Maiden drill campaign intersects visible gold at Harden
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
16 SEPT 2021
Maiden Drill Campaign Intersects Visible Gold at the Harden
Gold Mine Prospect
•
•
•
•
•
Visible gold has been observed in several RC drill chips in drill hole RC21HN006 at
80-81m down hole
RC21HN006 was designed to test gold surrounding the historically mined ore body
at the Harden Gold Mine
Drilling across 800m of strike has intersected moderate-strong zones of quartzsericite-pyrite alteration up to 17m wide (downhole width) with assays pending
1,900m of drilling is planned with 5 holes completed of an initial 12 hole campaign
Field reconnaissance has also extended the interpreted strike of the historical mine
workings to 1.4km (from 900m)
Visible Gold
10mm
RC21HN006 80-81m
Figure 1: Visible gold observed in RC chip (RC21HN006 80-81m) 1
Note with respect to any visible gold observed, it must be cautioned that visual observations are uncertain in nature
and should not be taken as a substitute for appropriate laboratory analysis. Laboratory assays will be reported when
they are received and interpreted.
1
ACN 622 746 187
Level 7, 1 Margaret Street Sydney
ASX: LGM
Page 1 of 12
www.legacyminerals.com.au
Testing the Potential of the High-Grade Historical Harden Gold Mine Corridor
•
•
•
•
The Harden Project encompasses several historical high-grade gold mines in a mineral district
that produced >460,000 oz of gold from alluvial and hard rock mining2
The historical hard rock mines within Legacy Minerals’ tenement are the largest in the district
The largest mine was the high-grade Harden Gold Mine that produced ~55,000 oz at 21.7g/t
Au before 1919 with a cut-off grade of approximately 13g/t Au 2
o Legacy Minerals campaign is the first to test the fresh rock mineralisation of this
excellent exploration opportunity
Dipole-Dipole induced polarisation (DD-IP) has also been recently completed along the 1.4km of
strike and the Company is currently interpreting the results:
o This is the first IP has ever been completed on the prospect
Figure 2: Rig in position to test along strike of the historic Harden Gold Mine
The drill campaign has been designed to test extensions of high-grade gold mineralisation
historically mined at the Harden Gold Mine. Mineralisation has historically been reported to occur
in quartz veining in association with pyrite and minor amounts of galena, sphalerite and
arsenopyrite2.
Historical records indicate a mined cut-off grade of 13g/t Au prior to 1919, with Legacy Minerals
interpreting that there may be economic concentrations of unmined gold in quartz veining. Drill
holes have been planned to test within the mined and unmined stoped areas, down-dip and downplunge of the historic mine, and along the strike of the Harden Gold Mine Corridor workings2.
Previously, Legacy Minerals interpreted the strike of the old workings to be approximately 900m
long. Field reconnaissance and ground truthing has extended the known strike of old workings along
the mineralised trend to approximately 1.4km, with modelling of the Harden Gold Mine Corridor
now including Harden East, Harden Future, Harden Gold Mine, Harden Central, and Harden
Extended (Figure 3).
2
Refer to Legacy Minerals Holdings Limited Prospectus dated 28 July 2021
Page 2 of 12 | ACN 622 746 187
Level 7, 1 Margaret Street Sydney
www.legacyminerals.com.au
ASX: LGM
Five holes have been completed in the campaign, with another seven remaining along 800m of strike
between Harden Gold Mine and Harden Extended. Five out of six holes have intercepted zones of
quartz-sericite-pyrite alteration up to 17m (downhole width) with anomalous pathfinder elements
observed through in field pXRF analysis. Observations include:
•
•
•
•
•
•
RC21HN001: 10m of quartz-sericite-pyrite alteration with intermittent areas of intense chlorite
alteration after targeting the immediate area west of Harden Extended (assays pending);
RC21HN002: drilling in progress;
RC21HN003: 17m of quartz-sericite-pyrite alteration with anomalous pathfinders at depth to
the east of the main Harden Gold Mine workings, in line with the strike of the old workings
(assays pending);
RC21HN004: 14m of quartz-sericite-pyrite alteration with anomalous pathfinders 100m above
RC21HN003, in line with the strike of the old workings (assays pending);
RC21HN005: 17m of quartz-sericite-pyrite alteration within an area of unstoped ground at the
main Harden Gold Mine. 2.5m of massive quartz veining with abundant pyrite and arsenopyrite
with minor galena observed (assays pending);
RC21HN006: 7m of quartz-sericite-pyrite alteration within an area of stoped ground at the main
Harden Gold Mine. 1m of massive quartz veining with visible gold, galena, arsenopyrite, pyrite
and sphalerite followed immediately by 3m of interpreted backfill material in stope (Harden
Gold Mine) (assays pending).
