Outstanding Economics Confirms Drake Project Potential
Released
Released
Announcement PDF
ASX Announcement
11 April 2025
Outstanding Economics Confirms Drake Project’s Potential
Results highlight compelling resource and exploration growth opportunities
Stage 1 Scoping Study Results
•
Mining Plus, a global mining services provider, was engaged to review and update the 2020 PreFeasibility Study (2020 PFS i,1) following the recently updated 2025 Mineral Resource Estimate (MRE)ii.
•
Due to the outstanding results of this review and with a goal of a more extensive study, Legacy Minerals
elected to complete a Stage 1 Scoping Study (Study) as an alternative to updating the 2020 PFS.
•
A potential Stage 2 Study will assess the inclusion of 450koz Au and 24.3Moz Ag defined in the recently
updated 2025 MRE ii, which were not evaluated in the Stage 1 Scoping Study.
•
This Study demonstrates robust economics and provides valuable information to help drive potential
resource growth through infill, expansion, and exploration drilling.
Highlights (refer to the Cautionary Statement on page 2)
Base Case $4,250/oz Gold Price (pre-tax)
NPV at 8%
A$303 million
IRR
120%
Free cash flow
A$325M
Total Gold Production
177,100oz Au
Mine Life of Stage 1 Study
5.5 Years
All-in-sustaining cost
A$1,709/oz
IRR
151%
Free cash flow
A$417M
A$5,000/oz Gold Price (pre-tax)
NPV at 8%
A$404 million
Key Parameters
•
Payback period of 14 months from pre-tax cash flows.
•
Average gold production of 35,230oz pa with 83% gold recovery.
•
Mine design is based on open-pit mining methods, with a 1MT processing plant.
•
Value of already built haul roads, water supply, and tailings dam demonstrated by A$47M CAPEX.
•
Planned processing of 5.27Mt of material at an average grade of 1.26g/t Au for 177,100oz gold.
Significant Improvement from 2020 Pre-feasibility Study1)
•
The NPV (Net Present Value) increased by 206% (from $132M at A$2,300/oz in 2020i).
Next Steps and 2025 Drake Mineral Resource Estimate
•
The Company will also continue to focus on the Project's compelling exploration discovery potential
and resource growth opportunities stemming from the recently updated 2025 MREii, which included:
1) 0.8Moz Gold-Equivalent (AuEq)1 from two gold-rich deposits (23.1Mt at 1.1g/t AuEq), and
2) 35Moz Silver-Equivalent (AgEq)1 from two silver-rich deposits (11.3Mt at 99g/t AgEq).
1 See Section ‘Endnotes’ page 10; 2 See Section ‘Appendix A’ page 9 for JORC MRE details and Au/AgEq calculations.
Page 1 of 10 | ABN 43 650 398 897
3/202 Russell Street Bathurst, 2795
www.legacyminerals.com.au
ASX: LGM
Page 2 of 10
Legacy Minerals Holdings Limited (ASX: LGM, “LGM”, “the Company” or “Legacy Minerals”) is pleased to
provide an update on the Stage 1 Scoping Study at the Drake Epithermal Gold-Silver Project (“Project”) in
NSW (EL6273, EL9616, EL9727, ALA75).
Management Comment – Legacy Minerals CEO & Managing Director Christopher Byrne said:
“This is a significant outcome for shareholders and a pleasing return on our ongoing exploration efforts at
the Drake Project. This Scoping Study confirms the outstanding and compelling opportunity of the Drake
Project. With the new 2025 Mineral Resource Estimate now completed and considering the established
infrastructure at Drake, this Stage 1 Scoping Study demonstrates the clear value of the Project and its
potential upside through future resource growth and discovery.
In this Stage 1 Study, the Drake Project has the potential to deliver an average of 32,200oz of gold per
annum at an "all-in sustaining cost" ("AISC") of A$1,709/oz over an initial five-and-a-half-year production
period. At an assumed base case gold price of A$4,250/oz - well below current spot prices - the Project is
expected to deliver robust margins and generate strong free cashflows averaging A$59 million pre-tax per
annum during its first five years of operation and a robust NPV of A$302 million.
