New Scoping Study underway after positive Metallurgical Study
completed at Mt Carrington
Ausenco commencing Stage 2 Study work on the polymetallic 1.2Moz Gold-Eq. resourcei,1
Expanded Stage 2 Scoping Study Underway
Ausenco Pty Ltd (Ausenco), a global leader in engineering, consulting, and project delivery, has been
engaged to complete an Expanded Stage 2 Scoping Study (Gold & Critical Minerals) for the Mt
Carrington Project. This follows on from the positive Stage 1 Study (Gold only) and Metallurgical
Bridging Study.
• The fundamental differences in the expanded Stage 2 Scoping Study will be:
o Evaluation of the entire 1.2Moz AuEq Mineral Resourceiv
(MRE) as Legacy Minerals’ earlier
Stage 1 only evaluated 0.2Moz Auii
and,
o Evaluation of flotation processing to maximise recoveries from polymetallic deposits.
• The Stage 1 Scoping Study demonstrated robust financials with NPV8 of A$404M, an All-in-
sustaining cost of A$1,709/oz, and low capital expenditurev
.
Positive outcomes identified in the Metallurgical Bridging Study
• Processing methods that maximise metallurgical recovery of both precious metals with reasonable
payability are recognised as the key enabler to unlock revenue from the silver-dominant deposits.
o This represents a significant improvement on previous operations at Mt Carrington, where
historical production focused on carbon-in-leach processing methods.
• Utilising flotation to produce a precious metal concentrate is expected to realise the highest value
from both the gold-dominant and silver-dominant deposits at the Mt Carrington Project.
• A flotation circuit flowsheet also allows for optionality to add additional flotation circuits to
liberate elements such as copper and zinc.
Significant Sunk Capital and Site infrastructure
• Strengthening the development case opportunity is the existing infrastructure at Mt Carrington.
• This includes stripped open pits (ore body exposed at surface), completed haul roads, tailings dam,
installed 750ML freshwater dam, existing 11kV grid connection (132kV grid easement
constructed), and minor site infrastructure.
• Legacy Minerals estimates that close to $40m in capital has been spent by previous mining and
exploration companies across the Project Area.
Drilling and Development Strategy
• Legacy Minerals has a dual-track strategy to unlock value from the Mt Carrington Project that
includes 1) discovery-focused drilling and 2) project development.
• Drilling is currently underway, testing greenfield targets with a focus on gold, silver, and copper.
ASX Announcement
19 November 2025
1. See Endnotes on Page 10 for References
Page 2 of 10
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Legacy Minerals Holdings Limited (ASX: LGM, “LGM”, “the Company” or “Legacy Minerals”) is pleased
to advise that it has completed a positive Metallurgical Bridging Study and is progressing with an
expanded, Stage 2 Scoping Study at the Mt Carrington Gold-Silver Project in NSW (EL6273, EL9616,
EL9727, ALA75).
Management Comment Legacy Minerals CEO & Managing Director, Christopher Byrne said:
“Legacy Minerals is pleased to report that the Bridging Study completed by Ausenco has delivered a
clear and encouraging forward pathway for the Mt Carrington Project. The study provides the clearest
technical guidance to date on how the gold-silver (zinc-copper) system should be developed and
confirms genuine potential for growth and value creation.
Significantly, the study cuts through years of competing development concepts and demonstrates that
a streamlined, precious-metals-focused flowsheet represents the most robust and economically
attractive development route for the project while providing flexibility to add additional floatation
circuits when appropriate in the future to potentially recover copper and zinc.
What is particularly encouraging is that the study highlights a significant opportunity in the silver-
dominant deposits, especially Lady Hampden and White Rock, with a flowsheet designed to efficiently
recover the high silver content.
The Bridging Study also validates the quality of historical metallurgical work, with strong flotation
performance consistently demonstrated across both gold and silver ores. This gives us a high level of
confidence as we move toward more detailed study phases.
Overall, the study positions Mt Carrington as a simplified, lower-risk and higher-value development
opportunity. The outcomes are very favourable for our shareholders and significantly strengthen the
foundation to advance Mt Carrington towards becoming a modern mining and processing operation.
On the back of the positive outcomes stemming from the metallurgical review, the updated 2025
Mineral Resource Estimate and the Phase 1 Scoping Study, Ausenco is working on an expanded Stage
2 Scoping Study. The Stage 1 Scoping Study demonstrated robust economics with an NPV8 of A$388
million and an IRR of 141% at a $5,000oz gold price, but only evaluated 16% of the current Mineral
Resourceii
.