Figure 3: Aerial view looking south-east along the line of RC holes towards drill rig on hole RC21HN006
Page 3 of 12 | ACN 622 746 187
Level 7, 1 Margaret Street Sydney
www.legacyminerals.com.au
ASX: LGM
Figure 4: Plan view showing completed holes and planned holes.
Figure 5: Harden Gold Mine cross section showing holes RC21HN005 and RC21HN006 with observed
quartz-sericite-pyrite alteration (QSP).
Page 4 of 12 | ACN 622 746 187
Level 7, 1 Margaret Street Sydney
www.legacyminerals.com.au
ASX: LGM
Figure 6: Long Section of Harden Gold Mine Corridor showing completed holes and planned holes
Table 1. Drill hole collar details for completed RC drill holes
Drillhole Name
Easting
Northing
Elevation
Datum
RC21HD004
RC21HD003
RC21HN001
RC21HN005
RC21HN006
628188.1
628188.1
627424.5
628031.3
628031.3
6177958
6177958
6178288
6178020
6178020
433.6456
433.6456
419.1659
428.991
428.991
GDA94 / MGA zone 55
GDA94 / MGA zone 55
GDA94 / MGA zone 55
GDA94 / MGA zone 55
GDA94 / MGA zone 55
Azimuth
Dip
EOH
193
195
200
180
200
50
70
70
65
50
166
204
138
144
85
Assays and Results
The Company has now delivered 5 drill holes for assays with an expected turnaround time of 3-4
weeks. Final assays for the entire drill campaign are expected to come by the second week of
October.
About the Harden Project
The Harden Project encompasses several historical high-grade gold mines in a mineral district that
produced >460,000 oz of gold from alluvial and hard rock mining. The historical mines within Legacy
Minerals’ Harden tenement are the largest hard rock mines in the district producing a combined
total of ~75,000 oz Au at an average grade of 28.6g/t – all before 1919. There are two main strikes
of mine in the tenement area – the historical Harden Gold Mine corridor and McMahons Reef Gold
mine corridor3.
The Project presents an advanced-stage brownfields exploration opportunity. Historical high-grade
drill intersects at the Harden Gold mine area returned a best intercept of 3m @ 10.5g/t Au from
20m and at the southern McMahons Reef Gold Mine 3.6m @ 21.7g/t Au from 115m 3.
3
Refer to Legacy Minerals Holdings Limited Prospectus dated 28 July 2021
Page 5 of 12 | ACN 622 746 187
Level 7, 1 Margaret Street Sydney
www.legacyminerals.com.au
ASX: LGM
Figure 7: Overview showing the Harden Exploration Licences
COVID-19
Legacy Minerals continues to manage its operations in compliance with COVID-19 regulations issued
by the NSW State Government and Commonwealth authorities. The Company is proactively
managing its drilling and field programs to protect the health and safety of our team, service,
providers, and the wider community. The Company has also been informed by the laboratory that
there are delays in processing assays results due to the COVID-19 testing and isolation requirements.
The Company is working with the laboratory to manage this situation.
Approved by the board of Legacy Minerals Holdings Limited.
For more information:
Chris Byrne
CEO & Managing Director
chris.byrne@legacyminerals.com.au
+61 (0) 409 392 326
Victoria Humphries
Media & Investor Relations
victoria@nwrcommunications.com.au
+61 (0) 431 151 676
Page 6 of 12 | ACN 622 746 187
Level 7, 1 Margaret Street Sydney
www.legacyminerals.com.au
ASX: LGM
About Legacy Minerals
Since 2017, Legacy Minerals has been involved in the acquisition and exploration of gold, copper,
and base-metal projects in the prospective Lachlan Fold Belt in New South Wales. The Company
has five tenements – the Cobar Project (EL8709 and EL9256), Harden Project (EL8809 and EL9257),
Bauloora Project (EL8994), Fontenoy Project (EL8995) and Rockley Project (EL8296). All of Legacy
Minerals’ projects are 100% owned and present significant discovery opportunities for gold, copper
and base-metal mineralisation.