This base case has a significant upside, with 24.3Moz of silver and 450koz of gold remaining outside the
Stage 1 Scoping Study. Impressively, the pre-tax NPV increases to A$404 million and the IRR to 151% at a
gold price of A$5,000/oz.
The airborne mobile-magnetotelluric geophysical survey is also now complete at Drake. The results will
provide the first systematic look at the broader region in 30 years, and we’re excited by the potential insights
it will deliver both near the mine and regionally. The Company is also awaiting drilling assay results from
six holes at Mt Carrington.
With this Stage 1 Study complete and multiple exploration activities underway at the Drake and Thomson
Projects, we look forward to updating our shareholders of our progress.”
Cautionary Statement
The Scoping Study is a preliminary technical and economic assessment of the Drake Project. It considers the
potential viability of the Project based on low-level technical and economic assessments. These assessments
are insufficient to support the estimation of Ore Reserves or an investment decision. Further evaluation
work and studies are required before Legacy Minerals can provide assurance of an economic development
case or certainty that the conclusions of the study will be realised.
Mineral Resources considered in the Study include both Indicated and Inferred category resources as
described under the JORC Code (2012 Edition). Investors are cautioned that there is a low level of geological
confidence in Inferred Mineral Resources, and there is no certainty that further exploration work will result
in the determination of Indicated Mineral Resources or that the production targets themselves will be
realised. Further exploration and evaluation work and appropriate studies are required before Legacy
Minerals will be in a position to estimate any Ore Reserves or to provide any assurance of an economic
development case.
The Scoping Study is based on the material assumptions outlined below. These include assumptions about
the availability of funding, access agreements, and the future granting of leases required for mining. While
Legacy Minerals considers all of the material assumptions to be based on reasonable grounds, there is no
certainty that they will prove correct or that the range of outcomes indicated by the Scoping Study will be
achieved. To achieve the range of outcomes indicated in the Scoping Study, funding of in the order of $46
million will likely be required. Investors should note that there is no certainty that the Company will be able
to raise that amount of funding when needed. It is also possible that such funding may only be available on
terms that may be dilutive to or otherwise affect the value of the Company’s existing shares.
Given the uncertainties involved, investors should not make any investment decisions based solely on the
results of the Scoping Study.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 3 of 10
The Drake Project
The Drake Project is a low-sulphidation epithermal system containing three granted exploration
licenses covering 390km2 and an Assessment Lease Application (ALA75) covering 0.46km2 over the
Mt Carrington Area. An assessment lease authority exists as a ‘bridge’ between exploration and
mining, where progression to mining status is reasonably foreseeable.
The Project encompasses substantial infrastructure on the granted exploration licenses, including a
tailings dam, grid easements, a 750ML water source, a site office, accommodation, a core shed, and
core processing facilities. This Study covers resources and infrastructure contained across ALA75 and
Exploration License EL6273.
Figure 1. Drake Project Location, NSW, Australia; key towns and infrastructure.
Study Overview and Key Outcomes
Mining Plus was requested by the Company to report the mining inventory from the 2025 Mineral
Resource Estimateii within the White Rock Minerals 2020 Pre-Feasibility (PFS)i. The 2020 PFS scope
only included a portion of the gold component of the Mt. Carrington Group Resource.
This work resulted in an updated mine schedule and cost estimation. In addition, it was reported as a
2025 mining-only Scoping Study using 2020 PFS assumptions and report sections that were not
covered in this scope of work. As such, for additional supporting information, this report should be
read in conjunction with the 2017 PFS iii and the 2020 Updated PFSi.
2F2F
The outcome of the study is a mining inventory, as summarised below in Table 1. The stockpile is
unverified but has been included in the schedule.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 4 of 10
Table 1: Total Mining Inventory Results
Mt Carrington Group
Tonnes (Mt)
Grade (g/t Au)
Contained Gold (koz)
Stockpile (unverified)
0.21
0.7
4
Indicated
3.82
1.32
162
Inferred
1.24
1.18
47
Notes:
1. All figures are rounded to reflect appropriate levels of confidence. Apparent differences may occur due
to rounding
2. Tonnage and grade include dilution and loss
Mining Plus has escalated the Project's operating and capital costs; however, since the release of the
2020 PFS, there have been no additional metallurgical, geotechnical, hydrological, or tailings
management studies. Therefore, these parameters are unchanged in this update.