Coupled with our ongoing exploration drilling, we look forward to advancing the project into the next
stage with the Phase 2 Scoping Study expected to be completed in early Q1, 2026.”
Stage 2, Expanded Gold + Critical Minerals, Scoping Study
The Stage 1 Scoping Study evaluated only 0.2 million ounces (Moz) of gold from the total 1.2 Moz gold
equivalent (AuEq) Mineral Resource Estimate (MRE) defined in 2025. The Stage 2 Scoping Study is
expected to be completed in the first quarter of 2026, and its key activities include conducting a
strategic review and becoming familiar with the MRE; performing preliminary pit shell optimization
and conceptual open-pit design; managing waste and ore stockpiles; creating a high-level mine
schedule and estimating life-of-mine factors; planning the site layout in coordination with Ausenco’s
infrastructure design; estimating capital expenditure (CAPEX) and operational expenditure (OPEX) for
mining operations; developing a risk register and identifying uncertainties associated with the project;
and making recommendations for next steps and potential opportunities for enhancement.
The main objectives of the Stage 2 Scoping Study are to integrate mining and processing into a
cohesive scoping study, identify the most profitable configuration for the processing plant and product
strategy, develop a standalone financial model that incorporates outcomes from both mining and
Page 3 of 10
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
processing, and define the steps necessary to advance the project to a more detailed engineering
phase.
About Ausenco
Ausenco is a global engineering, consulting and project delivery firm built for the minerals and metals
industry. With three decades of international experience, we work alongside clients to navigate
complex challenges from first study to final closure—across every phase, on five continents. Deeply
rooted in the minerals and metals industry, our people combine technical depth, hands-on expertise,
and hard-earned insight to deliver practical, forward-thinking solutions that reduce risk and unlock
value.
Bridging Study Overview
Ausenco was engaged to assess the potential processing strategies for Legacy Minerals’ Mt Carrington
Project to inform a detailed evaluation of short-listed options as part of a Stage 2 Scoping Study.
It was clearly recognised that processing methods that maximise metallurgical recovery of both
precious metals with reasonable payability are a key enabler to unlock revenue from the silver-
dominant deposits. Utilising flotation to produce a precious metal concentrate is expected to facilitate
the exploitation of both the gold-dominant and silver-dominant deposits, which will maximise project
revenue. The flotation process also offers flexibility to adjust plant configuration and operating
parameters to suit the requirements of the various deposits.
The next phase of study is intended to further define an integrated mine-mill strategy for the project,
including consideration of deposit sequencing. An integrated strategy will be critical to maximising the
revenue potential of the Mt Carrington Resource using a flotation process.
Recommendations from the study include further flotation test work, including 3-stage dilution testing
to simulate Jameson cell performance. The objective would be to investigate the potential to improve
recovery from fine and ultrafine size fractions. Furthermore, Ausenco recommends completing Bond
Ball and Crushing work index, SMC and Abrasion tests on all resources under investigation. The next
phase of the Scoping Study should define an integrated mine-mill strategy for the project, including
consideration of deposit sequencing. An integrated strategy will be critical to maximising the revenue
potential of the Mt Carrington resource using a flotation process.
Stage 1 (Gold Only) Scoping Study Results
Mining Plus, a global mining services provider, was engaged by Legacy Minerals to review and update
the 2020 Pre-Feasibility Study (2020 PFS) for the Mt Carrington Project following the delivery of the
updated 2025 MRE announced on 13 March 20252F
iii
and updated on 1 September 2025iv
. Due to the
outstanding results of this review and with a goal of a more extensive study, Legacy Minerals elected
to complete a Stage 1 Scoping Study as an alternative to updating the 2020 PFS. The results of the
Study demonstrate robust economics and provide valuable information to help drive potential
Resource growth through infill, expansion, and exploration drilling.
Pre-tax highlights, based on a base case gold price of $5,00/oz, includedv
:
• NPV at 8%: A$388 million
• IRR: 141%
• Free cash flow: A$405M
• Total Gold Production: 172,600oz Au
• Mine Life of Stage 1 Study: 5.5 Years
• All-in-sustaining cost: A$1,726/oz
Page 4 of 10
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Key Parameters and approximate estimates:
• Payback period of ~16 months from pre-tax cash flows.
• Average gold production of ~31,400oz pa with 83% gold recovery.
• Mine design is based on open-pit mining methods, with a 1MT processing plant.
• Value of already built haul roads, water supply, and tailings dam demonstrated by ~A$47M
CAPEX.
• Planned processing of ~5.06Mt of material at ~1.29g/t Au for ~172,600oz Au.
