Presentation RIU Sydney
Released
Released
Announcement PDF
ASX : LGM
7 May 2026 RIU Sydney
Kylo Mine, Mt Carrington
Mt Carrington Gold & Silver Project
High-margin, long-life, low-cost development asset
ASX: LGM
Important Information
The May 2026 Mt Carrington Scoping Study has been prepared to ascertain whether a business case can be made before
proceeding with more definitive studies of Mt Carrington’s development viability. The Scoping Study is a preliminary
technical and economic assessment of the potential viability of mineral extraction at Mt Carrington.
The Scoping Study is based on low-level technical and economic assessments that are not yet sufficient to support the
estimation of Ore Reserves. Further exploration and evaluation work, and appropriate studies, are required before any
estimate of Ore Reserves can be made, or before any assurance of an economic development case. The Scoping Study is
based on the material assumptions outlined in this announcement. These include assumptions about the availability of
funding. While the Company considers all of the material assumptions to be based on reasonable grounds, there is no
certainty that they will prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved.
The Company has reasonable grounds to disclose a Production Target, given that project viability is determined based on
100% of Indicated Resources, which deliver payback within 42 months from first production at the Base Case. Within the first
11 years of production, approximately 71% of the Production Target is in the Indicated Mineral Resource category, and 29% is
in the Inferred Mineral Resource category. For the Life of Mine, approximately 46% of the Life of Mine Production Target is in
the Indicated Mineral Resource category, and 54% is in the Inferred Mineral Resource category. Legacy Minerals considers
that Mt Carrington’s financial viability does not depend on the inclusion of Inferred Resources, and therefore, a reasonable
basis exists for disclosing a production target including Inferred Resources. There is a lower level of geological confidence
associated with Inferred Mineral Resources, and there is no certainty that further exploration work will result in the
determination of Indicated Mineral Resources, or that the Production Target itself will be realised.
Investors are cautioned that the Scoping Study is at a scoping-level of confidence (-30% to +45% accuracy). Further study
work is required to develop all project-modifying factors, including but not limited to mining dilution, ore loss, metallurgical
recoveries, geotechnical parameters, hydrology and dewatering, closure, cost estimates, and environmental and social
impacts. The Scoping Study is based on the material assumptions outlined in this announcement, including assumptions
about the availability of funding. While Legacy Minerals considers all material assumptions to be based on reasonable
grounds, there is no certainty that they will prove to be correct or that the range of outcomes indicated by the Scoping Study
will be achieved. To achieve the range of outcomes indicated in the Scoping Study, funding in the order of approximately
A$220.5M (maximum expected cash drawdown, including working capital and contingency) will likely be required.
The Scoping Study is based on the material assumptions outlined in this announcement. These include assumptions about
the availability of funding. Legacy Minerals has a strong track record of raising funding as required on attractive terms, and a
significant combined professional track record in the and development of resources projects. However, while Legacy
Minerals considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will
prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved.
To achieve the range of outcomes indicated in the Scoping Study, funding in the order of ~A$220.5 million will likely be
required (inclusive of all capital, owners, and other costs associated with an Engineering, Procurement and Construction
(EPC) contract, and all factored contingencies). This funding may take the form of debt and/or equity. Investors should note
that there is no certainty that Legacy Minerals will be able to raise that amount of funding when needed. It is also possible
that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Legacy Mineral’s
existing shares. It is also possible that Legacy Minerals could pursue other ‘value realisation’ strategies such as a sale, partial
sale or joint venture of Mt Carrington. If it does, this could materially reduce Legacy Mineral’s proportionate ownership of
the project. Given the uncertainties involved, investors should not make any investment decisions based solely on the results
of the Scoping Study.
This announcement has been prepared in compliance with the JORC Code 2012 Edition and the ASX Listing Rules. All material
assumptions on which the forecast financial information is based have been included in this announcement.
Competent Person Statement
This presentation contains exploration results and historic exploration results as originally reported the Company’s
Prospectus dated 28 July 2021 and released 9 September 2021 and subsequent ASX market announcements. The
Company confirms that it is not aware of any new information that materially affects the information included in the
original market announcements and that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcements continue to apply and have not materially changed. The Company
confirms that the form and context in which the Competent Persons’ findings are presented have not been materially
modified from the original market announcements.