The 2025 Scoping Study project life results in a pre-tax free cash flow of $324.5 million. The Scoping
Study has resulted in a project life to over five years, producing 175,400 ounces of gold with an NPV
of A$303.4 million. This includes the total mining inventory and unverified stockpiles. The key metrics
for the Scoping Study are summarised in Table 2, and the cash flows are shown in Figure 2.
Table 2: Key Scoping Study Project Metrics
Description
Unit
Total
Mining Tonnage
Mt
19.4
Production (ex-pit)
Mt
5.06
Mt
5.27
g/t Au
1.26
koz Au
213.5
Mill Recovery
%
83
Gold Produced
koz Au
177
Mine Life
Yr
5.5
Capital Cost
A$M
46.8
Operating Cost
A$M
297
Gross Revenue
A$M
753
Pre-Tax Cash Flow
A$M
324.5
NPV8
A$M
303
IRR
%
120
Payback Period
months
14
Milled
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
$120
$100
$80
A$ (Million)
$60
$40
$20
$0
-$20
0
1
2
3
4
5
6
-$40
-$60
$450
$420
$390
$360
$330
$300
$270
$240
$210
$180
$150
$120
$90
$60
$30
$0
-$30
-$60
-$90
-$120
-$150
A$ (Million)
Page 5 of 10
Year
Pre-Tax Cash Flow
Disc Cash Flow
Accumulated
Figure 2. Annual Cash Flows Updates 2025 – mine inventory and mining costs
Key Study Outcomes and Assumptions
Table 3: Key Metrics – 2017 Pre-feasibility Studyiii, 2020 Pre-feasibility Studyi, and 2025 Scoping Study
Description
Unit
2017 PFS
2020 PFS
2025 SS
IRR
%
34
82
120
NPV8
A$M
23.9
93.6
303
Pre-Tax Cash Flow
A$M
37.6
126.3
324.5
Payback Period
months 22
14
14
Pre-Production CAPEX (inc. Contingency)
A$M
35.6
39
46.8
Total Tonnage Milled
Mt
3.9
4.8
5.27
Gold Produced
oz
147,300
165,700
177,100
Throughput Rate
MTPA
1.0
1.0
1.0
Initial Life of Mine
yrs
4.6
5.0
5.5
Average Annual Production Gold
oz/yr
36,000
35,500
32,200
C1 Cash Cost
A$/oz
1,078
1,056
1,310
All-In Sustaining Cost (ASIC) (OPEX +Sustaining
CAPEX)
A$/oz
1,236
1,327
1,709
Australian Gold Price Assumed
A$/oz
1,700
2,300
4,250
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 6 of 10
Table 4: Comparison of the 2020 PFS and 2025 Scoping Study Financial Model
2020 PFS Update
Key Metric
at Different
Gold Prices
A$/oz
$2,300
2025 Financial Model Update - SS
A$3,000
$3,500
$4,000
$4,250
$4,500
$5,000
Free cash
flow - Pretax
117
170
232
294
325
355
417
NPV, A$M
94
136
203
270
303
337
404
IRR, %
82.3%
63.8%
87.1%
109.1%
119.8%
130.4%
151.1%
Payback
Period,
months
14
21
17
15
14
14
12
Upcoming Work
Airborne mobile-MT Complete
The airborne mobile magnetotellurics (MT) survey was completed after substantial delays due to wet
weather associated with tropical ex-cyclone Alfred, which impacted northern NSW. Results and
interpretations are expected within six weeks.
MT has been successfully used by companies, including K92 Mining Inc., to define targets in a gold-copper
epithermal setting interpreted to be similar to Drake. This geophysical methodology supported K92’s
Kainantu growth from 0.88Moz AuEq in 2015 iv to 18Moz AuEq in 2024 v.
3F3F
4F4F
Diamond Drill Core Assays
Six previously unsampled historical diamond drill-core holes are progressing through the laboratory, with
assays expected to be returned by the end of the month.
