Quarterly Activities and Cashflow Reports March 2023
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
28 APRIL 2023
March 2023 Quarterly Report
Legacy Minerals Holdings Limited (ASX: LGM) (“Legacy Minerals” or “the Company) is pleased to
provide shareholders with the following Quarterly Report for the three months ended 31 March 2023.
Bauloora Project Highlights
Drill Campaign
•
Maiden drilling campaign consisting of 10 diamond drill holes at the Mee Mar Prospect
identifying a significant new discovery of epithermal veins.
o
Low sulphidation epithermal veins and semi-massive sulphide mineralisation consistently
intersected across 1.5km strike of the Mee Mar Prospect
o
Drill hole MM008 intercepted 16m of low sulphidation epithermal style mineralisation parallel
to the Mee Mar vein trend, the largest intercept to date across the Bauloora Project.
o
Drilling supports the potential for a major epithermal gold-silver system across a 27km2 vein
field with extensive sinters confirmed supporting preservation of the boiling zone.
Figure 1: Hole MM008 and MM001 showing low sulphidation epithermal textured veins (chalcedony-quartzcarbonate) and breccia (galena-sphalerite-hematite).
Corporate Highlights
Newmont Farm-In and Joint Venture
•
Post quarter, Legacy Minerals entered a A$15M farm-in and joint venture agreement with
Newmont Exploration, a subsidiary of Newmont Corporation (“Newmont”, NYSE: NEM, TSX:
NGT).
Government Funding
•
Legacy Minerals awarded a $100,000 drilling grant and $48,000 geophysics grant under the latest
New Frontiers Exploration Program by the New South Wales State Government.
Cash Balance
•
Company’s cash balance as at 31 March 2023 was $1.4M
Page 1 of 13 | ABN 43 650 398 897
3/203 Russel Street Bathurst, 2795
www.legacyminerals.com.au
ASX: LGM
Page 2 of 13
Bauloora Project
Target Mineralisation - low sulphidation epithermal, Au-Ag
Figure 2: Legacy Minerals low sulphidation epithermal projects, Bauloora and Black Range, and other major
mines and deposits in NSW i,ii,iii,iv,v
Newmont and Legacy Minerals Farm-in and Joint Venture
Post-quarter, Legacy Minerals entered a A$15 million farm-in and joint venture agreement with
Newmont Exploration, a subsidiary of Newmont Corporation (“Newmont”, NYSE: NEM, TSX: NGT) at
Bauloora Project.
Farm-in and Joint Venture Summary
Minimum Commitment
•
•
•
Drill testing at the Breccia Sinter Prospect by end of 2023.
Undertake a regional aerial magnetic survey of the tenements by end of 2023.
A$2 million spend within 24 months.
Phase 1 - $5M earn-in for 51%
•
•
•
Subject to satisfying the minimum commitments, Newmont may acquire a 51% farm-in interest
in the Bauloora tenements by spending a total of A$5 million within 48 months.
Undertaking 4,000m of drilling within 48 months.
Legacy Minerals will act as operator during the initial earn in period.
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 3 of 13
Phase 2 - $10M earn-in for 75%
•
•
Subject to completion of Phase 1, Newmont may earn a further 24% farm-in interest in the
tenements by spending an additional A$10 million.
Undertaking a further 8,000m of drilling within 48 months.
Newmont financing facility and Mining Joint Venture
•
•
•
A Mining Joint Venture may be formed between the companies upon the decision to mine.
At the discretion of Legacy Minerals, LGM may enter an agreement to be loan carried through to
production through a Newmont financing facility, allowing Newmont to earn-in up to 80%.
The loan would be re-paid from Legacy Minerals’ share of any future mining proceeds.
Management
Legacy Minerals will act as operator during the initial earn-in period (up until year 4) and earn a 10%
management fee. Upon completion of the initial earn-in period, Newmont and Legacy Minerals will
form a joint venture, with a technical committee formed.
Diamond Drilling
During the quarter, Legacy Minerals completed ten diamond-cored drill holes for a total of 1,649m,
testing the 2km-long gold-silver (Au-Ag) bearing low sulphidation epithermal Mee Mar Vein (Figure
3).