The information in this presentation that relates to Exploration Targets, Exploration Results is based on information
compiled by Thomas Wall, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Wall
is the Technical Director is a full-time employee of Legacy Minerals Limited and a shareholder, who has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Wall consents to the inclusion in the report
of the matters based on his information in the form and context in which it appears.
The information in this announcement that relates to the Mineral Resource Estimate and classification of the Drake
Project is based on information compiled by Kate Kitchen, who is a Member of the Australasian Institute of Mining and
Metallurgy and a Member of the Australian Institute of Geoscientists. Kate Kitchen is an independent consultant
employed full time by Mining Plus Pty Ltd. Kate Kitchen has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a
Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (‘the JORC code’). Kate Kitchen consents to the inclusion in the report of the
matters based on the information in the form and context in which it appears.
References
Please refer to appendices for details of all references contained throughout this presentation.
The release of these presentation materials has been authorised by the Board.
ASX: LGM
Company Overview1
1 At 05 May 2026
($AUD)
Market Cap
Shares on issue 200 million
$30 million
Debt Nil
Cash $8.4 million
Enterprise Value $21 million
Options on issue Nil Listed
Current share price $0.15
Strong register and good daily liquidity
Steady consolidation by institutions and HNW investors
Low-dilution track record and commitment
Disciplined capital allocation and active portfolio management
Management strongly aligned with shareholders
Board and Management invested
Tight capital structure and well funded
Leveraged to news flow and gold-silver price
3
Board Management Team
Dr David Carland
Non-Executive
Chairman
Douglas Menzies
Non-Executive
Director
Matthew Wall
Non-Executive
Director
Christopher Byrne
CEO and Managing
Director
Thomas Wall
Exploration Manager
and Executive Director
Dr John Greenfield
Chief Technical Advisor
Advisor
ASX: LGM
Scoping Study Outcomes
4
Scoping Study confirms high quality, high margin development opportunity
Base Case (Au A$5,950/oz, Ag A$85/oz) Spot Case (Au A$6,500/oz, Ag A$105/oz)
A$1,247m A$542m 32%
LOM free cash flow NPV7 (pre-tax) IRR (pre-tax)
54% Margin A$220.5m A$1,545
Margin Capex AISC
36 months
2.5x
19 years
Payback
NPV7 (pre-tax) to
funding Initial mine life
373koz Gold plus 9,911koz Silver
LOM production
A$1,597m A$716m 38%
LOM free cash flow NPV7 (pre-tax) IRR (pre-tax)
59% Margin A$220.5m A$1,061
Margin Capex AISC
32 months
3.2x
19 years
Payback
NPV7 (pre-tax) to
funding Initial mine life
LOM production
Source: ASX release LGM 4 May 2026 - Mt Carrington Scoping Study. Spot Case: Au A$6,500/oz, Ag A$105/oz; Base Case: Au A$5,950/oz, Ag A$85/oz. Pre-tax, ungeared, real 2026 AUD. Production Target reported in accordance with the JORC Code 2012; Scoping
Study at -30% / +45% accuracy. Refer to Cautionary Statement.
373koz Gold plus 9,911koz Silver
ASX: LGM
Development
Overview
47
Ag
79
Au
ASX: LGM
Mt Carrington Project Overview
Scoping Study confirms high quality, large, high margin operation
6
Quality Au-Ag deposit drives strong economics
Large, shallow, high-margin gold & silver development
Low strip ratio and low AISC
Low complexity with straightforward processing pathway
Concentrate product highly saleable
Strong payabilities for product and increases operational resilience with
stockpiles
Conservative base case with significant upside
Optimisations of the plant, inclusion of base metal concentrates and revise
pricing assumptions across resource estimates, mining and financial studies
Drilling and discovery focus
Discovery-focused drilling seeking extensions to existing MRE and new deposits
Hillgrove
(ASX: LRV)
Cracow
(ASX: AIS)
Mt Carrington
(ASX: LGM)
Mt Rawdon
(ASX: EVN)
ASX: LGM
Strong Project Economics
19 years - A$716M NPV - A$,1061/oz AISC - 3.2× NPV-to-CAPEX
7
Source: ASX release LGM 4 May 2026 - Mt Carrington Scoping Study. Spot Case: Au A$6,500/oz, Ag A$105/oz; Base Case: Au A$5,950/oz, Ag A$85/oz. Pre-tax, ungeared, real 2026 AUD. Production Target reported in accordance with the JORC Code 2012; Scoping
Study at -30% / +45% accuracy. Refer to Cautionary Statement.
