Nico Young - Mineral Resource Review
One of Australia’s largest contained Nickel and Cobalt resources
Nico Young – NSW’s Largest Nickel and Cobalt Deposit
•
The Nico Young deposit has an estimated Mineral Resource of 167.8 Mt @ 0.59% Ni and 0.06% Co at
a 0.6% NiEq cut-off, classified in compliance with JORC (2012), representing contained metal of
approximately 1Mt of nickel and 100 kt of cobalt i,1.
Table 1: Nico Young 2017 Inferred Resource at a 0.6% NiEq cut-offi
Tonnes (Mt)
Ni grade (%)
Co grade (%)
167.8
0.59
0.06
Contained Ni
metal (Kt)
996.7
Contained Co
metal (Kt)
96.6
•
The Administrator of Jervois Global Limited (Administrators Appointed – In Liquidation – “Jervois”)
relinquished the Nico Young exploration licence, creating an opportunity for Legacy Minerals to peg
this nationally significant deposit under Exploration Licence application ELA6901.
•
There are no liabilities, encumbrances or private royalties associated with the Nico Young deposit,
presenting the Company with exceptional optionality and leverage to Ni and Co prices.
About Jervois Global Ltd and Nico Young
•
Global mining company Jervois held the Nico Young deposit as an early flagship asset in its portfolio as
it grew to a $1B market capitalisation ii.
•
Jervois recently entered into USA Chapter 11 Bankruptcy and its 100% subsidiary, Nico Young Pty Ltd,
relinquished the Project iii.
Nickel and Cobalt in NSW
•
There are four major nickel-cobalt/scandium deposits in central NSW - Nico Young (LGM:ASX), Sunrise
(Sunrise Energy Metals, SRL:ASX), Platina (Rio Tinto, RIO:ASX), and Melrose (Rimfire, RIM:ASX).
•
Sunrise Energy Metals is Co-Chaired by Robert Friedland (~11% owner iv) and has a Measured and
Indicated Resource of 160Mt at 0.56% Ni, 0.09% Co, and 71pppm Sc (0.35% NiEq cut-off) v.
Highly Leveraged to the Nickel and Cobalt Price
•
Currently at lows in the commodity price cycle, nickel-cobalt is oversupplied due to a flood of Chinese
owned refinery product from Indonesia and the Philippines, significantly impacting markets.
Strategy to Deliver Shareholder Value
•
Legacy Minerals is actively looking to secure a partner for the Project. With its profile as one of
Australia’s largest nickel deposits, it immediately presents a significant opportunity for both national
and international parties looking to secure a strategic deposit of critical minerals nickel and cobalt.
•
The Company will minimise holding costs and preserve the asset until market conditions improve to
realise value. Minimal holding costs are to be funded from Legacy’s existing cash reserves.
•
The Drake, Thomson, and Black Range Projects remain the Company's core focus, supported by its
portfolio of joint ventures with Newmont, S2 Resources, Helix, and EarthAi.
1 See JORC Code and ‘Endnotes’ on page 37 for references
Page 1 of 37 | ABN 43 650 398 897
3/202 Russell Street Bathurst, 2795
www.legacyminerals.com.au
ASX: LGM
Page 2 of 37
Legacy Minerals Holdings Limited (ASX:LGM, “the Company”. “Legacy Minerals”) is pleased to
announce the results of a review of the Nico Young cobalt-nickel laterite project in central New South
Wales by ERM Australia Consultants Pty Ltd (ERM), including a JORC Table, and Competent Persons
Statement as required in the ASX Release dated 16 May 2025 “Retraction Announcement 13 May
2025”. ERM’s review confirms the veracity of previous work completed in 2017 for the project’s
previous owners, Jervois Global Limited (Administrators Appointed – in Liquidation - “Jervois”).