Figure 3: Mee Mar Prospect showing location of completed and planned Phase One diamond drill holes over
Sb soil sample results, testing low sulphidation epithermal veins bearing Au-Ag and anomalous pathfinder
elements.
A significant new discovery has been identified from the diamond drilling which intersected
substantial low sulphidation epithermal style quartz veins and sulphide mineralisation across all holes
and remains open in all directions and at depth.
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 4 of 13
Figure 4: Hole MM009 (145m – 146m) showing colloform-crustiform chalcedony (green-brown) - galena (silver
to grey) – sphalerite (white to pale yellow) – chalcopyrite (yellow) mineralisation.
The drilling campaign provided evidence of a multistage mineralising system and supports the
potential for a major epithermal gold-silver system across a 27km2 vein field with extensive sinter
related lithology confirmed through petrology, supporting interpretation of boiling zone preservation.
Semi-massive sulphides (galena, sphalerite, chalcopyrite, pyrite) exhibit multiple generations of
sulphide deposition, brecciation and fluid flow, along with chalcedonic silica and hematite suggestive
of rapid deposition and quenching. Core processing and logging has been completed on all holes and
assays are currently pending.
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 5 of 13
NSW Government Grants
During the quarter, Legacy Minerals was awarded a $100,000 drilling grant and $48,000 geophysics
grant for the Bauloora Epithermal Gold Project under the latest New Frontiers Exploration Program
by the New South Wales State Government.
The award of the grants followed a competitive expert panel review process and funds are nondilutionary and fund all direct costs of drilling and geophysics on a dollar-for-dollar basis.
The funds received from the drilling grant will be used to support the first diamond drilling campaign
into the Breccia Sinter Prospect. The geophysics grant will support a drone magnetic survey over a
47.5km2 area with the goal to extend data along vein trends and help identify structures of the low
sulphidation system.
Bauloora Project Background
Legacy Minerals has progressively developed the Bauloora Project through systematic exploration
work including geological mapping, rock chip sampling, gradient array IP surveying, detailed ground
magnetic surveying, ASTER data acquisition/interpretation, and now widespread soil sampling to
determine alteration minerals. The assay results from this work strongly support the previous
assessments that there is significant potential for a major low sulphidation epithermal-style gold-silver
deposit at the Bauloora Project.
The Bauloora Project is located in the Central Lachlan Fold Belt NSW, which is host to world-class
copper-gold orebodies including the Cadia-Ridgeway, Northparkes, and Cowal Mines. It is in a zone
which is bounded to the west by the Gilmore Fault Zone and to the east by the Cootamundra Fault.
Bauloora contains structural remnants of Early Silurian dominantly dacitic volcanic rocks and related
granites, Siluro-Devonian sediments and felsic volcanic rocks deposited on a basement of Late
Ordovician turbidites, Late Ordovician to Early Silurian intermediate volcanic rocks and related
intrusions and sedimentary rocks.
Figure 5: Schematic model for epithermal and porphyry mineralisation with an interpretation of features at
Bauloora1, modified from Global Ore Discovery https://www.globalorediscovery.com.
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 6 of 13
Exploration Activities on other Projects
No exploration results were reported for the remaining Legacy Minerals projects in the quarter.
Upcoming June 2023 Quarter – Proposed Work Program
Over the last 6 months Legacy Minerals focus has been on delivering value at it’s Bauloora Project
which led to successfully signing a Joint Venture agreement with the world’s largest gold miner,
Newmont Corporation.
The Company has now re-commenced exploration across its 100% owned exploration portfolio that
includes epithermal, porphyry Cu-Au, and Cobar-type targets. Over the next quarter the Company has
the following activities planned:
Bauloora – Au/Ag Project - (Newmont $15M farm-in)
•
The Company is awaiting assays from its maiden diamond drilling campaign at Bauloora where
significant low sulphidation epithermal veins were intercepted. These are expected to return by
mid-May. In addition to drill testing the Breccia Sinter Prospect, and aerial magnetics, the
Company will announce additional work programs in the coming weeks.
Cobar – Cu/Au Project - (100% LGM)
•
Modelling of the Xcite AEM survey and surface geochemistry surveys across high priority AEM
target areas.
Rockley – Cu/Au Project - (100% LGM)
•
Advanced Spaceborne Thermal Emission and Reflection Radiometer (ASTER) modelling and the
completion of northern soil geochemistry survey.