A$716M
NPV₇ (pre-tax)
38%
IRR (pre-tax)
32 mo
Payback
A$1,061/oz Au
AISC
A$1,597M
LOM cash flow
PRODUCTION & MINING
Mine life (from first ore) Years 19
Plant feed throughput Mtpa 1.0
Total material mined Mt 69.2
Ore mined (plant feed) Mt 17.04
Strip ratio (waste : plant feed) t : t 3.06
GRADES & RECOVERY
Gold head grade g/t Au 0.87
Silver head grade g/t Ag 21.45
Gold recovery (LOM avg.) % 78%
Silver recovery (LOM avg.) % 84%
PAYABLE METAL & CONCENTRATE
Total Au in concentrate koz 373
Total Ag in concentrate koz 9,911
Avg. annual Au production koz pa 21.4 (avg) | 32 (peak)
Avg. annual Ag production koz pa 569 (avg) | 845 (peak)
Concentrate produced (LOM) kt ≈ 443
CAPITAL & OPERATING COST
Capital cost (initial) A$M 220.5
Capital cost (sustaining, LOM) A$M 6.7
Mining op. cost (LOM avg.) A$/t mined 7.13
Processing op. cost (LOM avg.) A$/t proc. 29.95
G&A op. cost (LOM avg.) A$/t proc. 8.17
Total unit operating cost A$/t proc. 65.72
KEY OUTCOMES — SPOT CASE
3.2× NPV-to-CAPEX
CAPEX – NPV Ratio
ASX: LGM
Shallow low-cost operation within existing infrastructure
Scoping Study confirms high quality, high margin operation
8
• Shallow epithermal Au-Ag mineralisation enables low-
cost open pit mining with max depth of ~150m.
• Staged mining allows for low strip ratio and high-
grades for early return on investment
• Mineralisation starts at surface (0m)
• ASIC of A$1,061
Scoping Study 2026 Pit design for the Strauss pit Stages 1 and 2
• 11kV grid power, established access roads, cleared mine
area, water infrastructure and tailings storage facility -
greatly de-risking potential development timelines.
Existing Infrastructure
• A$220.5M initial capital expenditure, including A$61M
contingency and Engineering, Procurement,
Construction, and Management cost and contingency
(~28% of direct cost)
• Grid connection materially reduces reliance on diesel
fuel and lowers operational costs.
Low Initial Capital Expenditure
Source: ASX release LGM 4 May 2026 - Mt Carrington Scoping Study. Spot Case: Au A$6,500/oz, Ag A$105/oz; Base Case: Au A$5,950/oz, Ag A$85/oz. Pre-tax, ungeared, real 2026 AUD. Production Target reported in accordance with the JORC Code 2012; Scoping
Study at -30% / +45% accuracy. Refer to Cautionary Statement.
ASX: LGM
Simple, proven, low-cost flowsheet
Conventional, cyanide-free flotation flowsheet producing a single saleable Au-Ag concentrate, with offtake optionality.