Management comment – Legacy Minerals CEO & Managing Director Christopher Byrne said:
“A free-peg, representing a zero-dollar acquisition cost of a near 1-million tonne, nationally significant,
JORC 2012 compliant, nickel-cobalt deposit is a great, long-term opportunity for our shareholders.
Securing an exploration license application over the Nico Young Nickel-Cobalt Project represents a
highly strategic, counter-cyclical move with immense upside.
Nico Young is the largest contained nickel deposit in NSW, which also hosts other major Ni-Co deposits
including the nearby Robert Friedland-led Sunrise Energy Metals. Given the current depressed market
conditions for nickel and cobalt, Legacy Minerals is leveraging this low-cost, counter-cyclical approach
to position the Company to benefit from future strengthening in the nickel market through its 100%
owned subsidiary Nickel Mines Pty Ltd.
The NiCo Young deposit is also known to contain zones of enriched scandium which have not been
historically reported. Initiatives are underway to ascertain if these scandium levels are of significance
and could potentially be incorporated into a viable development plan. Likewise historical samples were
not tested for platinum group metals and steps are underway to reassess these intersections.
This diversification adds optionality to the Company's overall asset base that ensures that Legacy has
exposure to a range of precious metals and critical minerals for battery production. With our gold,
copper, and silver focus at the Drake, Thomson, and Black Range Projects, and joint venture projects
Bauloora and Glenlogan being explored by joint-venture partners Newmont and S2 Resources,
shareholders have significant exposure to a multi-commodity, multi-project discovery and
development opportunity.
Nico Young also allows Legacy Minerals to leverage the development work previously undertaken by
Jervois Global, estimated at over $25 million, including drilling campaigns and environmental studies,
thereby reducing initial assessment costs and accelerating project advancement.”
Project Overview
The project is located approximately 300 km west of major coastal ports in Sydney and Wollongong.
The project is also favourably located geographically due to its proximity to existing rail and road
infrastructure within 15 km of the project site, the Cooper Basin gas pipeline and regional population
centres.
The Nico Young deposit is currently amongst the four largest Ni-Co deposits identified in NSW, which
also include Sunrise (Sunrise Energy Metals, SRL:ASX), Platina/Burra (Rio Tinto, RIO:ASX), and Melrose
(Rimfire, RIM:ASX) (Figure 1).
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 3 of 37
Figure 1: Location of major nickel-cobalt/scandium deposits and occurrences in NSW
The Nico Young project was secured by Legacy in May 2025 following relinquishment of exploration
tenure covering the project by the Administrators of Jervois. This enabled Legacy to apply for an
exploration licence on untenured land containing the deposit as exploration licence application (ELA
6901). The project was secured with no associated liabilities, encumbrances or private royalties.
Nickel and cobalt are currently experiencing declining prices since early 2023, with the market
experiencing oversupply due to expansion of lateritic nickel mining and refined metal production from
Indonesia and the Philippines.
Mineral Exploration Tenure
ELA6901 was lodged by Legacy subsidiary Nickel Mines Pty Ltd on 30 April 2025, covering an area of
46 units about 30 km southwest of Young, near Wallendbeen NSW (Figure 2).
Jervois held the project under two Mineral Exploration Licences: EL5527 (Ardnee) and EL EL5571
(Thuddungra). The two licences were relinquished by Jervois’ Administrators who placed most value
on the company’s North American assets.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 4 of 37
Figure 2: Plan view map of ELA6901 (black outline) over solid geology interpretation. CML15 (red area) is
excised from ELA6901, an active magnesite mine, and is not held by Legacy Minerals.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 5 of 37
Geology and Geological Interpretation
Mineralisation within the Nico Young project area is hosted by Ordovician metasedimentary and mafic
metavolcanics and mafic intrusives assigned to the Jindalee Beds, close to the contact with an
extensive Silurian granodiorite complex. Mineralisation is interpreted to be associated with induration
of lateritic regolith by leached fluids from this granodiorite, resulting in enrichment of nickel, cobalt
and scandium.