Harden – Au Project - (100% LGM)
•
Fixed-wing regional airborne magnetics and radiometrics.
Fontenoy – Cu/Au Project - (Earth AI Alliance)
•
Completion of reconnaissance surface geochemistry programs across key target areas.
•
Pending the results of reconnaissance surface geochemistry a drill campaign may be completed.
Mulholland – Sn/Ni/Cu Project - (Earth AI Alliance)
•
Completion of reconnaissance surface geochemistry programs across key target areas.
•
Pending the results of reconnaissance surface geochemistry a drill campaign may be completed.
Black Range – Au/Ag Project - (100% LGM)
•
Digitisation of historical data and commencement of field work including mapping, rock chip
sampling, and soil geochemical sampling.
The Black Range Project is in the Central Lachlan Fold Belt, NSW, which hosts world-class copper-gold
orebodies including the Cadia-Ridgeway, North Parkes and Cowal Mines. Black Range is a late
Devonian, early Silurian volcanic system dominated by acid volcanics. Rhyolite to dacitic volcanism
with lavas, breccias and tuffs are widely distributed and associated with epithermal mineralisation. A
5.2km2 zone of silica-sericite-pyrite alteration has been mapped with low-sulphidation gold
mineralisation intercepted in historical shallow percussion and diamond drilling vi. The interpreted low
temperature quartz and low-iron sphalerite that is associated with gold mineralisation indicates the
Projects may host a large, preserved epithermal environment.
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 7 of 13
Figure 6: Black Range Project showing geology, granted and pending licenses.
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 8 of 13
ASX Additional Information
Exploration and evaluation expenditure during the quarter totalled $785,000 1. This included $545,000
for drilling and drilling ancillary costs, $16,000 for geophysical programs, $30,000 for geochemistry
programs, $7,000 for license fees, $3,000 for land access and compensation and $184,000 for other
costs including ancillary costs, salaries, and sub-contractors. Full details of exploration activity during
the quarter are set out in this Report.
There were no substantive mining production and development activities during the quarter.
Payments to related parties of the Company and their associates during the quarter totalled $223,000
for salaries, superannuation and director’s fees. Table 1 and Table 2 set out the Company’s
expenditure since listing:
Table 1: Updated Use of Funds
Current Quarter
($’000’s)
Actual to March
2023 ($’000’s)
Estimate of the first 2
years after ASX
Admission 2 ($’000’s)
Exploration (drilling,
assays, geochemistry, etc.)
786
3,259
4,012
General Working Capital
410
2,024
1,828
Costs Not Directly
Attributed to the Capital
Raising
-
525
Cost Directly Attributable
to Capital Raising
-
Item
903
304
Table 2: Quarterly Expenditure by Exploration Tenement
Item
Exploration – Cobar
Actual to March 2023
($’000’s)
Estimate of the first 2 years
after ASX Admission2 ($’000’s)
188
786
7
71
1,003
1,141
-
65
Exploration – Rockley
121
440
Exploration – Bauloora
1,833
1,003
Exploration – Binalong
32
NA
Exploration – Fontenoy
36
506
Exploration – Mulholland
39
NA
3,259
4,012
Exploration – Cobar South
Exploration – Harden
Exploration – Harden Greater
Total
Further details of exploration and evaluation expenditure are included in the Company’s Appendix 5B “Mining
exploration entity or oil and gas exploration entity quarterly cash flow report” for March 2023 Quarter.