9
Mt Carrington Mill Design
Oblique view looking north-east
ROM pad
Ball Mill
Sag Mill
Floatation cells
Tailings Dam
(existing)
Concentrate Storage
Scoping Study 2026 processing plant
ASX: LGM
47
Ag
79
Au
Discovery &
Growth
Opportunity
ASX: LGM
New Discovery and Growth Opportunities
High Grade Gold, Silver and Copper
Interpreted porphyry
D-veins in KYDD001 at
52.5m (18.9m at 5.8%
Cu from 58m)1
(Comments on
Exploration at the
Drake Project, Corbett
Geological Consulting)
• 12.82m at 48g/t Au and 2,589g/t Ag from 12m1
• including 1m up to 230g/t Au and 9,081g/t Ag
• 118m at 1.71g/t Au, 6.9g/t Ag, 0.1%Cu and 1.12% Zn from 2m1
• 143m at 1.1g/t Au, 3g/t Ag, and 0.9% Pb+Zn from 0m2
• 8m at 16.92g/t Au, 17g/t Ag, 0.53% Cu, 1.45% Pb and 6.89% Zn from 52m3
Overprinting Porphyry D-vein
Example of
epithermal
vein textures
from drill
holes
KYDD003
(118m at
1.71g/t Au
from 2m)1
11
• 18.9m at 5.8% Cu from 58m and 10.1m at 7.26% Cu from 88m1
Gold and Silver Drill Hits
Copper Drill Hits
Note: references on this slide are in the Appendix – Endnotes on Slides 21
Epithermal Veins
ASX: LGM
Near Mine Expansion Areas
Increase Project scale with near mine Mineral Resource growth
12
Substantial platform for growth
• Initial gold-dominant open pit resources
• Underground resource potential yet to be targeted and
incorporated into resource or mine plans
• Drill results highlighting base metal concentrate
opportunity
• Project resource has consistently grown with additional
drilling and new discoveries
• Pit optimisation shows opportunity to expand into
areas of limited drilling
Consistent Mineral Resource Growth
Note: references on this slide are in the Appendix – Endnotes on Slides 21, Refer to Slide 22 for Mineral Resources
• Mozart - 26.5m at 220g/t Ag and 0.1g/t Au from 133.3m
• Mascotte - 40m at 1.0g/t Au from 151m
• Kylo West - 18.9m @ 5.8% Cu
Drill Hits Outside of Resources
Scoping Study 2026 Pit design for the Strauss pit Stages 1 and 2 showing
indicated and inferred
Opportunity to expand pit areas with further drilling where
optimised shells fall short of mineralisation extent
• 34.4Mt at 105g/t silver-equivalent (AuEq) containing
0.7Moz Au, 24.3Moz Ag, 147kt Zn, 33kt Pb, 20kt Cu
2025 Mineral Resource1
ASX: LGM
Resources Open at Depth – White Rock and Strauss
Opportunity to grow the Mineral Resource Estimate
13
Note: references on this slide are in the Appendix – Endnotes on Slides 21, Refer to Slide 22 for Mineral Resources
ASX: LGM
Current Drilling - Mascotte
Implementing new technology to make discoveries
14
MT Resistivity across the Mt Carrington Deposits and White Rock Alteration Halo1
Note: references on this slide are in the Appendix – Endnotes on Slides 21
Cross-section of the Mascotte Mine1,2
The first hole has returned an outstanding, first pass intercept of1:
40m at 1.0g/t Au from 151m, including:
o 9m at 2.7g/t Au from 180m, incl. 1m at 5.6g/t Au from 157m
New Discovery – Mascotte
• Detailed Airborne Mobile-MT data review has identified significant
conductivity trends1
• Compelling discovery target opportunities confirmed both near-mine and
regionally
NEW DISCOVERY
New Technologies – AI integration and Mobile MT
ASX: LGM
Next Steps - Discovery
Regional and Near Mine Targeting
Planned drill programs across Mt Carrington
2025
Interpreted deep-set conductive feeder
structures and lineaments
New Geophysical Work Highlighting New Targets Multiple targets being tested in 2025
15
ASX: LGM
Looking ahead
47
Ag
79
Au
ASX: LGM
News flow next 12 months
17
Active programs of exploration and study work
Discovery Development
Optimisation studies (plant size, payability)
Environmental and other baselines studies
Mineral Resource Estimate Review
Commutation and further metallurgical test-work
Concentrate offtake discussions with refiners
Environmental and other baselines studies
Mascotte diamond drilling – follow-up to MSDD001 (40m @ 1.0 g/t
Au)
Battery Creek prospect – maiden drilling program
White Rock North silver target – step-out drilling (5.4Moz AgEq)
Mt Carrington regional Mobile-MT survey integration with
AI/CSIRO
Drake porphyry-Cu D-vein follow-up (KYDD001 18.9m @ 5.8% Cu)
Targeting program for mineral resource extensions (10,000m of
drilling planned)
Source: ASX release LGM 4 May 2026 - Mt Carrington Scoping Study. Spot Case: Au A$6,500/oz, Ag A$105/oz; Base Case: Au A$5,950/oz, Ag A$85/oz. Pre-tax, ungeared, real 2026 AUD. Production Target reported in accordance with the JORC Code 2012; Scoping
Study at -30% / +45% accuracy. Refer to Cautionary Statement.
