equivalents.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 10 of 10
Metal Equivalent Calculations
For Red Rock and Mt Carrington, AuEq is calculated using the formula: AuEq = Au + 0.00986xAg +
1.237237xCu + 0.3493xZn + 0.2784xPb. Recoveries applied are 83.1% (Au), 68.6% (Ag), 85% (Cu), 80%
(Zn) and 85% (Pb). For White Rock, AgEq is calculated using the formula: AgEq = Ag + 84.0712xAu +
93.2167xCu + 36.0156xZn + 27.0117xPb. Recoveries applied are 72% (Au), $71.7% (Ag), 66% (Cu), 85%
(Zn) and 85% (Pb). Mt Carrington Silver Deposit Ag + 82.4186xAu + 63.0108xCu + 27.0046xZn +
21.5193xPb, Recoveries applied are 83.1% (Au), 68.6% (Ag), 85% (Cu), 80% (Zn) and 85% (Pb).
Formulas calculated using silver price of A$43/oz, gold price of A$3,600/oz, copper price of
A$14,000/t, zinc price of A$4,200/t and lead price of A$3,150/t. In the opinion of the Company, all
elements included in the metal equivalent calculation have a reasonable potential to be sold and
recovered based on current market conditions and metallurgical test work up to 2017.
Appendix B JORC Table
The Mineral Resource Estimate used in this Scoping Study was previously reported in accordance with
the JORC Code (2012 Edition) in the Company’s ASX Release titled "New Drake Resource of 0.8Moz
Gold-Eq and 35Moz Silver-Eq" dated 13 March 2025.
The information in that release included the relevant JORC Table 1 (Sections 1–3), and there have been
no material changes to the Mineral Resource or the assumptions underpinning it since that time. As
such, the JORC Table 1 has not been reissued in this document.
Appendix C Endnotes
i
ASX Release WRM, 19 August 2020, Exceptional Updated Gold Pre-Feasibility Study Results
ii ASX Release LGM, 13 March 2025, New Drake Resource of 0.8Moz Gold-Eq and 35Moz Silver-Eq
iii ASX Release WRM, 27 December 2017, Mt Carrington Gold-Silver Project Pre-Feasibility Study Confirms a Financially Robust
Gold First Stage
iv Otterburn Announces K92 Completes Purchase of Kainantu Mine from Barrick Gold Corp. and Files Initial Independent
Technical Report and Resource Estimate, March 11, 2015 (Otterburn Resources Corp)
Category
Tonnage
Grade (AuEq)
Inferred
1,840,000
11.6
Indicated
240,000
13.3
v
Growing Production & Transformative Discoveries, Site Visit Presentation, October 23-24, 2024, K92 Mining Inc.;
Independent Technical Report Mineral Resource Estimate Blue Lake Porphyry Deposit, Kainantu, Papua New Guinea, K92
Mining Inc., 01 August 2022; Independent Technical Report, Kainantu Gold Mine, Updated Integrated Development Plan,
Kainantu Project, Papua New Guinea, Definitive Feasibility Study and Preliminary Economic Analysis, National Instrument 43101 Technical Report, January 1, 2024
Category
Tonnage
Grade (AuEq)
Inferred (Kora/Judd)
16,500,000
8.48
Indicated (Kora/Judd)
4,000,000
9.05
Measured (Kora/Judd)
4,100,000
10.92
Inferred (Blue Lake)
549,000,000
0.61
Appendix D Scoping Study
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Legacy Minerals Mt Carrington
Mining Only Scoping Study
LEGACY MINERALS MT
CARRINGTON MINING ONLY
SCOPING STUDY
PROJECT COMPLETION DATE: April 2025
LEGACY MINERALS
Document Control Information
Legacy Minerals Mt Carrington
Mining Only Scoping Study
MP 13771- LGM-MtCarrington-Scoping
Study
REVISION
No.
DATE
3
14/04/2025
Revision Tracking
Revision
Prepared By
Reviewed By
Issued For
Approved By
Date
1
D Billington
P Lock
FV
P Lock
10/4/2025
2
D Billington
P Lock
FV
P Lock
11/4/2025
3
D Billington
P Lock
FV
P Lock
14/4/2025
Issued For: Review and Comment (RC), Information Only (IO), Implementation (IM), Final Version (FV).
Quality Control
Signature
Principal Author
D BILLINGTON
Date
Principal Peer
and Report
Reviewer
P LOCK
14/4/2025
Signature
Date
14/4/2025
Reviewers
IMPORTANT INFORMATION:
THIS DOCUMENT HAS BEEN PREPARED FOR THE EXCLUSIVE USE OF THE CUSTOMER ON THE BASIS OF INSTRUCTIONS, INFORMATION
AND DATA SUPPLIED BY THEM AND REGARDS THIS AS COMPLETE AND ACCURATE. THIS DOCUMENT AND ITS CONTENTS ARE
CONFIDENTIAL AND MAY NOT BE DISCLOSED, COPIED, QUOTED OR PUBLISHED UNLESS MINING PLUS PTY LTD (MP) HAS GIVEN ITS PRIOR
WRITTEN CONSENT. MINING PLUS ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING AS A RESULT OF ANY PERSON OTHER
THAN THE NAMED CUSTOMER ACTING IN RELIANCE ON ANY INFORMATION, OPINION OR ADVICE CONTAINED IN THIS DOCUMENT. THIS
DOCUMENT MAY NOT BE RELIED UPON BY ANY PERSON OTHER THAN THE CLIENT, ITS OFFICERS AND EMPLOYEES. MINING PLUS
ACCEPTS NO LIABILITY FOR ANY MATTERS ARISING IF ANY RECOMMENDATIONS CONTAINED IN THIS DOCUMENT ARE NOT CARRIED
OUT, OR ARE PARTIALLY CARRIED OUT, WITHOUT FURTHER ADVICE BEING OBTAINED FROM MINING PLUS UNLESS EXPLICITLY STATED