Potential Resource Upside Drivers
The Drake Mineral Resource Estimate has a strong potential for converting resources to higherconfidence resources with further metallurgical work and increased drill density. Potential extensions
to known mineralisation along strike and at depth also provide opportunity to grow the mineral
resource estimate. Significantly, the drilling across the Drake Project is relatively shallow and highly
concentrated around the Mt Carrington Area, leaving many areas of interest untested or poorly
tested.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 7 of 10
For more information:
Investors:
Chris Byrne
CEO & Managing Director
chris.byrne@legacyminerals.com.au
+61 (0) 499 527 547
Media:
Nicholas Read
Read Corporate
nicholas@readcorporate.com.au
+61 (0) 419 929 046
DISCLAIMER AND PREVIOUSLY REPORTED INFORMATION
Information in this announcement is extracted from reports lodged as market announcements referred to above and
available on the Company’s website https://legacyminerals.com.au/. The Company confirms that it is not aware of any new
information that materially affects the information included in the original market announcement and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed.
This announcement contains certain forward-looking statements. Forward looking statements are only predictions and are
subject to risks, uncertainties and assumptions which are outside of the control of Legacy Minerals Holdings Limited (LGM).
These risks, uncertainties and assumptions include commodity prices, currency fluctuations, economic and financial market
conditions, environmental risks and legislative, fiscal or regulatory developments, political risks, project delay, approvals and
cost estimates. Actual values, results or events may be materially different to those contained in this announcement. Given
these uncertainties, readers are cautioned not to place reliance on forward-looking statements. Any forward-looking
statements in this announcement reflect the views of LGM only at the date of this announcement. Subject to any continuing
obligations under applicable laws and ASX Listing Rules, LGM does not undertake any obligation to update or revise any
information or any of the forward-looking statements in this announcement to reflect changes in events, conditions or
circumstances on which any forward-looking statements is based.
COMPETENT PERSON’S STATEMENT
The information in this Report that relates to Exploration Targets and Exploration Results is based on information compiled
by Thomas Wall, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Wall is the Technical
Director and a full-time employee of Legacy Minerals Pty Limited, the Company’s wholly-owned subsidiary, and a shareholder
of the Company. Mr Wall has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Wall consents to the
inclusion of the matters based on this information in the form and context in which it appears in this announcement.
The information in this announcement that relates to production targets, assumptions on Modifying Factors and evaluation
of other relevant factors is based on, and fairly represents information and supporting documentation that has been
compiled under the supervision of Mr David Billington (Mining), a Competent Person who is a Member of the Australasian
Institute of Mining and Metallurgy (AusIMM). Mr Billington is an employee and security holder of Mining Plus Pty Ltd. Mr.
Billington has reviewed and approved the technical content of this announcement. Mr Billington has sufficient experience
that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources
and Ore Reserves’ (the JORC Code). Mr Billington consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 8 of 10
About Legacy Minerals
Legacy Minerals is an ASX-listed public company exploring gold, copper, and base-metal projects in NSW since
2017. The Company has nine projects that present significant discovery opportunities for shareholders.
0BAu-Ag Black Range (EL9464, EL9589)
Extensive low-sulphidation, epithermal system with
limited historical exploration. Epithermal occurrences
across 30km of strike.
1BCu-Au Drake (EL6273, EL9616, EL9727, ALA75)
Large caldera (~150km2) with similar geological
characteristics to other major pacific rim low-sulphidation
deposits.
2BCu-Au Rockley (EL8926)
3B Au-Cu (Pb-Zn) Cobar (EL9511) Helix JV
Prospective for porphyry Cu-Au and situated in the
Macquarie Arc Ordovician host rocks with historic highgrade copper mines that graded up to 23% Cu.
Undrilled targets next door to the Peak Gold Mines.
Several priority geophysical anomalies and gold in lag up
to 1.55g/t Au.
Au-Ag Bauloora (EL8994, EL9464) Newmont JV
One of NSW’s largest low-sulphidation, epithermal
systems with a 27km2 epithermal vein field.