2
ASX: LGM 6 September 2021 Statement of Commitments, ASX: LGM 6 September Updated Pro-forma
Statement of Financial Position, Legacy Minerals Holdings Limited Prospectus (Dated 28 July 2021)
1
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 9 of 13
ASX Market Sensitive Announcements
•
•
•
•
•
11 January 2023
18 January 2023
15 February 2023
1 March 2023
14 March 2023
Bauloora Awarded Two Government Funding Grants
Diamond drilling commences at Bauloora Project
Significant new discovery at the Bauloora Epithermal Project
Drilling intersects further epithermal veins and sulphides
Interim Financial Report 31 December 2022
Tenement Register
Table 3: LGM Tenement Register
Tenement
Reference Location
Cobar
EL8709
Cobar, NSW
Cobar South
EL9256
Cobar, NSW
Extended
Cobar South
EL9465
Cobar, NSW
Cobar
Consolidated
EL9511
Harden
Status
Beneficial
Interest at
31/03/2023
Acquired/Disposed
NA
Transferred
to EL9511
NA
Cobar, NSW
Live
100%
NA
EL8809
Harden, NSW
Live
100%
NA
Harden
Greater
EL9257
Harden, NSW
Live
100%
NA
Bauloora
EL8994
Cootamundra,
NSW
Live
100%
NA
Bauloora
West
EL9464
Cootamundra,
NSW
Live
100%
NA
Fontenoy
EL8995
Wallendbeen,
NSW
Live
100%
NA
Mulholland
EL9330
Bourke, NSW
Live
100%
NA
Black Range
EL9466
Binalong, NSW
Live
100%
NA
NA
Transferred to
EL9511
Corporate
Newmont Farm-In and Joint Venture Agreement
Newmont has the right, but is not under any obligation, to earn up to an 80% interest in the Joint
Venture Property by incurring the following expenditure as set out below:
Phase 1 Earn-in
Subject to satisfying the minimum commitments, Newmont may acquire a 51% farm-in interest in the
tenements by:
•
•
•
•
Spending a total of A$5 million within 48 months, including the completion of 4,000m of
drilling within 48 months from the commencement of the agreement;
Drill testing the Breccia Sinter Prospect by the 31st of December 2023;
Completing a regional aerial magnetic survey by the 31st of December 2023, and
A$2 million spend within 24 months.
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 10 of 13
Phase 2 Earn-in
Subject to completion of Phase 1, Newmont may earn a further 24% farm-in interest in the tenements
by spending an additional A$10 million and completion of a further 8,000m of drilling within 48
months.
Withdrawal
If Newmont elects not to make the Phase 2 Payment, Newmont will be deemed to have withdrawn
from the Joint Venture and must dispose of its participating interest. If Newmont does not dispose of
its participating interest in the joint venture property within the divesture period (within 12 months
of Phase 1 completion), Newmont must transfer its participating interest in the Joint Venture property
back to Legacy Minerals in return for a 2.0% net smelter return royalty over the tenements. Legacy
Minerals may elect to buy back the divestment royalty from Newmont for an amount equal to 75% of
the Phase 1 Earn-in Expenditure.
Financing Option
Legacy Minerals may elect to bring Newmont’s interest in the Joint Venture Property to 80%
by Newmont funding Legacy’s share of future expenditure until commencement of
commercial production, pursuant to a mining joint venture agreement. Recovery of the loan would
be made from 80% of sale proceeds of Legacy's in-kind share of minerals resulting from joint
venture activities conducted in any given quarter, less the joint venture costs in that quarter.
Exploration Alliance Agreement
Legacy Minerals has an Exploration Alliance Agreement with Earth AI Pty Ltd covering its Fontenoy
(EL8995) and Mulholland Tenements (EL9330). The Strategic Alliance allows for a co-funding model,
whereby Earth AI will contribute up to $4.5M AUD of total exploration costs across the tenements
over a two-year period, with an option to extend for a further year.
Two Government Funding Grants Awarded
Legacy Minerals announced the award of a $100,000 drilling grant. The Company received the
$100,000 grant from the NSW Government, under the New Frontiers Exploration Program, to support
a diamond drilling program at the Bauloora Project. The drill campaign has been designed to test the
Breccia Sinter Prospect.
A $48,000 geophysics grant under the New Frontiers Exploration Program by the NSW Government
was also received for the Bauloora Epithermal Gold Project. This grant will fund a large-scale drone
magnetic survey across the low-sulphidation epithermal vein field.
This will be the first diamond drilling program ever completed at the Breccia Sinter Prospect and will
provide significant new data including:
•
•
the controls and characteristics of gold-silver mineralisation,
orientation measurements of structures such as veins, faults and lithological contacts,
petrophysical downhole survey and assay data.
Legacy Minerals has also received a $48,000 grant under the program to support a drone magnetic
survey over a 47.5km2 wide area of the Bauloora Project at 50m line spacing. The geophysics program
will extend the data along the vein trends to further scope out the scale of the system and help to
identify the structures of the low sulphidation epithermal system, enabling more accurate drill
targeting and understanding of the system.