Mt Carrington Site Infrastructure
Strengthening the development case opportunity is the existing infrastructure at Mt Carrington.
Legacy Minerals estimates close to $40m in capital has been sunk by previous mining and exploration
companies. This includes stripped open pits (ore body exposed at surface), completed haul roads, built
tailings dam, installed 750ML freshwater dam, existing 11kV grid connection with 132kV grid
easement constructed, and minor site infrastructure.
Cautionary Statement
The Scoping Study is a preliminary technical and economic assessment of the Drake Project. It considers
the potential viability of the Project based on low-level technical and economic assessments. These
assessments are insufficient to support the estimation of Ore Reserves or an investment decision.
Further evaluation work and studies are required before Legacy Minerals can provide assurance of an
economic development case or certainty that the conclusions of the study will be realised.
Mineral Resources considered in the Study include both Indicated and Inferred category resources as
described under the JORC Code (2012 Edition). Investors are cautioned that there is a low level of
geological confidence in Inferred Mineral Resources, and there is no certainty that further exploration
work will result in the determination of Indicated Mineral Resources or that the production targets
themselves will be realised. This Study is based on high-level technical and economic assessments (+/-
35% accuracy) that are not sufficient to support the estimation of Ore Reserves for the Project for an
investment decision to be made. Further exploration and evaluation work and appropriate studies are
required before Legacy Minerals will be in a position to estimate any Ore Reserves or to provide any
assurance of an economic development case.
The Scoping Study is based on the material assumptions outlined below. These include assumptions
about the availability of funding, access agreements, the timing for development, and future granting
of leases required for mining. While Legacy Minerals considers all of the material assumptions to be
based on reasonable grounds, there is no certainty that they will prove correct or that the range of
outcomes indicated by the Scoping Study will be achieved. To achieve the range of outcomes indicated
in the Scoping Study, funding in the order of $46 million will likely be required and Investors should
note that there is no certainty that the Company will be able to raise that amount of funding when
needed. It is also possible that such funding may only be available on terms that may be dilutive to or
otherwise affect the value of the Company’s existing shares.
It is also possible that Legacy Minerals could pursue other ‘value realisation’ strategies such as a sale,
partial sale or joint venture of the project. If it does, this could materially reduce Legacy Mineral’
proportionate ownership of the project.
Given the uncertainties involved, investors should not make any investment decisions based solely on
the results of the Scoping Study.
Page 5 of 10
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Figure 1. Mt Carrington Site Infrastructure
Upcoming Programs of Work
Ongoing programs of work across the Project include:
1. Discovery drilling: drilling program ongoing, systematically testing for new greenfield
epithermal-porphyry mineralisation within the Drake Caldera, including Battery, Emu and
Mascotte prospects.
2. Resource extension assessment: Test the brownfield targets at depth and along strike of high-
grade gold, silver, and copper zones that offer the potential for further substantial Resource
growth. Government approvals pending.
3. Increase resource confidence: by confirming and infilling historical drill results within the
existing Inferred Resources.
4. Study Work: Stage 2 Scoping Study, assessing the 1.2Moz AuEq resource.
Page 6 of 10
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
About the Mt Carrington Project
The Mt Carrington Project contains three granted exploration licences covering an area of 390km2
and
an Assessment Lease Application (ALA75) covering 0.46km2
over part of the Mt Carrington Area. An
assessment lease authority exists as a ‘bridge’ between exploration and mining, where progression to
mining status is reasonably foreseeable.
The Project encompasses substantial infrastructure on the granted exploration licenses, including a
tailings dam, grid easements, a 550ML water source, a site office, accommodation, a core shed, and
core processing facilities. This Study covers resources and infrastructure contained across ALA75 and
Exploration License EL6273.
The Project has combined resources of 34 Mt, containing 1.2 Moz of contained AuEq metaliv
. Gold and
silver are the dominant contained metals in the Resource (653koz Au, 24.3Moz Ag), with significant
zinc content (147kt Zn) and lesser amounts of copper (20kt Cu) and lead (33kt Pb).
Figure 2. Mt Carrington Project showing deposits and major prospects3F3F
iv
.
Page 7 of 10
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Approved by the Board of Legacy Minerals Holdings Limited.
For more information:
Investors:
Chris Byrne
CEO & Managing Director
chris.byrne@legacyminerals.com.au
+61 (0) 499 527 547
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
+61 (0) 419 929 046
DISCLAIMER AND PREVIOUSLY REPORTED INFORMATION
Information in this announcement is extracted from reports lodged as market announcements referred to above and
available on the Company’s website https://legacyminerals.com.au/. The Company confirms that it is not aware of any new
information that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed.