Cu-Au Glenlogan (EL9614) S2 Resources JV
Large, undrilled magnetic anomaly underneath Silurian
cover located 55kms from Cadia Valley.
6B Au Harden (EL9657)
Extensive historical high-grade quartz-vein gold
mineralisation. Drilling includes 3.6m at 21.7g/t Au 116m
and 2m at 17.17g/t Au from 111m.
Au-Cu Fontenoy (EL8995) Earth AI JV
Significant PGE, Au and Cu anomalism defined in soil
sampling and drilling. Significant drill intercepts include
120m @ 0.3g/t PGE from 298, and 79m at 0.27% Cu from
1.5m.
4BCCu-Au Thomson (EL9190, EL9194, EL9728)
Prospective for intrusion-related gold and copper systems the project contains numerous ‘bullseye’ magnetic and
gravity anomalies that remain untested.
Figure 3. Location of Legacy Minerals’ Projects in NSW, Australia, and major mines and deposits
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 9 of 10
Appendix A: Resources
Table 5: Mineral Resource Estimates for the Gold-Rich Resources at the Drake Project1)
Indicated
Resource
Estimates
Inferred
Total Resource
Tonnes
(Mt)
Grade
AuEq
(g/t)
Metal
AuEq
(koz)
Tonnes
(Mt)
Grade
AuEq
(g/t)
Metal
AuEq
(koz)
Tonnes
(Mt)
Grade
AuEq
(g/t)
Metal
AuEq
(koz)
Red Rock
-
-
-
8.6
0.8
232
8.6
0.8
232
Mt Carrington
Group – Gold
Rich
Resources
5.7
1.4
257
8.9
1.1
315
14.5
1.2
560
Total
5.7
1.4
257
17.5
1.0
547
23.1
1.1
792
Table 6: Mineral Resource Estimates for the Silver-Rich Resources at the Drake Project
Indicated
Resource
Estimates
Inferred
Total Resource
Tonnes
(Mt)
Grade
AgEq
(g/t)
Metal
AgEq
(Moz)
Tonnes
(Mt)
Grade
AgEq
(g/t)
Metal
AgEq
(Moz)
Tonnes
(Mt)
Grade
AgEq
(g/t)
Metal
AgEq
(Moz)
White Rock
Group
3.1
104
10
3.1
79
8
6.2
92
18
Mt Carrington
Group – Silver
Rich
Resources
2.6
118
10
2.5
95
8
5.1
106
17
Total
5.7
111
20
5.6
86
16
11.3
99
35
Table 5 and Table 6 Notes:
1. The preceding statements of Mineral Resources conform to the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code) 2012 Edition. All tonnages
reported are dry metric tonnes. Minor discrepancies may occur due to rounding to appropriate
significant figures reflecting the confidence level in the Mineral Resources.
2. All Mineral Resources are constrained within optimised pit shells determined using a gold price of
A$3,600/oz and a silver price of A$43/oz (as well as a Cu price of A$14,000/t; Zn price of A$4,200/t
and a Pb price of A$3,150/t).
3. The Mineral Resources for gold-rich deposits at Red Rock, Strauss, Kylo, Guy Bell and Carrington are
reported at a 0.35g/t AuEq cutoff. The Mineral Resources for silver-rich deposits at Silver King, Lady
Hampden, Lead Block, White Rock and White Rock North are reported at a 35g/t AgEq cut-off.
4. Estimates are rounded to reflect the level of confidence in the Mineral Resources at the time of
reporting.
5. Refer to the following sections of this release and Appendix B, ‘JORC Table 1’, for further details on
the Mineral Resource Estimate. Please refer to the compliance statements for details on parameters
used to calculate metal equivalents.