Two deposits have been identified within the project area: Ardnaree and Thuddungra.
The Ardnaree deposit extends over 9km along strike and up to 700m across strike, with mineralisation
present from surface to a maximum vertical depth of 56m. Average mineralisation thickness is 13m,
with nearly 100% of mineralisation above 50m depth.The Ardnaree deposit extends over 9km along
strike and up to 700m across strike, with mineralisation present from surface to a maximum vertical
depth of 56m. The average mineralisation thickness of mineralisation is 13m, with nearly 100% of
mineralisation above 50m depth.
The Thuddungra Deposit extends 5.9km along strike up to the northern boundary of ELA6901 and up
to 715m across strike, with mineralisation present from 6m below the topography surface to a
maximum vertical depth of 98m. The average mineralisation thickness is 22m, with 79% of
mineralisation above 50m depth.
The laterite profile developed within the deposit area typically comprises hematitic clay and limonitic
clay overlying saprolite, which in turn overlies a weathered serpentinite. Scandium is concentrated in
the upper layers, followed by cobalt enrichment within limonitic clay and saprolite, and then nickel
enrichment within the saprolite and weathered serpentinite.
Mineral Resource Estimate
Jervois reported an Inferred Mineral Resource estimated to comprise
• 167.8 Mt @ 0.59% Ni and 0.06% Co (using a 0.6% Ni equivalent cut-off),
including a higher grade zone of
• 42.5 Mt @ 0.80% Ni and 0.09% Co (using a 1.0% nickel equivalent cut-off) (Table 2).
Table 2: Nico Young Inferred Mineral Resource at 0.6% and 1.0% Ni equivalent cut-off grade
Prospect
Tonnes
(Mt)
Ni grade
(%)
Co grade
(%)
0.6% Ni equiv. cut-off
Ardnaree
53.6
0.66
0.05
Thuddungra
114.3
0.56
0.06
Total Nico
167.8
0.59
0.06
Young
Including higher grade mineralisation at 1.0% Ni Equiv. cut-off
Ardnaree
14.5
0.88
0.07
Thuddungra
27.9
0.76
0.10
Total Nico
42.5
0.80
0.09
Young
Contained Ni
(kt)
Contained
Co (kt)
355.6
641.1
24.6
72.0
996.7
96.6
127.6
211.2
10.3
27.7
338.8
38.0
Source: Jervois Mining ASX announcement, 22 Nov 2017, reviewed by ERM June 2025
The Mineral Resource Estimate was prepared by Geostat Services Pty Ltd (“Geostat”) and
independently audited by Snowden Mining Industry Consultants Ltd (“Snowden”) for Jervois. The
estimate was announced by Jervois in November 2017 (Jervois, 2017a, Jervois, 2017b). The Mineral
Resource estimate was classified and reported in compliance with the JORC Code 2012 edition (JORC,
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 6 of 37
2012). Work associated with an updated MRE was reported in June 2018 (Jervois, 2018), in a PFS study
progress announcement.
Previous Work
Since discovering the deposit in the late 1990s Jervois completed numerous studies involving drilling,
various hydrometallurgical and pyrometallurgical process routes. The Nico Young deposit also
contains variable levels of scandium. Initiatives were in progress to ascertain if these scandium levels
could be practically incorporated into a viable development plan. Likewise historical samples were not
tested for platinum group metals (PGE), and an opportunity remains to reassess their potential
presence and incorporation in the project scope.
Jervois commenced a prefeasibility study for the project in 2018. The results of a Preliminary Economic
Assessment (PEA) for Nico Young, intended to help attract a partner in the development of the project,
were released in May 2019 (Jervois, 2019).
Jervois reported investment of more than A$20 million in exploration of the Nico Young project in
August 2023 (Jervois, 2023).
Both scandium and PGE potential are being actively evaluated at the nearby Sunrise and Burra projects
by their respective owners (SRK, 2018) (Rio Tinto, 2023).