Figure 8: Legacy Minerals’ Tenements, Lachlan Fold Belt NSW
Information in this announcement is extracted from the Company’s Prospectus dated 28 July 2021 lodged as a market announcement on
9 September 2021. The Company confirms that it is not aware of any new information that materially affects the information included in
the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed.
This announcement contains certain forward-looking statements. Forward looking statements are only predictions and are subject to risks,
uncertainties and assumptions which are outside of the control of Legacy Minerals Holdings Limited (LGM). These risks, uncertainties
and assumptions include commodity prices, currency fluctuations, economic and financial market conditions, environmental risks and
legislative, fiscal or regulatory developments, political risks, project delay, approvals and cost estimates. Actual values, results or events
may be materially different to those contained in this announcement. Given these uncertainties, readers are cautioned not to place reliance
on forward-looking statements. Any forward-looking statements in this announcement reflect the views of LGM only at the date of this
announcement. Subject to any continuing obligations under applicable laws and ASX Listing Rules, LGM does not undertake any
obligation to update or revise any information or any of the forward-looking statements in this announcement to reflect changes in events,
conditions or circumstances on which any forward-looking statements is based.
COMPETENT PERSONS STATEMENT The information in this report that relates to Exploration Targets, Exploration Results, Mineral
Resources or Ore Reserves is based on information compiled by Thomas Wall, a Competent Person who is a Member of the Australian
Institute of Geoscientists. Mr Wall is the Technical Director is a full-time employee of Legacy Minerals Limited and a shareholder, who
has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Wall consents to the inclusion in the report of the matters based on his information in the form
and context in which it appears.
Page 7 of 12 | ACN 622 746 187
Level 7, 1 Margaret Street Sydney
www.legacyminerals.com.au
ASX: LGM
Appendix 1 – JORC Code, 2021 Edition Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code Explanation
Commentary
Nature and quality of sampling (e.g., cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting the
broad meaning of sampling.
RC Sampling: All samples from the RC drilling are taken as 1m
samples for laboratory assay. Samples are collected using
cone or riffle splitter. Geological logging of RC chips is
completed at site with representative chips being stored in
drill chip trays. Magnetic susceptibility was recorded from the
green bulk bag for each meter by a KT-10 mag sus meter.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
RC Sampling: Samples are taken on a one metre basis and
collected using uniquely numbered calico bags. The remaining
material for that metre is collected and stored in a green
plastic bag marked with that specific metre interval. The
cyclone is cleaned with compressed air after each plastic and
calico sample bag is removed. If wet sample or clays are
encountered then the cyclone is opened and cleaned
manually and with the aid of a compressed air gun. A blank
sample is inserted at the beginning of each hole, and a
duplicate sample is taken every 50th sample. A certified
sample standard is also added according to geology, but at no
more than 1:50 samples.
Geological logging of RC chips is completed at site with
representative chips being stored in drill chip trays. Downhole
surveys of dip and azimuth are conducted using a single shot
camera every 30m, and using a downhole Gyro when
required, to detect deviations of the hole from the planned
dip and azimuth. The drill‐hole collar locations are recorded
using a hand‐held GPS, which has an accuracy of +/‐ 5m. All
drill‐hole collars may be surveyed to a greater degree of
accuracy using a certified surveyor at a later date.
Sampling
Techniques
An Olympus Vanta pXRF is used to systematically analyse the RC
sample onsite. One reading is taken per metre with field
calibration of the pXRF instrument using standards periodically
performed (usually daily).
Drilling
techniques
Aspects of the determination of mineralisation
that are Material to the Public Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
Drill type (eg core, reverse circulation, open‐hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (eg core diametre, triple or
standard tube, depth of diamond tails, facesampling
bit or other type, whether core is
oriented and if so, by what method, etc).
Method of recording and assessing core and
chip sample recoveries and results assessed.
The handheld pXRF results are only used for preliminary
assessment of element compositions, prior to the receipt of assay
results from the certified laboratory.
Mineralisation was not yet determined. The holes were
geologically logged and the magnetic susceptibility was
recorded from the calico bag for each meter by a KT-10 mag
sus meter.
Samples have been sent to a laboratory and will be reported
upon once results are received.