Note: references on this slide are in the Appendix – Endnotes on Slides 21
ASX: LGM
Investment Highlights
19-year, global first-quartile-AISC, brownfield development asset
Quality Au-Ag deposit drives strong economics
Large, shallow, high-margin gold & silver development
A High-Margin, Long Life, Low Cost
Gold and Silver Development Opportunity
Simple operation in a stable jurisdiction
Low complexity with straightforward processing pathway
Team of proven developers
Track record of financing and permitting major mining operations
District-scale growth potential
Active drilling resulting in new discoveries (E.g. Mascotte)
• MSDD001: 40m at 1.0 g/t Au from 150m
Accelerating value in all areas
Artificial intelligence driving targeting and efficiency improvements
• CSIRO collaboration project underway
18
Mt Carrington
ASX: LGM
Chris Byrne CEO & Managing Director
chris.byrne@legacyminerals.com.au
+61 499 527 547
Thank You
ASX: LGM
Appendix A – Endnotes
Intro Slide 4: 1 LSX ASX Release, 9 February 2026, Lion Investor Update February 2026
MTC Slide 5: 1 LGM ASX Release, 4 May 2026, Study Confirms Compelling Potential of Mt Carrington Project
MTC Slide 6: 1 LGM ASX Release, 12 December 2025, New Silver Targets and Drill Approvals at Mt Carrington
MTC Slide 7: 1 LGM ASX Release, 1 September 2025, Metallurgical Study Commences at Mt Carrington Project 2 Independent Technical Report, Kainantu Gold Mine, Updated Integrated
Development Plan, Kainantu Project, Papua New Guinea, Definitive Feasibility Study and Preliminary Economic Analysis, National Instrument 43-101 Technical Report, January 1, ASX Release LGM
29 October 2024 3,050gt Silver and 79gt Gold in Historical Drake Drilling
MTC Slide 8: 1 LGM ASX Release, 4 May 2026, Study Confirms Compelling Potential of Mt Carrington Project
MTC Slide 9: 1 LGM ASX Release, 4 May 2026, Study Confirms Compelling Potential of Mt Carrington Project, 2 LGM ASX Release, 13 March 2025, New Drake Resource of 0.8Moz Gold-Eq and
35Moz Silver-Eq
MTC Slide 10: 1 ASX Release LGM 29 October 2024 3,050gt Silver and 79gt Gold in Historical Drake Drilling, ASX Release LGM 2 May 2025 Amendments - Release 1 May 2025, Mount Carrington
Mines Limited, 17 April 1970, DIGS R00018103, Sixth Annual Report for Period Ending September 15 1992, EL2662 (Drake) CRA Exploration, Prospectus is issued by White Rock Minerals Ltd (“White
Rock”) dated 20 August 2010, ASX TMZ Release: 24 October 2022, High Grade Copper Target at Mt Carrington; 2 ASX Release LGM, 2 May 2025, Amendments - Release 1 May 2025; ASX Release
LGM, 1 May 2025, Broad and High-Grade Gold 1in Drilling Intercepts; 3 ASX Release LGM, 28 March 2024, Clarification of Mt Carrington Acquisition Announcement
MTC Slide 11: ASX Release LGM, 25 August 2025, Drilling Approval and New Targets at Mt Carrington Project
MTC Slide 12: 1 Otterburn Announces K92 Completes Purchase of Kainantu Mine From Barrick Gold Corp. and Files Initial Independent Technical Report and Resource Estimate, March 11, 2015
(Otterburn Resources Corp); Growing Production & Transformative Discoveries, Site Visit Presentation, October 23-24, 2024; K92 Mining Inc.; Independent Technical Report Mineral Resource
Estimate Blue Lake Porphyry Deposit, Kainantu, Papua New Guinea, K92 Mining Inc., 01 August 2022; 3. Independent Technical Report, Kainantu Gold Mine, Updated Integrated Development Plan,
Kainantu Project, Papua New Guinea, Definitive Feasibility Study and Preliminary Economic Analysis, National Instrument 43-101 Technical Report, January 1, 2024.