An extensive collection of detailed technical reports submitted by Jervois for EL5527 and EL5571 are
available through the NSW Government’s DiGS website (NSW Government, 2021). Legacy are in the
process of securing comprehensive data for the project held by Jervois.
Drilling and Sampling
Several drilling campaigns were completed by Jervois between 1998 and 2014. At the Ardnaree
deposit, drillholes were drilled on a total of 30 drill sections with drill spacing ranging from 90m to
650m along strike, and averaging 100m across strike. At the Thuddungra deposit, drillholes were
drilled on a total of 18 drill sections with drill spacing ranging from 200m to 420m along strike, and
averaging 100m across strike. All holes were drilled vertically, which is perpendicular to the overall
trend of mineralisation within the laterite profile. Approximately 63% of all drilling used aircore (AC)
techniques. Some 35% of drillholes were completed using reverse circulation (RC) drilling, and three
drillholes were completed using triple tube diamond (DD) drilling.
The locations of all drill holes were accurately surveyed using differential GPS equipment and are
considered to be accurate.
AC drillholes with diameters of 85 mm or 100 mm were sampled at 1 m intervals downhole. RC
drillholes were drilled using 100 mm or 127 mm face sampling hammers, with samples collected at
1.0 m downhole intervals. Triple tube HQ (HQ3, 61.1 mm) drill core was also sampled at 1.0 m
intervals, with quarter core submitted for analysis and the remaining core retained for future
resampling and reference.
Samples were split using riffle splitters to provide manageable. homogeneous samples for assay.
Sample residues were retained for reference. Wet samples were grab sampled to obtain material that
was air dried prior to being split and prepared for analysis.
Quality assurance measures, including standards, blanks and field duplicate samples were used to
monitor analytical data precision and accuracy. One in 20 sample pulps were sent to an independent
laboratory for verification of initial assay results.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 7 of 37
Sample Analysis
Sample preparation was performed by ALS, Orange. Prepared sub-samples were sent to ALS Brisbane
for analysis. Samples from pre-2004 drillholes were analysed for Ni and Co using a variety of sample
digests and AAS or ICP analytical methods. Approximately half of these samples were also analysed
for Sc using ICP-OES.
Drill holes completed between 2004 and 2007 were analysed for Ni and Co using a four-acid digest
and ICP-OES.
Drillholes completed in 2008 were analysed for a suite of elements including Ni, Co, major element
oxides (SiO2, Al2O3, Fe, MnO, MgO, CaO, K2O, Na2O, TiO2 and P2O5) and Cr2O3.
Samples from drillholes completed during and after 2014 were analysed using a four acid digest and
multielement ICP-OES methods.
Bulk densities were assigned based on lithology, using average values for measurements obtained
from diamond drill core for lithologies identified in the deposit.
Mineralisation Characterisation
The project’s MRE comprises approximately 25% limonite, 50% saprolite and 25% weathered
serpentinite. The three mineral types were used to establish domains for mineral resource estimation.
Mineral Resource Estimation
A block model based on 150 m (N) x 50 m (E) x 2 m (RL) cells with sub-blocking to 75 m (N), 25 m (E)
and 1 m (RL) cells was used for Mineral Resource estimation (MRE). Samples were composited to
1.0 m downhole lengths and flagged with the lithology in which they occurred. Spatial continuity was
assessed using variography. Ni and Co grades were estimated using Ordinary Kriging. Grade capping
was not necessary due to the low coefficients of variation observed in each lithology and a lack of
outlier values in assay data.
Mineral Resource Classification
Mineral Resource Estimates were classified using a combination of several criteria, including drill hole
spacing, lithology, quality assurance results for analytical data and confidence in mineralisation and
grade continuity.
All estimated Mineral Resources were classified as Inferred Resources.