RC Sampling: The RC drilling uses a 140 mm diameter face
hammer tool. High capacity air compressors on the drill rig are
used to ensure a continuously sealed and high‐pressure
system during drilling to maximise the recovery of the drill
cuttings, and to ensure chips remain dry to the maximum
extent possible.
RC Sampling: RC samples are visually checked for recovery,
moisture and contamination. Geological logging is completed at
site with representative RC chips stored in chip trays. Sample
weights were recorded on site using digital scales for each
calico sample.
Drill sample
recovery
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
RC Sampling: Samples are collected using cone or riffle splitter.
Geological logging of RC chips is completed at site with
representative chips being stored in drill chip trays. Sample sizes
were monitored and the splitter was regularly agitated to
reduce the potential for sample contamination
Logging
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter,
half or all core taken.
If non‐core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Sub‐sampling
techniques and
sample
preparation
Quality control procedures adopted for all subsampling
stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second‐half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometres, handheld
XRF instruments, etc, the parametres used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and precision
have been established.
To date, no sample recovery issues have yet been identified that
would impact on potential sample bias in the competent fresh
rocks that host the mineralised sulphide intervals.
Geological logging is carried out on all drill holes with lithology,
alteration, mineralisation, structure and veining recorded.
Logging of RC samples records lithology,
mineralogy, mineralisation, structures , weathering, colour and
other noticeable features. Chip trays were photographed in wet
form.
All drill holes are geologically logged in full and lithogeochemical
information is collected by the field XRF unit. The data relating to
the elements analysed is used to determine further information
regarding the rock composition.
NA
RC samples are collected using acone or riffle splitter when
available. Geological logging of RC chips is completed at site with
representative chips being stored in drill chip trays.
RC Sampling: Sample preparation for RC chips follows a standard
protocol. If a sample is wet or damp it is recorded. Most
samples were dry.
Sample preparation will comprise of an industry standard
of drying, jaw crushing and pulverising to -75 microns
(85% passing). Samples are dried, crushed and pulverized to
produce a homogenous representative sub‐sample for analysis.
Quality control procedures include submission of Certified
Reference Materials (standards) and duplicates with each sample
batch. QAQC results are routinely reviewed to identify and
resolve any issues.
RC Sampling: Field QC procedures maximise representivity of RC
samples and involve the use of certified reference material as
assay standards, along with blanks, duplicates and barren washes.
Duplicate RC samples are captured using two separate sampling
apertures on the splitter approximately every 50m.
The sample sizes are considered to be appropriate to correctly
represent gold mineralisation and associated geology based on:
the style of mineralisation (quartz with minor sulphides), the
thickness and consistency of the intersections and the sampling
methodology.
Not applicable: Lab data not being reported
An Olympus Vanta pXRF is used to systematically analyse the RC
sample onsite. One reading is taken per metre. Field
calibration of the XRF instrument using standards is periodically
performed (usually daily).
The handheld pXRF results are only used for preliminary
assessment of element compositions, prior to the receipt of assay
results from the certified laboratory.
Laboratory QAQC involves the use of internal lab standards using
certified reference material (CRMs), blanks and pulp duplicates as
part of in‐house procedures. The Company also submits a suite of
CRMs, blanks where appropriate and selects appropriate samples
for duplicates.
Sample preparation checks for fineness are performed by the
laboratory to ensure the grind size of 85% passing 75μm is being
attained.
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Verification of
sampling and
assaying
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Location of
data points
Accuracy and quality of surveys used to locate
drill holes (collar and down‐hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing
and
distribution
Orientation of
data in relation
to geological
structure
Sample
security
Audits or
reviews
Data spacing for reporting of Exploration
Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied. Whether
sample compositing has been applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
The measures taken to ensure sample security.
The results of any audits or reviews of sampling
techniques and data.
Significant intersections are verified by the Company’s technical
staff.
No twinned holes have been planned for the current drill
programme.
Primary data is captured onto a laptop through excel and using
Datashed software and includes geological logging, sample data
and QA/QC information. This data, together with the assay data,
is stored both locally and entered into the LGM central online
database which is managed by external consultants.
No adjustments or calibrations will be made to any primary assay
data collected for the purpose of reporting assay grades and
mineralised intervals. For the geological analysis, standards and
recognised factors may be used to calculate the oxide form
assayed elements, or to calculate volatile free mineral levels in
rocks.