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 11 of 13
Approved by the Board of Legacy Minerals Holdings Limited.
For more information:
Chris Byrne
Victoria Humphries
CEO & Managing Director
Media & Investor Relations
chris.byrne@legacyminerals.com.au
victoria@nwrcommunications.com.au
+61 (0) 499 527 547
+61 (0) 431 151 676
DISCLAIMER AND PREVIOUSLY REPORTED INFORMATION
Information in this announcement is extracted from reports lodged as market announcements referred to above
and available on the Company’s website https://legacyminerals.com.au/. The Company confirms that it is not
aware of any new information that materially affects the information included in the original market
announcement and that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed.
This announcement contains certain forward-looking statements. Forward looking statements are only
predictions and are subject to risks, uncertainties and assumptions which are outside of the control of Legacy
Minerals Holdings Limited (LGM). These risks, uncertainties and assumptions include commodity prices,
currency fluctuations, economic and financial market conditions, environmental risks and legislative, fiscal or
regulatory developments, political risks, project delay, approvals and cost estimates. Actual values, results or
events may be materially different to those contained in this announcement. Given these uncertainties, readers
are cautioned not to place reliance on forward-looking statements. Any forward-looking statements in this
announcement reflect the views of LGM only at the date of this announcement. Subject to any continuing
obligations under applicable laws and ASX Listing Rules, LGM does not undertake any obligation to update or
revise any information or any of the forward-looking statements in this announcement to reflect changes in
events, conditions or circumstances on which any forward-looking statements is based.
COMPETENT PERSON’S STATEMENT
The information in this Report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore
Reserves is based on information compiled by Thomas Wall, a Competent Person who is a Member of the
Australian Institute of Geoscientists. Mr Wall is the Technical Director and a full-time employee of Legacy
Minerals Pty Limited, the Company’s wholly-owned subsidiary and a shareholder of the Company. Mr Wall has
sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Wall consents
to the inclusion in the Report of the matters based on his information in the form and context in which it appears
in this announcement.
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 12 of 13
About Legacy Minerals
Legacy Minerals is an ASX listed public company that has been involved in the acquisition and
exploration of gold, copper, and base-metal projects in the Lachlan Fold Belt since 2017. The Company
has seven projects that present significant discovery opportunities for shareholders.
Au-Cu (Pb-Zn) Cobar (EL9511)
Au Harden (EL8809, EL9257)
Undrilled targets next door to the Peak Gold Mines.
Several priority geophysical anomalies and gold in
lag up to 1.55g/t Au.
Large historical high-grade quartz-vein gold
mineralisation. Drilling includes 3.6m at 21.7g/t Au
116m and 2m at 17.17g/t Au from 111m.
Au-Ag Bauloora (EL8994, EL9464) Newmont JV
Au-Cu Fontenoy (EL8995) EARTH AI-Alliance
One of NSW’s largest low sulphidation epithermal
systems with a 27km2 epithermal vein field.
An 8km long zone of Au and Cu anomalism. Drill
intercepts incl. 79m at 0.27% Cu from 1.5m.
Cu-Au Rockley (EL8296)
Sn-Ni-Cu Mulholland (EL9330) EARTH AI-Alliance
Prospective for porphyry Cu-Au and situated in the
Macquarie Arc Ordovician host rocks with historic
high-grade copper mines that graded up to 23% Cu.
Numerous tin and nickel occurrences with trends up
to 2.6km defined in drilling and significant
intercepts including 44m at 0.45% Ni.
Au-Ag Black Range (EL9466)
Extensive low sulphidation epithermal system with limited historical exploration.