Mineral Resource Reporting
Mineralisation forming the Nico Young deposit has been reported at a 0.6% Ni equivalent cut-off that
considers both Ni and Co analytical results and is considered a suitable cut-off for distinguishing
mineralisation with Reasonable Prospects for Eventual Economic Extraction (RPEEE) from low grade
mineralisation that does not satisfy the definition of a Mineral Resource specified in the JORC Code
(JORC, 2012).
The figure of 0.6% Ni equivalent is based on an empirical assessment of the value of mineralisation,
preliminary mining and processing costs and expected metallurgical recoveries for a project at a
relatively early stage of development that has been assessed to merit further, more detailed
evaluation. The estimate is not the basis of a detailed cutoff grade analysis that will be completed as
confidence in the project’s Mineral Resource increases and project studies become increasingly
focussed and detailed.
Reasonable Prospects for Eventual Economic Extraction Discussion
Reasonable prospects for economic extraction are based on the estimated value of nickel and cobalt
present in mineralisation intersected by drilling. Examination of drilling data shows that this
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 8 of 37
corresponds with the boundaries between significantly higher- and relatively lower grade
mineralisation that is also expected to be distinguishable visually
Other Modifying Factors
Determination of other modifying factors is at an early stage and will be addressed during drilling
required to improve confidence in the publicly reported Indicated Mineral Resource prepared for
Jervois.
Metallurgical Testing
Testwork completed by Jervois included:
• geometallurgical characterisation
•
determination of acid-soluble nickel and cobalt contents
•
acid consumption characteristics
•
heap leach testwork
•
agglomeration and hydrodynamic characterisation
The studies were designed to develop a flowsheet based on technically demonstrated processes and
process technology that have been applied commercially for the production of battery grade nickel
sulphate and cobalt sulphate for other projects. Testwork was completed by specialist metallurgical
laboratories in both Australia and USA (Jervois, 2019).
Mining and Metallurgical Parameters and Modifying Factors
Studies completed for the Nico Young project to date assume that mineralisation will be mined using
low cost, shallow-open cut techniques, with no requirement for blasting and processing of ore to
recover Ni and Co to a product at site. These studies are at an early stage. Jervois favoured Ni and Co
recovery using heap leaching methods.
The amenability of the Ni-Co mineralisation to physical beneficiation has been investigated by
previous laboratory studies involving crushing, wet screening, sizing, heavy-liquid and magnetic
separations. These studies showed that cobalt and nickel grades could be increased but this would be
at the expense of rejecting a significant portion of the feed. Testwork reported by Jervois confirmed
the underlying assumptions that high pressure acid leach (HPAL), used widely in lateritic Ni-Co ore
processing, would extract most of the Ni and Co present, consume less acid and leave iron largely in
the solid residue. Direct Acid and Heap Leach were also shown to be suitable but consumed more acid,
extracted less nickel and cobalt, and more iron than HPAL extraction.
Legacy considers heap leach Ni-Co recovery to be less energy intensive and lower capital cost than
alternative HPAL and Direct acid Leach processes. Column-leach tests undertaken by Jervois on a
weathered serpentinite extracted between 75% and 80% of both nickel and cobalt. Heap leach has
also been shown to deliver scandium (Sc) recoveries exceeding 80%.
Further studies will be required to determine the most appropriate ore processing option for the
project. Legacy proposes that potential exists for commercial scale heap leach Ni and Co recoveries of
between 75% and 80%.
Mining Studies
The progress of a preliminary mining study for the project was reported by Jervois in 2019 (Jervois,
2019) based on conventional truck and shovel mining with little or no blasting. Ore would be
transported to a central leach pad or low-grade stockpiles. Progressive backfilling of the open pit is
planned to eliminate the need for ex-pit waste dumps. The mine plan, completed for the project’s
PEA, used both Indicated and Inferred Mineral Resources, with Inferred Resources representing the
majority of the mined tonnes.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 9 of 37
An Ore Reserve for the project has not been prepared and would require further drilling to improve
the classification of the project’s MRE.