A handheld Garmin GPSmap 65 was used to pick up collars with
an averaged accuracy of 1m.
Downhole surveys are conducted using a single shot camera
approximately every 30m or downhole Gyro during drilling to
record and monitor deviations of the hole from the planned dip
and azimuth.
The grid system used is GDA94, MGA Zone 55.
Using government data topography and 2017 DTM data. A
topographic surface has been created using this elevation data
The spacing and distribution of holes is not relevant to the drilling
programs which are at the exploration stage rather than
definition drilling.
The completed drilling at the Project is not sufficient to establish
the degree of geological and grade continuity to support the
definition of Mineral Resource and Reserves and the
classifications applied under the 2012 JORC code.
No compositing has been applied to the exploration results.
The drill holes are drilled to intersect the modelled mineralised
zones at as near perpendicular orientation possible (unless
otherwise stated). However, the orientation of key structures
may be locally variable and any relationship to mineralisation has
yet to be identified.
No orientation based sampling bias has been identified in the
data to date.
Chain of Custody is managed by the Company until samples pass
to a certified assay laboratory for subsampling and assaying. The
RC sample bags are stored on secure sites and delivered to the
assay laboratory by the Company or a competent agent. When in
transit, they are kept in locked premises. Transport logs have
been set up to track the progress of samples.
Sampling techniques and procedures are regularly reviewed
internally, as is data. To date, no external audits have been
completed on the drilling programme.
Section 2 Reporting of Exploration Results
(Criteria in this section apply to all succeeding section)
Criteria
Mineral
Tenement and
Land Status
Exploration
Done by Other
Parties
Geology
Drill hole
Information
Data
aggregation
methods
Relationship
between
mineralisation
widths and
intercept
lengths
Diagrams
Balanced
Reporting
JORC Code Explanation
Commentary
Type, name/reference number, location and
ownership including agreements or material
issues with third parties including joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The Harden Project is comprised of two granted Exploration
Licenses: EL8809 and EL9257. Both licenses are owned 100%
by Legacy Minerals Pty Ltd (a fully owned subsidiary of Legacy
Minerals Holdings Limited). There are no royalties or
encumbrances over the tenement areas.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a licence to operate in the area.
Acknowledgment and appraisal of exploration
by other parties.
Deposit type, geological setting and style of
mineralisation
A summary of all information material to the
understanding of the exploration results
including tabulation of the following
information for all Material drill holes:
• Easting and northing of the drill hole collar
•Elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
• Dip and azimuth of the hole
• Down hole length and interception depth
• Hole length
If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of high
grades) and cut‐off grades are usually Material
and should be stated.
Where aggregated intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
These relationships are particularly important in
the reporting of exploration results. If the
geometry of the mineralisation with respect to
the drill hole angle is known, its nature should
be reported. If it is not known and only the down
hole lengths are reported, there should be a
clear statement to this effect.
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported. These
should include, but not be limited to a plane
view of drill hole collar locations and
appropriate sectional views.
Where comprehensive reporting of all
Exploration Results is not practical,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
The land is primarily freehold land. There are no native title
interests in the license area.
The RC drilling was planned by Legacy Minerals Holdings
exploration staff in consultation with drilling contractor
Durock Drilling.
The Harden Gold Mine prospect is hosted within the Silurian
Young Granodiorite. The prospect is prospective for high-grade
gold mineralisation hosted within low-sulphide quartz veining of
similar style to that which has been historically mined in the area.
See table 1 in the body of the article
Not applicable due to no laboratory assays announced.
Not applicable, no laboratory assays announced
Not applicable, no laboratory assays announced
Assay intersections are reported as down hole lengths. Drill holes
are planned as perpendicular as possible to intersect the
geological targets. At this early stage of drilling and geological
knowledge of the project true widths are estimated to be
approximately 70% of down hole intervals.
A prospect location map, cross section and long section are
shown in the Company’s Prospectus dated 28 July 2021 and
within the body of this report.
Not applicable, no laboratory assays announced.
Reports on historical exploration can be found in the Company’s
Prospectus dated 28 July 2021.
Other
substantive
exploration
data
Further Work
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observation; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large – scale step – out
drilling).Diagrams clearly highlighting the areas
of possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
All material or meaningful data collected has been repo