This announcement contains certain forward-looking statements. Forward-looking statements are only predictions and are
subject to risks, uncertainties and assumptions which are outside of the control of Legacy Minerals Holdings Limited (LGM).
These risks, uncertainties and assumptions include commodity prices, currency fluctuations, economic and financial market
conditions, environmental risks, legislative, fiscal or regulatory developments, political risks, project delay, approvals and
cost estimates. Actual values, results or events may be materially different to those contained in this announcement. Given
these uncertainties, readers are cautioned not to place reliance on forward-looking statements. Any forward-looking
statements in this announcement reflect the views of LGM only at the date of this announcement. Subject to any continuing
obligations under applicable laws and ASX Listing Rules, LGM does not undertake any obligation to update or revise any
information or any of the forward-looking statements in this announcement to reflect changes in events, conditions or
circumstances on which any forward-looking statements are based.
COMPETENT PERSON’S STATEMENT – LEGACY MINERALS PORTFOLIO
The information in this Report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is
based on information compiled by Thomas Wall, a Competent Person who is a Member of the Australian Institute of
Geoscientists. Mr Wall is the Technical Director and a full-time employee of Legacy Minerals Pty Limited, the Company’s
wholly-owned subsidiary, and a shareholder of the Company. Mr Wall has sufficient experience that is relevant to the style
of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves. Mr Wall consents to the inclusion of the matters based on this information in the form and context in which
it appears in this announcement.
COMPETENT PERSON’S STATEMENT – MT CARRINGTON RESOURCE
The information in this announcement that relates to production targets, assumptions on Modifying Factors and evaluation
of other relevant factors is based on, and fairly represents information and supporting documentation that has been
compiled under the supervision of Mr David Billington (Mining), a Competent Person who is a Member of the Australasian
Institute of Mining and Metallurgy (AusIMM). Mr Billington is an employee and security holder of Mining Plus Pty Ltd. Mr
Billington has reviewed and approved the technical content of this announcement. Mr Billington has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources
and Ore Reserves’ (the JORC Code). Mr Billington consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
The information in this announcement that relates to the Mineral Resource Estimate and classification of the Mt Carrington
Project is based on information compiled by Kate Kitchen, who is a Member of the Australasian Institute of Mining and
Metallurgy and a Member of the Australian Institute of Geoscientists. Kate Kitchen is an independent consultant employed
full time by Mining Plus Pty Ltd. Kate Kitchen has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (‘the
JORC code’). Kate Kitchen consents to the inclusion in the report of the matters based on the information in the form and
context in which it appears.
Page 8 of 10
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
About Legacy Minerals
Legacy Minerals is an ASX-listed public company that has been exploring gold, copper, and base-metal projects
in NSW since 2017. The Company projects present significant discovery opportunities for shareholders, with a
focus on discovery drilling and the development of the Mt Carrington Project.
Au-Ag Bauloora
One of NSW’s largest low-sulphidation, epithermal
systems with a 15km2
epithermal vein field.
Cu-Au Mt Carrington
Large caldera (~150km2
) with similar geological
characteristics to other major Pacific Rim low-sulphidation
deposits.
Cu-Au Rockley
Prospective for porphyry Cu-Au and situated in the
Macquarie Arc Ordovician host rocks with historic high-
grade copper mines.
Au-Cu (Pb-Zn) Cobar
Undrilled targets next door to the Peak Gold Mines and
along strike of the CSA copper mine.
Au-Ag Black Range
Extensive low-sulphidation, epithermal system with
limited historical exploration. Epithermal occurrences
across 30km of strike.
Au Harden Hilltops JV
Substantial historical gold production from two high-grade
and poorly tested orogenic systems.
Cu-Au Glenlogan S2 Resources JV
An untested porphyry search space located 55 km from
Australia’s largest porphyry complex, Cadia Valley.
Au-Cu Fontenoy Earth AI JV
A highly prospective and underexplored area for PGE, Ni,
Au and Cu mineralisation with significant drill intercepts.
Cu-Au Thomson Rio Tinto Option
A new and unexplored Intrusion-related gold and copper
system search space with numerous ‘bullseye’ magnetic
and gravity anomalies that remain untested.
Ni-Co Nico Young Cobalt Blue MoU
One of the largest nickel deposits in Australia with
significant counter-cyclical exposure.