Project Strengths, Weaknesses, Opportunities and Threats
Strengths, weaknesses, opportunities and threats affecting the Nico Young project are examined in
the following table.
Table 3: Nico Young Deposit Strengths, Weaknesses, Opportunities and Threats
Strengths
Low sovereign risk jurisdiction with established
laws and regulations governing access to land
for exploration and mineral resource project
development.
History of mineral resource development and
mining throughout the state.
Close proximity to regional population centres
able to provide support engineering and
logistical services for the project, and a mine
workforce with relevant skills.
Access to road, rail, water, electrical, natural
gas and communications infrastructure.
Low retention costs, providing an opportunity
for Legacy to wait for more favourable market
conditions before incurring expenditure
required to progress the project further
towards development.
Innovative mining concept utilising placement
of waste rock in mined voids to remove the
need for ex-pit waste dumps and optimise
rehabilitation and closure costs.
Focus on established metal recovery
technologies with the objective of producing
battery-grade nickel sulphate and cobalt
sulphide products.
Produce nickel and cobalt expected to meet EU
Minerals Passport requirements and secure
broad market access.
Counter-cyclical conditions favoured Legacy’s
ability to secure the project.
Positive, intermediate to long-term demand
outlooks for both nickel and cobalt.
Substantial improvements in lateritic Ni-Co ore
processing technologies in recent years that
have resulted in laterites replacing sulphide
mineralisation as the principal source of Ni
globally.
Access to details of previous work provide an
opportunity to rapidly progress development of
the project when economic conditions favour
an investment decision.
Weaknesses
Project data needs to be recovered from NSW
Government and other sources to facilitate a
detailed review of work completed by previous
explorers.
Competition from nickel and cobalt laterite
mining and processing operations in Asia,
including Indonesia and the Philippines.
Relatively low nickel and cobalt prices,
reflecting a low point in cyclical markets.
The project is at a relatively early stage of
development with an Inferred Mineral
Resource, early metallurgical studies that have
confirmed that several processing flowsheets
could deliver technically and economically
viable options and preliminary analysis of likely
cutoff grades and modifying factors for use in
Ore Reserve estimation. This is a normal stage
in the development of mining projects.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 10 of 37
Advanced project with conceptual mining,
metallurgical process design, geotechnical and
water management studies commenced.
Opportunities
Potential to identify additional critical metals in
Nico Young mineralisation, including PGE and
scandium.
Potential for further exploration to identify
additional mineralisation forming a basis for
future extension of the project’s mineral
resource.
Adoption of heap leach technology for nickel,
cobalt (and scandium) recovery with potential
to develop a mine with highly competitive
operating costs.
Opportunity to monitor and implement
innovative, fit for purpose, mining technologies
including autonomous mining and haulage
equipment to reduce costs and enhance safety.
Threats
Recent history of opposition to new mineral
resource developments in New South Wales, in
part associated with activist activity and with
Federal Government decisions related to
environmental approvals.
Conclusions
Legacy has secured a significant Ni-Co deposit with extensive previous work that has the potential to
reduce the timeframe required for permitting and development of the project. The project is 100%
held by Legacy and free of royalties and other encumbrances.
ERM considers the approach followed by previous owners to evaluation of the Nico Young deposit to
be generally suited to global resource estimation of a Ni-Co laterite deposit at a relatively early stage
of development.
The Mineral Resource estimate for the project is considered by ERM to be likely to be robust.