MTC Slide 13: 1 ASX Release LGM, ASX Release LGM, 19 March 2026, Maiden Drilling Makes New Greenfields Gold Discovery, 2 ASX Release LGM, 30 September 2025, New Silver Drill Targets
Approved and Drilling Commencing
MTC Slide 14: ASX Release LGM, 30 September 2025, New Silver Drill Targets Approved and Drilling Commencing; 2 ASX Release LGM, 11 December 2025, New Silver Targets and Drill Approvals at
Mt Carrington
MTC Slide 15: 1 LGM ASX Release, 4 May 2026, Study Confirms Compelling Potential of Mt Carrington Project, 2 LGM ASX Release, 12 December 2025, New Silver Targets and Drill Approvals at Mt
Carrington
MTC Slide 16: 1 LGM ASX Release, 4 May 2026, Study Confirms Compelling Potential of Mt Carrington Project; 2 LGM ASX Release, 30 April 2026, March Quarterly; 3 LGM ASX Release, 12 December
2025, New Silver Targets and Drill Approvals at Mt Carrington
Appendix B: 1 LGM ASX Release, 12 December 2025, New Silver Targets and Drill Approvals at Mt Carrington 20
ASX: LGM
Appendix B – Mt Carrington Mineral Resources1
The preceding statements of Mineral Resources conform to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages reported are
dry metric tonnes. Minor differences may occur due to rounding to appropriate significant figures. For White Rock & White Rock North. AgEq calculated using the formula: AgEq = Ag + 84.0712xAu + 93.2167xCu +
36.0156xZn + 27.0117xPb and Recoveries applied are 72% (Au), 71.7% (Ag), 66% (Cu), 85% (Zn) and 85% (Pb). For Kylo, Strauss, & Red Rock AgEq calculated using the formula: AgEq = Ag + 101.417xAu +
125.477xCu + 35.4288xZn + 28.23323xPb and Recoveries applied are 83.1% (Au), 68.6% (Ag), 85% (Cu), 80% (Zn) and 85% (Pb).For Lady Hampden, Silver King, and Lead Block, AgEq calculated using the formula:
AgEq = Ag + 82.4186xAu + 63.0108xCu + 27.0046xZn + 21.5193xPb and Recoveries applied are 88.6% (Au), 90% (Ag), 56% (Cu), 80% (Zn) and 85% (Pb). AgEq formula calculated using silver price of $43/oz, gold
price of $3600/oz, copper price of $14000/t, zinc price of $4200/t and the lead price of $3150/t (all AUD). In the opinion of the Company, all elements included in the metal equivalent calculation have a reasonable
potential to be sold and recovered based on current market conditions and metallurgical test work up to 2017.
21
Prospect Classification
Resource Tonnes and Grade Contained Metal
Tonnes
(Kt)
Au (g/t) Ag (g/t) Cu% Pb% Zn% AgEq (g/t) Au (Koz) Ag (Koz) Cu (kt) Pb (kt) Zn (kt) AgEq (Koz)
Strauss
Indicated 2,818 1.1 3.1 0.09 0.07 0.6 149 98 281 3 2 16 13,500
Inferred 2,026 1 2 0.08 0.04 0.4 130 63 129 2 1 9 8,468
Kylo
Indicated 2,842 1.1 2.1 0.07 0.05 0.4 138 103 191 2 1 11 12,609
Inferred 2,081 0.6 3.8 0.11 0.06 0.6 101 40 251 2 1 13 6,757
Guy Bell Inferred 2,512 0.7 2.3 0.16 0.08 0.6 117 58 188 4 2 15 9,449
Carrington Inferred 2,236 0.5 5.6 0.14 0.08 0.2 83 33 403 3 2 4 5,967
Red Rock Inferred 8,605 0.5 7.4 0.04 0.12 0.49 84 144 2046 3 10 43 23,239
Lady
Hampden
Indicated 2,136 0.71 62 0.01 0.03 0.07 124 49 4251 0 1 2 8,516
Inferred 2,125 0.74 35 0.01 0.04 0.08 100 51 2388 0 1 2 6,832
Silver King
Indicated 469 0.12 80 0.01 0.03 0.07 93 2 1200 0 0 0 1,402
Inferred 106 0.05 53 0.01 0.02 0.05 60 0 180 0 0 0 204
Lead Block Inferred 215 0.21 44 0.01 0.03 0.08 66 2 307 0 0 0 456
White Rock
Indicated 3,135 0.05 66 0.02 0.22 0.73 104 5 6629 1 7 23 10,482
Inferred 1,051 0.08 37 0.02 0.16 0.62 72 3 1258 0 2 7 2,433
White Rock
North
Inferred 2,039 0.05 70 0.01 0.14 0.11 83 4 4592 0 3 2 5,441
Total 34,396 104.7 653 24,294 20 33 146 115,756