Figure 7: Map of central NSW, Australia, showing Legacy Minerals tenements (red) and geographical location
of major mining and exploration projectsi,ii,iii,iv,v,vii,viii,ix
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 13 of 13
REFERENCED DOCUMENTS
i
CMOC Northparkes Mining and Technical Information
ii
Newcrest Mining Annual Mineral Resources and Ore Reserves Statement 17 February 2022
iii
Evolution Mining 2022 Annual Report
iv
Regis Resources Annual Mineral Resource and Ore Reserve Statement 8 June 2022
v
Alkane Resource and Reserve Statement FY22, 9 September 2022
vi 1992 Newcrest Mining Limited (R00001533) License 3137 Goondah
vii
Alkane Resources Kaiser Resource Estimate of ~4.7M Gold Equivalent 27 February 2023
viii
Sandfire Resources NL 2019 Annual Report
ix
Silver Mines, Ord Minnett East coast Mining Conference, March 2023
Bowdens Mineral Equivalent: Bowdens silver equivalent: Ag Eq (g/t) = Ag (g/t) + 33.48*Pb (%) + 49.61*Zn (%) + 80*Au (g/t)
calculated from prices of US$20/oz silver, US$1.50/lb zinc, US$1.00/lb lead, US$1600/oz gold and metallurgical recoveries of
85% silver, 82% zinc and 83% lead, 85% gold estimated from test work commissioned by Silver Mines Limited.
Table 4: Major Mineral Resources of NSW
Project & Company
Mineral
Resource
Measured
Resource
Indicated
Inferred
Resource
Resource
Bowdens, NSW (Silver Mines Ltd)
396Moz AuEq
236 AgEq
88 AgEq
73 AgEq
Boda-Kaiser, NSW (Alkane Resources Ltd)
7.26Moz Au,
1.38Mt Cu
-
-
7.26Moz Au, 1.38Mt
Cu
Tomingley, NSW (Alkane Resources Ltd)
1.75Moz Au
0.13M Au
1.019Moz Au
0.59Moz
McPhillamys, NSW (Regis Resources Ltd)
2.29Moz Au
2.28Moz Au
0.001Moz Au
Cadia-Ridegway, NSW (Newcrest Mining
Ltd)
33.31Moz Au,
7.9Mt Cu
0.31Moz Au,
0.041Mt Cu
33Moz Au,
7.3Mt Cu
0.75Moz, 1.1Mt Cu
Cowal, NSW (Evolution Mining Limited)
9.618Moz Au
0.367Moz Au
7.33Moz Au
1.92Moz Au
Temora, NSW (Sandfire Resources Ltd)
2.2Moz 728kt
Cu
-
0.381Moz Au,
83kt Cu
1.8Moz Au, 645kt Cu
1.1Moz Au,
1.1Mt Cu
0.35Moz Au, 0.33Mt
Cu
Nth Parkes, NSW (CMOC Mining Pty Ltd
3.09Moz Au,
2.63Mt Cu
1.64Moz Au,
1.2Mt Cu
SIGN UP TO LEGACY MINERALS
INTERACTIVE INVESTOR HUB
ASX: LGM
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
LEGACY MINERALS HOLDINGS LIMITED
ABN
Quarter ended (“current quarter”)
43 650 398 897
31 March 2023
Consolidated statement of cash flows
Current quarter
Year to date (9
months)
$A’000
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
-
-
(a) exploration & evaluation
-
-
(b) development
-
-
(c) production
-
-
(d) staff costs
(64)
(149)
(e) administration and corporate costs
(359)
(688)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
13
10
1.9
Net cash from / (used in) operating
activities
(410)
(827)
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(b) tenements
(18)
(48)
(c) property, plant and equipment
(59)
(66)
(d) exploration & evaluation 1
(785)
(1,581)
(e) investments
-
-
(f)
-
(3)
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(862)
(1,698)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
1,206
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
(6)
(545)
(7)
(16)
(30)
(3)
(158)
(26)
(785)
(616)
(48)
(125)
(294)
(25)
(362)
(111)
(1,581)
(a) entities
2.2
other non-current assets
Proceeds from the disposal of:
1 Investing Exploration & Evaluation Payments:
Drilling
Licence fees
Geophysical
Geochemistry
Land access
Salaries
Other
Total
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
3.5
Proceeds from borrowings
-
-
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
-
1,200
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,713
2,766
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(410)
(827)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(862)
(1,698)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
1,200
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
1,441
1,441
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Previous quarter
$A’000
1,446
2,718
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (Company Credit Cards)
(5)
(5)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,441
2,713
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
122 2
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
101 3
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
-
-
7.4
Total financing facilities
-
-
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(410)
8.2
(Payments for exploration &