Figure 3. Location summary of Legacy Minerals’ Projects in NSW, Australia, and major mines and deposits
Page 9 of 10
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Appendix A: Mt Carrington Mineral Resourcesiv
9F9iv
Prospect Classification Resource Tonnes and Grade Contained Metal
Tonnes (Kt) Au (g/t) Ag (g/t) Cu% Pb% Zn% AuEq (g/t) Au (Koz) Ag (Koz) Cu (kt) Pb (kt) Zn (kt) AuEq (Koz)
Strauss Indicated 2,818 1.1 3.1 0.09 0.07 0.6 1.5 98 281 2.5 2.0 16 136
Inferred 2,026 1.0 2.0 0.08 0.04 0.4 1.3 63 129 1.7 0.8 9 85
Kylo Indicated 2,842 1.1 2.1 0.07 0.05 0.4 1.4 103 191 2.0 1.4 11 128
Inferred 2,081 0.6 3.8 0.11 0.06 0.6 1.0 40 251 2.2 1.2 13 67
Guy Bell Inferred 2,512 0.7 2.3 0.16 0.08 0.6 1.2 58 188 4.0 2.1 15 97
Carrington Inferred 2,236 0.5 5.6 0.14 0.08 0.2 0.8 33 403 3.1 1.7 4 58
Lady Hampden Indicated 2,136 0.7 61.9 0.01 0.03 0.07 1.49 49 4,251 0.2 0.7 1.6 102
Inferred 2,125 0.7 35 0.01 0.04 0.08 1.17 50 2,388 0.2 0.8 1.7 80
Silver King Indicated 469 0.12 80 0.01 0.03 0.07 1.13 1.8 1,200 0.05 0.14 0.3 17
Inferred 106 0.05 53 0.01 0.02 0.05 0.72 180 0.2 0.01 0.02 0.1 2
Lead Block Inferred 215 0.21 44 0.01 0.03 0.08 0.79 1.5 307 0.02 0.07 0.2 5
Mt Carrington Group Total 19,566 1.1 15.2 0.08% 0.06% 0.37% 1.2 677.3 9589.2 15.98 10.93 71.9 777
White Rock North Inferred 2,039 0.05 70 0.01 0.14 0.11 0.99 3.5 4,592 0.3 2.8 2.3 65
White Rock Indicated 3,135 0.05 66 0.02 0.22 0.7 1.23 5.4 6,629 0.6 7 22.8 124
Inferred 1,051 0.08 37 0.02 0.16 0.6 0.85 2.6 1,258 0.2 1.7 6.5 29
White Rock Group Total 6,225 0.1 62.4 0.02% 0.18% 0.51% 1.1 12 12,479 1 12 32 218
Red Rock Inferred 8,605 0.5 7.4 0.04 0.12 0.49 0.8 144 2046 3.2 10.3 43 232
Total Resource Indicated 11,400 0.7 34.2 04F
v
.05% 0.10% 0.45% 1.4 257 12,552 5 11 52 507
Inferred 22,996 0.5 15.9 0.06% 0.09% 0.41% 1.0 396 11,742 15 22 95 720
Total 34,396 0.6 22.0 0.06% 0.10% 0.43% 1.1 653 24,294 20 33 147 1,227
All tonnages reported are dry metric tonnes. Minor differences may occur due to rounding to appropriate significant figures. AuEq calculated using the formula: AuEq = Au + 0.00986xAg +
1.237237xCu + 0.3493xZn + 0.2784xPb. Formulas calculated using silver price of A$43/oz, gold price of A$3,600/oz, copper price of A$14,000/t, zinc price of A$4,200/t and lead price of A$3,150/t.
In the opinion of the Company, all elements included in the metal equivalent calculation have a reasonable potential to be sold and recovered based on current market conditions and metallurgical
test work up to 2017.
Page 10 of 10
ASX: LGM
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
Endnotes
i
LGM ASX Release, 1 September 2025, Metallurgical Study Commences at Mt Carrington Project, ASX Release LGM, 25 August
2025, Drilling Approval and New Targets at Mt Carrington Project
ii
LGM ASX Release, 15 April 2025, Amendment - Release 11 April 2025
iii
LGM ASX Release, 13 March 2025, New Drake Resource of 0.8Moz Gold-Eq and 35Moz Silver-Eq
iv
LGM ASX Release, 1 September 2025, Metallurgical Study Commences at Mt Carrington Project, ASX Release LGM, 25
August 2025, Drilling Approval and New Targets at Mt Carrington Project
v
LGM ASX Release, 15 April 2025, Amendment - Release 11 April 2025
Share your feedback
Discover