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Page 10 of 10
Metal Equivalent Calculations
For Red Rock and Mt Carrington, AuEq is calculated using the formula: AuEq = Au + 0.00986xAg +
1.237237xCu + 0.3493xZn + 0.2784xPb. Recoveries applied are 83.1% (Au), 68.6% (Ag), 85% (Cu), 80%
(Zn) and 85% (Pb). For White Rock, AgEq is calculated using the formula: AgEq = Ag + 84.0712xAu +
93.2167xCu + 36.0156xZn + 27.0117xPb. Recoveries applied are 72% (Au), $71.7% (Ag), 66% (Cu), 85%
(Zn) and 85% (Pb). Mt Carrington Silver Deposit Ag + 82.4186xAu + 63.0108xCu + 27.0046xZn +
21.5193xPb, Recoveries applied are 83.1% (Au), 68.6% (Ag), 85% (Cu), 80% (Zn) and 85% (Pb).
Formulas calculated using silver price of A$43/oz, gold price of A$3,600/oz, copper price of
A$14,000/t, zinc price of A$4,200/t and lead price of A$3,150/t. In the opinion of the Company, all
elements included in the metal equivalent calculation have a reasonable potential to be sold and
recovered based on current market conditions and metallurgical test work up to 2017.
Appendix B: JORC Tables
The Mineral Resource Estimate used in this Scoping Study was previously reported in accordance with
the JORC Code (2012 Edition) in the Company’s ASX Release titled "New Drake Resource of 0.8Moz
Gold-Eq and 35Moz Silver-Eq" dated 13 March 2025.
The information in that release included the relevant JORC Table 1 (Sections 1–3), and there have been
no material changes to the Mineral Resource or the assumptions underpinning it since that time. As
such, the JORC Table 1 has not been reissued in this document.
Appendix C Endnotes
i
ASX Release WRM, 19 August 2020, Exceptional Updated Gold Pre-Feasibility Study Results
ii
ASX Release LGM, 13 March 2025, New Drake Resource of 0.8Moz Gold-Eq and 35Moz Silver-Eq
ASX Release WRM, 27 December 2017, Mt Carrington Gold-Silver Project Pre-Feasibility Study Confirms a
Financially Robust Gold First Stage
iii
iv Otterburn Announces K92 Completes Purchase of Kainantu Mine from Barrick Gold Corp. and Files Initial Independent
Technical Report and Resource Estimate, March 11, 2015 (Otterburn Resources Corp)
Category
Tonnage
Grade (AuEq)
Inferred
1,840,000
11.6
Indicated
240,000
13.3
Growing Production & Transformative Discoveries, Site Visit Presentation, October 23-24, 2024, K92 Mining Inc.;
Independent Technical Report Mineral Resource Estimate Blue Lake Porphyry Deposit, Kainantu, Papua New Guinea, K92
Mining Inc., 01 August 2022; Independent Technical Report, Kainantu Gold Mine, Updated Integrated Development Plan,
Kainantu Project, Papua New Guinea, Definitive Feasibility Study and Preliminary Economic Analysis, National Instrument 43101 Technical Report, January 1, 2024
v
Category
Tonnage
Grade (AuEq)
Inferred (Kora/Judd)
16,500,000
8.48
Indicated (Kora/Judd)
4,000,000
9.05
Measured (Kora/Judd)
4,100,000
10.92
Inferred (Blue Lake)
549,000,000
0.61
Appendix D: Scoping Study
SIGN UP TO LEGACY MINERALS’
INTERACTIVE INVESTOR HUB
ASX: LGM
Legacy Minerals Mt Carrington
Mining Only Scoping Study
LEGACY MINERALS MT
CARRINGTON MINING ONLY
SCOPING STUDY
PROJECT COMPLETION DATE: April 2025
LEGACY MINERALS
Document Control Information
Legacy Minerals Mt Carrington
Mining Only Scoping Study
MP 13771- LM-MtCarrington-Scoping
Study
REVISION
No.
DATE
1
10/04/2025
Revision Tracking
Revision
Prepared By
Reviewed By
Issued For
Approved By
Date
1
D Billington
P Lock
FV
P Lock
10/4/2025
Issued For: Review and Comment (RC), Information Only (IO), Implementation (IM), Final Version (FV).