Classification of the estimate as an Inferred Resource points to a relatively low level of confidence in
the estimate that will be improved by further studies and improved approaches to future Mineral
Resource evaluation work and studies. These measures will include:
• statistical demonstration of the compatibility of data provided by different drilling methods,
sampling strategies and analytical schemes
•
assessment of potential mining operations
•
detailed review of mineral processing and metallurgical methods
•
improvement in nickel equivalence estimation using a combination of commodity price,
metallurgical recovery and refining cost information
•
additional drilling required to increase confidence in the project’s Mineral Resource
estimate, required to support definition of Ore Reserves by applying modifying factors
specific to the Nico Young deposit
•
Identification of options in each of these areas will enhance the knowledge required to
support material project development decisions.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 11 of 37
Prevailing low Ni and Co prices are an incentive for Legacy to maximise value by completing a work
program sufficient to retain project tenements in good standing with the NSW government and seek
a partner to participate in development of the project when cyclical commodity prices improve.
Andrew Waltho, ERM Consulting Director, Mining Transactions and Corporate Advisory in ERM’s
Technical Mining Services team has the required qualifications and experience to assume Competent
Person responsibilities set out in the JORC, (2012) for the project.
A JORC Table 1 commentary on the exploration and MRE for the project accompanies this
announcement.
Bibliography
Jervois. (2017a, November 20). NiCo Young Cobalt-Nickel Laterite: Updated Mineral Resource.
Retrieved
from
Announcements
Australian
Securities
Exchange
(ASX):
https://announcements.asx.com.au/asxpdf/20171120/pdf/43pck3npm8xhsb.pdf
Jervois. (2017b, November 22). NiCo Young Cobalt-Nickel laterite: Additional Information. Retrieved
from
Australian
Securities
Exchange
(ASX):
https://announcements.asx.com.au/asxpdf/20171122/pdf/43pgtl2g2whfwy.pdf
Jervois. (2018, June 22). Jervois Mining provides progress update on Nico Young PFS. Retrieved from
ASX: https://announcements.asx.com.au/asxpdf/20180622/pdf/43vywt6wx5l8t1.pdf
Jervois. (2019, May 24). Positive Preliminary Economic Assessment for Nico Young and M2 Cobalt
Merger
Update.
Retrieved
from
ASX:
https://announcements.asx.com.au/asxpdf/20190524/pdf/445c32x3t3yh3c.pdf
Jervois. (2023, August 7). Jervois, building a leading independent cobalt and nickel company. Diggers
and
Dealers
Kalgoorlie
presentation.
Retrieved
from
ASX:
https://announcements.asx.com.au/asxpdf/20230807/pdf/05sd36rgdhl169.pdf
JORC. (2012, December 20). Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves (the JORC Code) 2012 edition. Retrieved from JORC:
https://www.jorc.org/docs/JORC_code_2012.pdf
NSW Government. (2021). Reports, Publications, Geotechnical . Retrieved from DiGS:
https://search.geoscience.nsw.gov.au/
Rio Tinto. (2023, April 28). Rio Tinto acquires high-grade scandium project in Australia. Retrieved from
Rio Tinto: https://www.riotinto.com/en/news/releases/2023/rio-tinto-acquires-high-gradescandium-project-in-australia
SRK. (2018). Sunrise Nickel Cobalt Project, New South Wales, Australia NI 43-101 Technical Report.
Perth: unpublished report, SRK Prohect CTQ002 for Clean TeQ Holdings Limited by SRK
Consulting (Australia) Pty Ltd.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 12 of 37
Approved by the Board of Legacy Minerals Holdings Limited.
For more information:
Investors:
Chris Byrne
CEO & Managing Director
chris.byrne@legacyminerals.com.au
+61 (0) 499 527 547
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
+61 (0) 419 929 046
DISCLAIMER AND PREVIOUSLY REPORTED INFORMATION
Information in this announcement is extracted from reports lodged as market announcements referred to above and
available on the Company’s website https://legacyminerals.com.au/. The Company confirms that it is not aware of any new
information that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed.
This announcement contains certain forward-looking statements. Forward looking statements are only predictions and are
subject to risks, uncertainties and assumptions which are outside of the control of Legacy Min
Share your feedback
Discover