Quality Control
Signature
Principal Author
D BILLINGTON
Date
Principal Peer
and Report
Reviewer
P LOCK
10/4/2025
Signature
Date
10/4/2025
Reviewers
IMPORTANT INFORMATION:
THIS DOCUMENT HAS BEEN PREPARED FOR THE EXCLUSIVE USE OF THE CUSTOMER ON THE BASIS OF INSTRUCTIONS, INFORMATION
AND DATA SUPPLIED BY THEM AND REGARDS THIS AS COMPLETE AND ACCURATE. THIS DOCUMENT AND ITS CONTENTS ARE
CONFIDENTIAL AND MAY NOT BE DISCLOSED, COPIED, QUOTED OR PUBLISHED UNLESS MINING PLUS PTY LTD (MP) HAS GIVEN ITS PRIOR
WRITTEN CONSENT. MINING PLUS ACCEPTS NO LIABILITY FOR ANY LOSS OR DAMAGE ARISING AS A RESULT OF ANY PERSON OTHER
THAN THE NAMED CUSTOMER ACTING IN RELIANCE ON ANY INFORMATION, OPINION OR ADVICE CONTAINED IN THIS DOCUMENT. THIS
DOCUMENT MAY NOT BE RELIED UPON BY ANY PERSON OTHER THAN THE CLIENT, ITS OFFICERS AND EMPLOYEES. MINING PLUS
ACCEPTS NO LIABILITY FOR ANY MATTERS ARISING IF ANY RECOMMENDATIONS CONTAINED IN THIS DOCUMENT ARE NOT CARRIED
OUT, OR ARE PARTIALLY CARRIED OUT, WITHOUT FURTHER ADVICE BEING OBTAINED FROM MINING PLUS UNLESS EXPLICITLY STATED
OTHERWISE, THIS DOCUMENT, OR PARTS THEREOF, IS FOR THE CUSTOMER’S INTERNAL PURPOSES ONLY AND IS NOT INTENDED FOR
EXTERNAL COMMUNICATION. NO PERSON (INCLUDING THE CUSTOMER) IS ENTITLED TO USE OR RELY ON THIS DOCUMENT AND ITS
CONTENTS AT ANY TIME IF ANY FEES (OR REIMBURSEMENT OF EXPENSES) DUE TO MINING PLUS BY ITS CLIENT ARE OUTSTANDING. IN
THOSE CIRCUMSTANCES, MINING PLUS MAY REQUIRE THE RETURN OF ALL COPIES OF THIS DOCUMENT.
Legacy Minerals Mt Carrington Mining
Only Scoping Study
CONTENTS
Figures & Tables ......................................................................................................................... 3
EXECUTIVE SUMMARY ............................................................................................................... 4
1
Introduction ....................................................................................................................... 6
2
1.1 Scope of Work ............................................................................................................. 6
Mine Planning Parameters................................................................................................. 7
2.1 Mining Costs ................................................................................................................ 7
2.2 Gold Price Assumption ................................................................................................ 9
2.3 Processing Recoveries ................................................................................................. 9
2.4 Cut Off Grade .............................................................................................................. 9
2.5 Pit Slopes ................................................................................................................... 10
3 Pit Design ......................................................................................................................... 11
3.1 Design Parameters .................................................................................................... 11
3.2 Pit Design ................................................................................................................... 11
3.3 Waste Dump Review ................................................................................................. 14
4 Production Schedule ........................................................................................................ 19
4.1 Mine Sequence .......................................................................................................... 20
4.2 Mill Feed Sequence ................................................................................................... 20
4.3 Mining Costs .............................................................................................................. 22
5 Financial Model ................................................................................................................ 23
5.1 Financial Inputs ......................................................................................................... 23
5.2 Scoping Study Case.................................................................................................... 25
6 Forward Work Plan .......................................................................................................... 28
7
Cautionary Statement and JORC Code compliance ......................................................... 29
References ............................................................................................................................... 30
DEFINE
|
PLAN
|
OPERATE
2
Legacy Minerals Mt Carrington
Mining Only Scoping Study
FIGURES & TABLES
Table 1 – Total Mining Inventory Results .................................................................................. 4
Table 2 – Key SS Project Metrics for the 2025 SS ...................................................................... 5
Table 3 – Summary of mining cost comparison 2020 against 2024 .......................................... 7
Table 4 – Processing Recoveries ...........................................................
Share your feedback
Discover